Documents for Owner Review. In addition to any other documents which Contractor is required by the other provisions of the Agreement to provide for Owner’s review, Contractor shall submit copies of the following documents, Drawings and Specifications to Owner for review and comment. These documents are not subject to Owner approval; however, Contractor will consider all Owner comments consistent with Attachment A, including the Basis of Design, Design Criteria/Basis, Feed Documents and Drawings and Specifications updated during performance of the Work. In addition, Owner may select other documents with the agreement of Contractor. a. Process flow diagrams (PFDs) b. Heat and material balances c. Piping and Instrument Diagrams (P&IDs) d. New HAZOP reports and disposition of HAZOP/SIL action items identified in the FEED Documents e. Plot plans f. Fire and gas detector layouts g. Fire monitor water radius layouts h. Tie-In location drawing i. Electrical area classification drawings j. Building layouts k. Material selection diagrams l. Facility Performance Test reports m. Piping Specifications n. Underground piping plans
Appears in 11 contracts
Samples: Lump Sum Turnkey Agreement (Cheniere Energy Partners, L.P.), Lump Sum Turnkey Agreement (Cheniere Energy Partners, L.P.), Lump Sum Turnkey Agreement (Sabine Pass Liquefaction, LLC)
Documents for Owner Review. In addition to any other documents which Contractor is required by the other provisions of the Agreement to provide for Owner’s review, Contractor shall submit copies of the following documents, Drawings and Specifications to Owner for review and comment. These documents are not subject to Owner approval; however, Contractor will consider all Owner comments consistent with Attachment A, including the Basis of Design, Design Criteria/Basis, Feed Documents and Drawings and Specifications updated during performance of the Work. In addition, Owner may select other documents with the agreement of Contractor.
a. Process flow diagrams (PFDs)) B-2
b. Heat and material balances
c. Piping and Instrument Diagrams (P&IDs)
d. New HAZOP reports and disposition of HAZOP/SIL action items identified in the FEED Documents
e. Plot plans
f. Fire and gas detector layouts
g. Fire monitor water radius layouts
h. Tie-In location drawing
i. Electrical area classification drawings
j. Building layouts
k. Material selection diagrams
l. Facility Performance Test reports
m. Piping Specifications
n. Underground piping plans
Appears in 1 contract
Samples: Lump Sum Turnkey Agreement