Common use of Equipment Testing and Inspection Clause in Contracts

Equipment Testing and Inspection. The Interconnection Customer shall test and inspect its Small Generator Facility including the Interconnection Equipment prior to interconnection in accordance with IEEE Standard 1547 and IEEE Standard1547.1. The Interconnection Customer shall not operate its Small Generator Facility in Parallel with EDC’s Electric Distribution System without prior written authorization by the EDC as provided for in 2.1.1 – 2.1.4. 2.1.1 The EDC shall have the option of performing a Witness Test after construction of the small generator facility is completed. The Interconnection Customer shall provide the EDC at least 20 days notice of the planned Commissioning Test for the small generator facility. If the EDC elects to perform a Witness Test, it shall contact the Interconnection Customer to schedule the Witness Test at a mutually agreeable time within 5 business days of the scheduled commissioning test. If the EDC does not perform the Witness Test within 5 business days of the commissioning test, the Witness Test is deemed waived unless the parties mutually agree to extend the date for scheduling the Witness Test. If the Witness Test is not acceptable to the EDC, the Interconnection Customer will be granted a period of 30 calendar days to address and resolve any deficiencies. The time period for addressing and resolving any deficiencies may be extended upon the mutual agreement of the EDC and the Interconnection Customer. If the Interconnection Customer fails to address and resolve the deficiencies to the satisfaction of the EDC, the applicable cure provisions of 6.5 shall apply. If a Witness Test is not performed by the EDC or an entity approved by the EDC, the Interconnection Customer must still satisfy the interconnection test specifications and requirements set forth in IEEE Standard 1547 Section 5. The Interconnection Customer shall, if requested by the EDC, provide a copy of all documentation in its possession regarding testing conducted pursuant to IEEE Standard 1547.1. 2.1.2 To the extent that the Interconnection Customer decides to conduct interim testing of the Small Generator Facility prior to the Witness Test, it may request that the EDC observe these tests and that these tests be deleted from the final Witness Test. The EDC may, at its own expense, send qualified personnel to the Small Generator Facility to observe such interim testing. Nothing in this Section 2.1.2 shall require the EDC to observe such interim testing or preclude the EDC from performing these tests at the final Witness Test. Regardless of whether the EDC observes the interim testing, the Interconnection Customer shall obtain permission in advance of each occurrence of operating the Small Generator Facility in parallel with the EDC’s system. 2.1.3 Upon successful completion of the Witness Test, the EDC shall affix an authorized signature to the Certificate of Completion and return it to the Interconnection Customer approving the interconnection and authorizing Parallel Operation. Such authorization shall not be unreasonably withheld, conditioned, or delayed.

Appears in 7 contracts

Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement

AutoNDA by SimpleDocs

Equipment Testing and Inspection. The Interconnection Customer shall test and inspect its Small Generator Facility including the Interconnection Equipment prior to interconnection in accordance with IEEE Standard 1547 and IEEE Standard1547.1. The Interconnection Customer shall not operate its Small Generator Facility in Parallel with EDC’s Electric Distribution System without prior written authorization by the EDC as provided for in 2.1.1 – 2.1.4. 2.1.1 2.1.1. The EDC shall have the option of performing a Witness Test after construction of the small generator facility is completed. The Interconnection Customer shall provide the EDC at least 20 days notice of the planned Commissioning Test for the small generator facility. If the EDC elects to perform a Witness Test, it shall contact the Interconnection Customer to schedule the Witness Test at a mutually agreeable time within 5 business days of the scheduled commissioning test. If the EDC does not perform the Witness Test within 5 business days of the commissioning test, the Witness Test is deemed waived unless the parties mutually agree to extend the date for scheduling the Witness Test. If the Witness Test is not acceptable to the EDC, the Interconnection Customer will be granted a period of 30 calendar days to address and resolve any deficiencies. The time period for addressing and resolving any deficiencies may be extended upon the mutual agreement of the EDC and the Interconnection Customer. If the Interconnection Customer fails to address and resolve the deficiencies to the satisfaction of the EDC, the applicable cure provisions of 6.5 shall apply. If a Witness Test is not performed by the EDC or an entity approved by the EDC, the Interconnection Customer must still satisfy the interconnection test specifications and requirements set forth in IEEE Standard 1547 Section 5. The Interconnection Customer shall, if requested by the EDC, provide a copy of all documentation in its possession regarding testing conducted pursuant to IEEE Standard 1547.1. 2.1.2 2.1.2. To the extent that the Interconnection Customer decides to conduct interim testing of the Small Generator Facility prior to the Witness Test, it may request that the EDC observe these tests and that these tests be deleted from the final Witness Test. The EDC may, at its own expense, send qualified personnel to the Small Generator Facility to observe such interim testing. Nothing in this Section 2.1.2 shall require the EDC to observe such interim testing or preclude the EDC from performing these tests at the final Witness Test. Regardless of whether the EDC observes the interim testing, the Interconnection Customer shall obtain permission in advance of each occurrence of operating the Small Generator Facility in parallel with the EDC’s system. 2.1.3 2.1.3. Upon successful completion of the Witness Test, the EDC shall affix an authorized signature to the Certificate of Completion and return it to the Interconnection Customer approving the interconnection and authorizing Parallel Operation. Such authorization shall not be unreasonably withheld, conditioned, or delayed.

