Energy Saved. This report applies to all projects that include energy efficiency upgrades or fuel switching, water conservation upgrades that save energy, or distributed energy resources. Recipients are required to report on interventions completed as well as planned and actual energy savings.
AutoNDA by SimpleDocs

Related to Energy Saved

  • Energy Cooperation shall focus on: (a) renewable energy; (b) promoting the saving of energy; (c) applied research relating to networks of databases linking the two Parties' economic and social operators; (d) backing efforts to modernise and develop energy networks and the interconnection of such networks with Community networks.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Energy Efficiency The contractor shall comply with all mandatory standards and policies relating to energy efficiency which are contained in the energy conservation plan issued in compliance with the Energy Policy and Conservation Act (Pub.L. 94-163) for the State in which the work under this contract is performed.

  • Energy Conservation The Contractor agrees to comply with mandatory standards and policies relating to energy efficiency which are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act.

  • Fuel The Vehicle must be returned with the amount of fuel equal to that at the time of the commencement of the rental. If the Vehicle is returned with less fuel, the difference will be charged to You at a rate of $5.00 per litre (which includes a service component).

  • Engineer Resources The Engineer shall furnish and maintain quarters for the performance of all services, in addition to providing adequate and sufficient personnel and equipment to perform the services required under the contract. The Engineer certifies that it presently has adequate qualified personnel in its employment for performance of the services required under this contract, or it will be able to obtain such personnel from sources other than the State.

  • Electric If Customer has selected an Electricity Fixed Rate on the Application, Customer’s Price will be based on the Fixed Rate(s) which includes Local and State taxes, Gross Receipts Tax (GRT), PJM Adjustment (defined below) charges and adjustments and Utility applied charges and/or fees related to generation, plus the Administration Charge, which includes, Electricity Balancing Amount and third party utility and billing charges.

  • PROJECT FINANCIAL RESOURCES i) Local In-kind Contributions $0 ii) Local Public Revenues $200,000 iii) Local Private Revenues iv) Other Public Revenues: $0 - ODOT/FHWA $0 - OEPA $0 - OWDA $0 - CDBG $0 - Other $0 v) OPWC Funds: - Loan Assistance $0

  • IRANIAN ENERGY SECTOR DIVESTMENT In accordance with Section 2879-c of the Public Authorities Law, by signing this contract, each person and each person signing on behalf of any other party certifies, and in the case of a joint bid or partnership each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each person is not on the list created pursuant to paragraph (b) of subdivision 3 of Section 165-a of the State Finance Law (See xxxxx://xxx.xx.xxx/iran-divestment-act-2012).

  • Company Resources (a) Company will be solely responsible, at Company's expense, for procuring, maintaining, and supporting all third-party software other than Third Party Products and all workstations, personal computers, printers, controllers or other hardware or peripheral equipment at Company's sites ("Company System") required for Company to operate the Licensed System in accordance with the Documentation and specifications provided by BNYM from time to time. BNYM will provide Company with specifications for Company System, including any requirements relating to the connection and operation of the Company System with the Licensed System and Third Party Products. Company shall conform its operating system environment to the operating system requirements provided by BNYM for the Licensed System. Company will support and maintain the Company System as necessary to ensure its operation does not impact the Licensed System adversely or otherwise in a manner not contemplated by the Documentation. (b) Company shall, at its own expense, devote such of the Company System and other equipment, facilities, personnel and resources reasonably necessary to (a) implement the Licensed System, (b) be trained in the use of the Licensed System, (c) perform timely any electrical work and cable installation necessary for Company's use of the Licensed System, and (d) begin using the Licensed System on a timely basis. BNYM shall not be responsible for any delays or fees and costs associated with Company's failure to timely perform its obligations under this Section 2.7.