Efficiency Risks Sample Clauses

Efficiency Risks. The commitment set out in the RSA includes an interim assessment of the increase in care home fees associated the judicial review established in 2015/16. The Council have agreed to fund this in addition to the original opening baseline, along with any additional settlement agreed or instructed in the final decision on the judicial review appeal.  Delivery of the Trust wide Improvement Programme;  Agency and temporary staffing costs;  Increasing costs of medical technologies;  Rate of expenditure in both ASC and Place People;  Delayed delivery of financial benefits associated with the implementation of the revised care model
AutoNDA by SimpleDocs

Related to Efficiency Risks

  • Energy Efficiency The contractor shall comply with all mandatory standards and policies relating to energy efficiency which are contained in the energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub.L. 94-163) for the State in which the work under this contract is performed.

  • Constructability Program 5.2.1 Implement and conduct a constructability program to identify and document Project cost and schedule savings opportunities. The constructability program shall follow accepted industry practices and be reviewed by Owner at design milestones. Whenever the term “value engineering” is used in conjunction with this Agreement or the Project, it has its commonly accepted meaning within the construction industry and does not imply the practice of professional engineering without a license. If any value engineering activities constitute the professional practice of engineering, then such activities shall be performed by an engineer licensed in Texas.

  • Equipment Procurement If responsibility for construction of the Connecting Transmission Owner’s Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades is to be borne by the Connecting Transmission Owner, then the Connecting Transmission Owner shall commence design of the Connecting Transmission Owner’s Attachment Facilities or System Upgrade Facilities or System Deliverability Upgrades and procure necessary equipment as soon as practicable after all of the following conditions are satisfied, unless the Developer and Connecting Transmission Owner otherwise agree in writing:

  • PRODUCTIVITY The Productivity Scheme which was agreed to is: Contained in Annexure B.

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply:

  • Customer Satisfaction 4.1 Services to be provided under Call Off Agreements to the satisfaction of Contracting Bodies 90% Confirmation by the Authority of the Supplier’s performance against customer satisfaction surveys

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • High Risk Use Npcap is not designed, manufactured, or intended for use in hazardous environments requiring fail-safe performance where the failure of the software could lead directly to death, personal injury, or significant physical or environmental damage (“High Risk Activities”). Use of Npcap in High Risk Activities is not authorized.

  • Procurement of Goods and Services (a) If the HSP is subject to the procurement provisions of the BPSAA, the HSP will abide by all directives and guidelines issued by the Management Board of Cabinet that are applicable to the HSP pursuant to the BPSAA.

  • Quality control system (i) The Contractor shall establish a quality control mechanism to ensure compliance with the provisions of this Agreement (the “Quality Assurance Plan” or “QAP”).