Common use of Developer Operating Requirements Clause in Contracts

Developer Operating Requirements. The Developer must comply with the Transmission Owner’s operating instructions and requirements including but not limited to Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period LVRT Standard set forth in Appendix G will be determined by the Commission. The Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standard. For purposes of compliance with Appendix G, the Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 cycles. Appendix D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 Xxxx Xx. Xxxxx Xxxxxx, XX 00000-0000 Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix F Addresses for Delivery of Notices and Xxxxxxxx Notices: NYISO:

Appears in 9 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Developer Operating Requirements. The Developer must comply with the Transmission Owner’s operating instructions and requirements including but not limited to Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period LVRT Standard set forth in Appendix G will be determined by the Commission. The Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standard. For purposes of compliance with Appendix G, the Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 cycles. Appendix D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 Xxxx Xx. Xxxxx Xxxxxx, XX 00000-0000 Re: _____________ Large Generating Facility Dear __________________: On [Date] [Developer] has completed Trial Operation of Unit No. ___. This letter confirms that [Developer] commenced Commercial Operation of Unit No. ___ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix F Addresses for Delivery of Notices and Xxxxxxxx Notices: NYISO:

Appears in 7 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements including but not limited to Connecting Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period The post-transition period LVRT Standard standard, as set forth in Appendix G will be determined by G, is applicable to the Commission. The Developer’s Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standardFacility. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 nine (9) cycles. Appendix D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Connecting Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xx. Xxxxx XxxxxxXxxxxxxxxx, XX 00000-0000 Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix F Addresses for Delivery of Notices and Xxxxxxxx Notices: NYISO:: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone: (000) 000-0000 Xxxxxxxx and Payments: Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone (000) 000-0000 Alternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone: (000) 000-0000 Appendix G Interconnection Requirements for a Wind Generating Plant Appendix G sets forth requirements and provisions specific to a wind generating plant. All other requirements of this LGIA continue to apply to wind generating plant interconnections.

Appears in 3 contracts

Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements including but not limited to Connecting Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period The post-transition period LVRT Standard standard, as set forth in Appendix G will be determined by G, is applicable to the Commission. The Developer’s Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standardFacility. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 nine (9) cycles. Appendix D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Connecting Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xx. Xxxxx XxxxxxXxxxxxxxxx, XX 00000-0000 Re: _____________ Large Generating Facility Dear __________________: On [Date] [Developer] has completed Trial Operation of Unit No. ___. This letter confirms that [Developer] commenced Commercial Operation of Unit No. ___ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix F Addresses for Delivery of Notices and Xxxxxxxx Notices: NYISO:: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone: (000) 000-0000 Xxxxxxxx and Payments: Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone (000) 000-0000 Alternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone: (000) 000-0000 Appendix G Interconnection Requirements for a Wind Generating Plant Appendix G sets forth requirements and provisions specific to a wind generating plant. All other requirements of this LGIA continue to apply to wind generating plant interconnections.

Appears in 2 contracts

Samples: Large Generator Interconnection Agreement, Agreement

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements including but not limited to Connecting Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period The post-transition period LVRT Standard standard, as set forth in Appendix G will be determined by G, is applicable to the Commission. The Developer’s Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standardFacility. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 nine (9) cycles. Appendix D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Connecting Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xx. Xxxxx XxxxxxXxxxxxxxxx, XX 00000-0000 Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix F Addresses for Delivery of Notices and Xxxxxxxx Notices: NYISO:: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone: (000) 000-0000 Xxxxxxxx and Payments: Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Accounts Payable 00 00xx Xxxxxx Xxxxx 000 Xxxxxxxxxx, XX 00000 Phone (000) 000-0000 XXXXXXXXXXXX@XXXXXXXXX.XXX Alternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone: (000) 000-0000 Appendix G Interconnection Requirements for a Wind Generating Plant Appendix G sets forth requirements and provisions specific to a wind generating plant. All other requirements of this LGIA continue to apply to wind generating plant interconnections.

