Design. As between Seller and SCE, Seller, at no cost to SCE, shall be responsible for: (a) Designing and constructing the Generating Facility. (b) Using commercially reasonable efforts to acquire all Permits and other approvals necessary for the construction and Operation of the Generating Facility. (c) Providing to SCE, at least thirty (30) days prior to the Expected Initial Operation Date, the following Generating Facility information: (i) Site plan drawings for the Generating Facility; (ii) Electrical one line diagrams; (iii) Major electrical equipment specifications; (iv) General arrangement drawings; (v) Longitude and latitude of each generator; (vi) Artist renderings of the Site, if any; (vii) Aerial photographs of the Site, if any; (viii) Wind Turbine specification; and (ix) Monitoring system diagrams. (d) Providing SCE advance Notice at the earliest practicable time of any proposed changes in Seller’s Generating Facility with such Notice to include the information set forth in Section 3.09(c) above, along with all specifications and drawings pertaining to any such changes.
Appears in 7 contracts
Samples: Power Purchase Agreement, Power Purchase Agreement, Power Purchase Agreement
Design. As between Seller and SCE, Seller, at At no cost to SCE, Seller shall be responsible for:
(a) Designing and constructing the Generating Facility.
(b) Using commercially reasonable efforts to acquire all Permits and other approvals necessary for the construction and Operation of the Generating FacilityPermits.
(c) Providing to SCE, at least thirty (30) days prior to the Expected anticipated Initial Operation Date, the following Generating Facility information:
(i) Site plan drawings for the Generating Facility;
(ii) Specific identification of each Wind Turbine at the Generating Facility;
(iii) Electrical one line diagrams;
(iiiiv) Major electrical equipment specifications, including all electric power collection systems specifications;
(ivv) General arrangement drawings;
(vvi) Longitude and latitude of each generator;
(vivii) Artist renderings of the Site, if any;
(vii) Aerial photographs of the Site, if any;
(viii) Wind Turbine specificationAerial photographs of Site, if any; and
(ix) Monitoring system diagramsSpecifications for each Wind Turbine identified in Section 3.09(c)(ii).
(d) Providing SCE advance Notice at the earliest practicable time of any proposed changes in Seller’s Generating Facility Facility, with such Notice to include the information set forth in Section 3.09(c) above, along with all specifications and drawings pertaining to any such changeschanges and any changes to Exhibit B.
(e) Providing to SCE, at least twelve (12) months prior to the anticipated Initial Operation Date, the design and specifications for all Generating Facility metering systems.
Appears in 2 contracts
Samples: Renewable Power Purchase and Sale Agreement, Renewable Power Purchase and Sale Agreement
Design. As between Seller and SCE, Seller, at At no cost to SCE, Seller shall be responsible for:
(a) Designing and constructing the Generating Facility.;
(b) Using commercially reasonable efforts to acquire all Permits and other approvals necessary for the construction and Operation of the Generating Facility.Permits;
(c) Providing to SCE, at least thirty (30) days prior to before the Expected anticipated Initial Operation Synchronization Date, the following Generating Facility information:
(i) Site plan drawings for the Generating Facility;
(ii) Electrical one one-line diagrams;
(iii) Control and data-acquisition details and configuration documents;
(iv) Major electrical equipment specifications;
(ivv) General arrangement drawings;
(vvi) Longitude and latitude of each generatorthe Site;
(vivii) Artist renderings of the Site, if any;
(viiviii) Aerial photographs of the Site, if any;
(viiiix) Wind Turbine Current Inverter specification; and;
(ixx) Monitoring system Photovoltaic Module specification;
(xi) Solar energy collection grid diagrams.;
(d) Providing SCE advance Notice at the earliest practicable time of any proposed material changes in Seller’s the Generating Facility with such Facility, but in no event less than thirty (30) days before the changes are to be made, which Notice to must include the information set forth in Section 3.09(c) above3.11(c), along with all specifications and drawings pertaining to any such changes.changes and any changes to Exhibit B.
Appears in 2 contracts
Samples: Renewable Power Purchase and Sale Agreement, Renewable Power Purchase and Sale Agreement
Design. As between Seller and SCE, Seller, at At no cost to SCE, Seller shall be responsible for:
(a) Designing and constructing the Generating Facility.;
(b) Using commercially reasonable efforts to acquire all Permits and other approvals necessary for the construction and Operation of the Generating Facility.Permits;
(c) Providing to SCE, at least thirty (30) days prior to the Expected Forecasted Initial Operation Date, the following Generating Facility information:
(i) Site plan drawings for the Generating Facility;
(ii) Electrical one line diagrams;
(iii) Control and data acquisition details and configuration documents;
(iv) Major electrical equipment specifications;
(ivv) General arrangement drawings;
(vvi) Longitude and latitude of each generator;
(vivii) Artist renderings of the Site, if any;
(viiviii) Aerial photographs of the Site, if any;
(viiiix) Wind Turbine generator specification;
(x) Process flow diagrams;
(xi) Piping and instrumentation diagrams; and
(ixxii) Monitoring system Solar energy collection grid diagrams.
(d) Providing SCE advance Notice at the earliest practicable time of any proposed changes in Seller’s the Generating Facility with Facility, but in no event less than thirty (30) days before the changes are to be made, which such Notice to shall include the information set forth in Section 3.09(c3.10(c) above, along with all specifications and drawings pertaining to any such changes.changes and any changes to Exhibit B.