Dredge Operation Sample Clauses

Dredge Operation. The Lessee will ensure that any contractors conduct all dredging operations in accordance with the ECM. The final approved Plan (required pursuant to Stipulation 1) will include provisions designed to balance efficiency and conservation of the resource during the removal of sand from the OCS Borrow Area. Any modification to this Plan will be coordinated with BOEM for approval prior to commencement of dredging. The purpose of these provisions is to conserve and avoid wasting sand in the OCS Borrow Area that could be used to nourish the beach now and in the future. The lessee will conduct all dredging operations in accordance with requirements outlined in the ECM. Any modification to this Plan will be submitted to BOEM for review prior to commencement of dredging (pursuant to Stipulation No.2).
AutoNDA by SimpleDocs
Dredge Operation. Dredging will be performed so that the dredge excavates OCS sand resources to an overall cut depth not to exceed that approved in the Project borrow design plan (the “overdredge” limit as shown in Attachment 1).
Dredge Operation. The County and/or its agents will ensure that the contractors conduct all dredging operations in accordance with the ECM. The final, approved Plan (required pursuant to Paragraph 1) will include provisions designed to maximize efficiency and conservation of the resource during the removal of sand from Borrow Area A. Any modification to this Plan will be coordinated with BOEM for approval prior to commencement of dredging. The purpose of these provisions is to conserve and avoid “wasting” sediment in Borrow Area A that could be used now and in the future.
Dredge Operation. Dredging will occur preferentially in naturally accreting areas of XX XX and dredging will be avoided in erosional areas of the shoal to the extent possible. If a xxxxxx dredge is used, dredging will be performed so that the xxxxxx dredge excavates material using relatively shallow, uniform passes to an overall cut depth not to exceed that permitted under the Florida JCP Final Order addressing sand compatibility requirements. The USACE will use the methods necessary to maintain the relative profile and shape of the sand shoal complex to the extent practicable, as determined by the USACE, to avoid creating deep depressions or pits.
Dredge Operation. The final, approved Plan (required pursuant to Paragraph 1) will include provisions designed to maximize efficiency and conservation of the resource during the removal of sand from the CS-II Borrow Area. The purpose of these provisions is to avoid “wasting” sediment in the CS-II Borrow Area that could be used to nourish the beach now and in the future. USACE and/or its contractor(s) will conduct all dredging operations in accordance with requirements outlined in the ECM. Any modification to this Plan will be submitted to BOEM for approval prior to commencement of dredging.

Related to Dredge Operation

  • Co-operation 1. The Parties shall take all appropriate and necessary measures to ensure fulfilment of the obligations and objectives arising out of this programme agreement.

Time is Money Join Law Insider Premium to draft better contracts faster.