Appears in 2 contracts

Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Transmission Owner’s operating instructions and requirements including but not limited to Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period LVRT Standard set forth in Appendix G will be determined by the Commission. The Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standard. For purposes of compliance with Appendix G, the Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 cycles. Appendix D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 Xxxx Xx. Xxxxx Xxxxxx, XX 00000-0000 Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix F Addresses for Delivery of Notices and Xxxxxxxx Billings Notices: NYISO:

Appears in 2 contracts

Samples: Interconnection Agreement, Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Transmission Owner’s operating instructions and requirements including but not limited to Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period LVRT Standard set forth in Appendix G will be determined by the Commission. The Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standard. For purposes of compliance with Appendix G, the Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 cycles. Appendix D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 Xxxx Xx. Xxxxx Xxxxxx, XX 00000-0000 Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix F Addresses for Delivery of Notices and Xxxxxxxx Notices: NYISO:]

Appears in 2 contracts

Samples: Interconnection Agreement, Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements including but not limited to Connecting Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period The post-transition period LVRT Standard standard, as set forth in Appendix G will be determined by G, is applicable to the Commission. The Developer’s Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standardFacility. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 nine (9) cycles. Appendix D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Connecting Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xx. Xxxxx XxxxxxXxxxxxxxxx, XX 00000-0000 Re: _____________ Large Generating Facility Dear __________________: On [Date] [Developer] has completed Trial Operation of Unit No. ___. This letter confirms that [Developer] commenced Commercial Operation of Unit No. ___ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix F Addresses for Delivery of Notices and Xxxxxxxx Notices: NYISO:: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone: (000) 000-0000 Xxxxxxxx and Payments: Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Accounts Payable 00 00xx Xxxxxx Xxxxx 000 Xxxxxxxxxx, XX 00000 Phone (000) 000-0000 XXXXXXXXXXXX@XXXXXXXXX.XXX Alternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone: (000) 000-0000 Appendix G Interconnection Requirements for a Wind Generating Plant Appendix G sets forth requirements and provisions specific to a wind generating plant. All other requirements of this LGIA continue to apply to wind generating plant interconnections.

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements including but not limited to Connecting Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period The post-transition period LVRT Standard standard, as set forth in Appendix G will be determined by G, is applicable to the Commission. The Developer’s Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standardFacility. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 nine (9) cycles. Appendix D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Connecting Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 Xxxx Xx. Xxxxx XxxxxxState Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 18 Link Drive Binghamton, XX 00000NY 13902-0000 5224 Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. _ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix F Addresses for Delivery of Notices and Xxxxxxxx Notices: NYISO:: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 18 Link Drive Binghamton, NY 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone: (000) 000-0000 Xxxxxxxx and Payments: Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 18 Link Drive Binghamton, NY 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Accounts Payable 00 00xx Xxxxxx Xxxxx 000 Pittsburgh, PA 15201 Phone (000) 000-0000 XXXXXXXXXXXX@XXXXXXXXX.XXX Alternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 18 Link Drive Binghamton, NY 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Xxxxx Xxx Xxxx, XX 00000 Phone: (000) 000-0000 Appendix G Interconnection Requirements for a Wind Generating Plant Appendix G sets forth requirements and provisions specific to a wind generating plant. All other requirements of this LGIA continue to apply to wind generating plant interconnections.

