Electrification. BED ROOM 2 (Two) Light points. 1 (One) Fan point. 2 (Two) plug point (5AMP) 1 (One) plug point (15AMP)
Electrification. ▪ Electrification are mainly concealed type using copper wire of various dimensions as per architect’s recommendation. ▪ The wires used are branded (Havells or Anchor) and FR (Fire- retardant) grade. Switches and Sockets have been branded (Xxxxxxxx brand). The building has separate earthings for flat-owners and lift. Break-up of electrical points:- ▪ Living / Dining area -03 Nos. Light Points, 01 No. Fan Points 03 Nos. Plug Points. ▪ Bedrooms- 02 No. Light Points, 01 No, Fan Point, 01 No. Plug Point. ▪ Master bedroom is equipped with an A.C. Point. ▪ Kitchen - 01 No. Light Point, 01 No. Fan / Exhaust Fan point, 01 No. Power Point. ▪ Bathroom / Toilets - 02 Nos. Light Points, 01 No. Exhaust Fan Point, 01 No. Power Points. ▪ Besides the above points adequate Nos of electrical points have been provided for running general appliances like refrigerator, washing machine etc. PLUMBING & SANITARY:
Electrification. Concealed and fire resistant wiring of “ISI” Copper Wire, Distribution board with “MCB”. “ISI” mark modular electrical accessories, Landline phone conduit, TV wiring conduit, Separate line for inverter connection, Kitchen : Granite platform, ceramic tiles dado up to 2’ height, Stainless Steel sink in Kitchen, Aqua guard point.
Electrification. All electrical work shall be of concealed wiring upto switch board only without any electrical fittings, as follows:- • At Bed room, 2 light points, 1 fan point and 1 6Amp plug point.
Electrification. (i) Number of Market Centers connected to the electric grid;
Electrification. 10.1 Electrification (if applicable) of any Site not electrified as at the Commencement Date may only be undertaken with the prior written approval of the Airports Company.
Electrification. All electrical work shall be of concealed wiring as follows:- A At bedroom, one tube light, one bracket light point one fan point, and plug point(5 amp). B At drawing room, one tube light point, one bracket light point, one fan point, telephone point, one plug point, (5 amp) with T.V. point shall be provided. C At Dining room one tube light, one bracket light point, one fan point, one plug point(15 amp), for refrigerator shall be provided. D At kitchen room one tube light point, one exhaust fan point, one plug point,(15 amp) over cooking platform shall be provided. E At balcony and toilet one bulb point shall be provided. F At entrance door in each flat one doorbell point shall be provided.
Electrification. As part of the ongoing drive to minimise the impact on the environment and achieve net zero – carbon neutral deliveries, Royal Mail Fleet will continue to invest in electric vehicles. • Royal Mail Fleet will continue the training and upskilling of technicians in workshops maintaining electric vehicles • Royal Mail will share with the CWU the roll out plan of DO’s to be electrified • CWU acknowledge the two lease and maintenance EV trial sites will remain as contractual terms have been agreed. There will be no expansion until the outcome of the trials are reviewed with the CWU
Electrification. As was noted in section 2.3 Project Effects and Impacts, this project has increased the supply of electricity in the Visayas region. It also appears to have raised the rate of electrification. As Table 2.9 showed, the electrification rate in the regions(calculation limited to electricity supplied through power distribution companies)remains low in comparison with the country as a whole . ( In 1995 the rate for the overall Philippines was 69%, while the rate in Visayas was 48%). Interviews with residents of the project area (those living close to the area of the Palinpinon II Geothermal Project in South Negros Island) show that, while the situation is improving, problems occur constantly, such as brownouts at times of peak electrical usage (6~10pm), which disable televisions. Therefore, ongoing improvement, to raise the electrification rate, as means of stepping up electrical supply, is an important task in the Visayasas region.
Electrification. Ausgrid will electrify the relocated distribution system assets on the proposed electrification date (as adjusted in accordance with clause 12.3, if applicable) if you and your ASP/1 have complied with the conditions of this contract that constitute preconditions to electrification as set out in clause 12.4(d).