Appears in 1 contract

Samples: Large Generator Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements requirements, including but not limited to Connecting Transmission Owner’s Owners’ Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition The Post-transition Period LVRT Standard standard, as set forth in Appendix G will be determined by G, paragraph A.i to this LGIA, is applicable to the Commission. The Developer’s Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standardFacility. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 9 cycles. Appendix SERVICE AGREEMENT NO. 1774 APPENDIX D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Connecting Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E SERVICE AGREEMENT NO. 0000 XXXXXXXX X Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 Xxxxx Energy Center 0000 Xxxxx Xxxxxxx Xxxx Xx. Xxxxx XxxxxxXxxxx, XX 00000NY 13403-0000 2100 Re: _____________ Large Generating Facility Dear __________________: On [Date] [Developer] has completed Trial Operation of Unit No. ___. This letter confirms that [Developer] commenced Commercial Operation of Unit No. ___ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix SERVICE AGREEMENT NO. 1774 APPENDIX F Addresses for Delivery of Notices and Xxxxxxxx Notices: NYISO:: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: Vice President of Transmission New York Power Authority Xxxxx Energy Center 0000 Xxxxx Xxxxxxx Xxxx Xxxxx, NY 13403-2100 Developer: General Counsel CC: Executive Vice President, Asset Operations Marble River, LLC x/x XXX Xxxxxxxxxx Xxxxx Xxxxxxx LLC 000 Xxxxxx, Suite 700 Houston, TX 77002 F-1 SERVICE AGREEMENT NO. 1774 Xxxxxxxx and Payments: Connecting Transmission Owner: New York Power Authority Operating Fund c/o X.X. Xxxxxx Chase, N.A. ABA No.: 000000000 Account No.: 573-804206 Developer: Executive Vice President, Finance Marble River, LLC x/x XXX Xxxxxxxxxx Xxxxx Xxxxxxx LLC 000 Xxxxxx, Suite 700 Houston, TX 77002 Alternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 SERVICE AGREEMENT NO. 1774 Connecting Transmission Owner: Vice President of Transmission New York Power Authority Xxxxx Energy Center 0000 Xxxxx Xxxxxxx Xxxx Xxxxx, NY 13403-2100 Developer: General Counsel CC: Executive Vice President, Eastern Region Marble River, LLC x/x XXX Xxxxxxxxxx Xxxxx Xxxxxxx LLC 000 Xxxxxx, Suite 700 Houston, TX 77002 F-3 SERVICE AGREEMENT NO. 1774 APPENDIX G Interconnection Requirements For A Wind Generating Plant Appendix G sets forth requirements and provisions specific to a wind generating plant. All other requirements of this LGIA continue to apply to wind generating plant interconnections.

Appears in 1 contract

Samples: Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements including but not limited to Transmission Owner’s Operation Coordination Agreementrequirements, as it they may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not The Large Generator shall comply with the Large Generating Facility is eligible for the Transition Post-transition Period LVRT Standard Standard, as set forth in Appendix G will be determined by the Commission. The Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standard. G. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 9 cycles. Appendix With respect to Energy Resource Interconnection Service (“ERIS”), the Large Generating Facility has an approved ERIS of 118.1 MW; however, the Large Generating Facility’s baseline ERIS for purposes of determining non-material increases in capacity under Section 30.3.1 of Attachment X of the OATT remains 112.5 MW. 112.5 MW is the “existing ERIS” level of the Large Generating Facility determined pursuant to Section 30.3.1 of Attachment X of the OATT. With respect to Capacity Resource Interconnection Service (“XXXX”), the Large Generating Facility has a XXXX value as of the Effective Date of 112.5 MW. The Large Generating Facility’s XXXX value will be limited to 112.5 MW unless it is subsequently increased pursuant to an applicable provision of the NYISO OATT. APPENDIX D Security Arrangements Details SECURITY ARRANGEMENTS DETAILS Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix APPENDIX E Commercial Operation Date COMMERCIAL OPERATION DATE [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx 00 Xxxx SchenectadyXxxxxxxxx Rensselaer, NY 12303 Senior Vice President of Transmission 12144 New York Power Authority 000 State Electric & Gas Corporation Attn: Manager – Programs/Projects Electric Transmission Services 00 Xxxx Xx. Xxxxx XxxxxxXxxxxxxxxx, XX 00000-0000 Re: Large Generating Facility Dear : On [Date] [Developer] has completed Trial Operation of Unit No. . This letter confirms that [Developer] commenced Commercial Operation of Unit No. at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix Notices: NYISO: APPENDIX F Addresses for ADDRESSES FOR DELIVERY OF NOTICES AND XXXXXXXX Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, Operations 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager – Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxxx Energy LLC c/o Invenergy Wind Attn: Xxxxxxx Project Manager Xxx Xxxxx Xxxxxx Xxxxx, Suite 1900 Chicago, IL 60606 (000) 000-0000 Xxxxxxxx and Payments: Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager – Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxxx Energy LLC c/o Invenergy Wind Attn: Xxxxxxx Project Manager Xxx Xxxxx Xxxxxx Xxxxx, Suite 1900 Chicago, IL 60606 (000) 000-0000 Alternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, System and Xxxxxxxx NoticesResource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: NYISO:(000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Vice President, Operations 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager – Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxxx Energy LLC c/o Invenergy Wind Attn: Xxxxxxx Project Manager Xxx Xxxxx Xxxxxx Xxxxx, Suite 1900 Chicago, IL 60606 (000) 000-0000 APPENDIX G INTERCONNECTION REQUIREMENTS FOR A WIND GENERATING PLANT Appendix G sets forth requirements and provisions specific to a wind generating plant. All other requirements of this LGIA continue to apply to wind generating plant interconnections.

Appears in 1 contract

Samples: Interconnection Agreement

Developer Operating Requirements. The Developer must comply with the Connecting Transmission Owner’s operating instructions and requirements including but not limited to Connecting Transmission Owner’s Operation Coordination Agreement, as it may change from time to time. The Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. Whether or not the Large Generating Facility is eligible for the Transition Period The post-transition period LVRT Standard standard, as set forth in Appendix G will be determined by G, is applicable to the Commission. The Developer’s Large Generating Facility will comply with the Transition Period LVRT Standard pending issuance of an order by the Commission determining the appropriate LVRT standardFacility. For purposes of compliance with Appendix G, the Connecting Transmission Owner has determined that the Developer shall maintain the Large Generating Facility in service during a three-phase fault for 7 nine (9) cycles. Appendix D Security Arrangements Details Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Connecting Transmission Owners, all Developers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. All personnel working in Transmission Owner’s facilities will require security background checks prior to entering and working in such facilities. Appendix E Commercial Operation Date [Date] New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Senior Vice President of Transmission New York Power Authority 000 State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xx. Xxxxx XxxxxxXxxxxxxxxx, XX 00000-0000 5224 Re: _____________ Large Generating Facility Dear __________________: On [Date] [Developer] has completed Trial Operation of Unit No. ___. This letter confirms that [Developer] commenced Commercial Operation of Unit No. ___ at the Large Generating Facility, effective as of [Date plus one day]. Thank you. [Signature] [Developer Representative] Appendix F Addresses for Delivery of Notices and Xxxxxxxx Billings Notices: NYISO:: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Floor New York, NY 10016 Phone: (000) 000-0000 Billings and Payments: Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Accounts Payable 00 00xx Xxxxxx Xxxxx 000 Pittsburgh, PA 15201 Phone (000) 000-0000 XXXXXXXXXXXX@XXXXXXXXX.XXX Alternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: Before commercial operation of the Large Generating Facility: New York Independent System Operator, Inc. Attn: Xxxxx Xxxx Vice President, System and Resource Planning 00 Xxxx Xxxxxxxxx Rensselaer, NY 12144 Phone: (000) 000-0000 Fax: (000) 000-0000 After commercial operation of the Large Generating Facility New York Independent System Operator, Inc. Attn: Vice President, Operations 0000 Xxxxxx Xxxx Schenectady, NY 12303 Phone: (000) 000-0000 Fax: (000) 000-0000 Connecting Transmission Owner: New York State Electric & Gas Corporation Attn: Manager - Programs/Projects Electric Transmission Services 00 Xxxx Xxxxx Xxxxxxxxxx, XX 00000-0000 Phone: (000) 000-0000 Fax: (000) 000-0000 Developer: Xxxxxx Wind LLC c/o EverPower Wind Holdings Inc. Attn: Xxxxxx Xxxxxxxxxx 00 Xxxx 00xx Xxxxxx, 00xx Floor New York, NY 10016 Phone: (000) 000-0000 Appendix G Interconnection Requirements for a Wind Generating Plant Appendix G sets forth requirements and provisions specific to a wind generating plant. All other requirements of this LGIA continue to apply to wind generating plant interconnections.

Appears in 1 contract

Samples: Agreement