Appears in 4 contracts

Samples: Combined Heat and Power Interconnection Agreement, Interconnection Application and Agreement, Combined Heat and Power Interconnection Agreement

Equipment Testing and Inspection. The Interconnection Customer interconnection customer shall test and inspect its Small Generator Facility distributed generation facility including the Interconnection Equipment interconnection equipment prior to interconnection in accordance with IEEE Standard 1547 (2003) and IEEE Standard1547.1Standard 1547.1 (2005). The Interconnection Customer interconnection customer shall not operate its Small Generator Facility distributed generation facility in Parallel parallel with the EDC’s Electric Distribution System 's electric distribution system without prior written authorization by the EDC as provided for in 2.1.1 – 2.1.4Articles 2.1.1-2.1. 2.1.1 The EDC shall have the option of performing perform a Witness Test witness test after construction of the small generator distributed generation facility is completed, but before parallel operation, unless the EDC specifically waives the witness test. The Interconnection Customer interconnection customer shall provide the EDC at least 20 15 business days notice of the planned Commissioning Test commissioning test for the small generator distributed generation facility. If the EDC elects to perform performs a Witness Testwitness test at a time that is not concurrent with the commissioning test, it shall contact the Interconnection Customer interconnection customer to schedule the Witness Test witness test at a mutually agreeable time within 5 10 business days of after the scheduled commissioning testtest designated on the application. If the EDC does not perform the Witness Test witness test within 5 10 business days of after the commissioning test, the Witness Test witness test is deemed waived unless the parties Parties mutually agree to extend the date for scheduling the Witness Testwitness test, or unless the EDC cannot do so for good cause, in which case, the Parties shall agree to another date for scheduling the test within 10 business days after the original scheduled date. If the Witness Test witness test is not acceptable to the EDC, the Interconnection Customer will be granted a period of interconnection customer has 30 calendar business days to address and resolve any deficiencies. The This time period for addressing and resolving any deficiencies may be extended upon the mutual agreement of between the EDC and the Interconnection Customerinterconnection customer. If the Interconnection Customer interconnection customer fails to address and resolve the deficiencies to the satisfaction of the EDC, the applicable cure provisions of Article 6.5 shall apply. If a Witness Test is not performed by the EDC or an entity approved by the EDC, the Interconnection Customer must still satisfy the The interconnection test specifications and requirements set forth in IEEE Standard 1547 Section 5. The Interconnection Customer customer shall, if requested by the EDC, provide a copy of all documentation in its possession regarding testing conducted pursuant to IEEE Standard 1547.1. 2.1.2 To If the extent that the Interconnection Customer decides to conduct interconnection customer conducts interim testing of the Small Generator Facility distributed generation facility prior to the Witness Testwitness test, it may request that the interconnection customer shall obtain permission from the EDC observe these tests and that these tests be deleted from before each occurrence of operating the final Witness Testdistributed generation facility in parallel with the electric distribution system. The EDC may, at its own expense, send qualified personnel to the Small Generator Facility distributed generation facility to observe such interim testing, but it cannot mandate that these tests be considered in the final witness test. Nothing in this Section 2.1.2 shall require the The EDC is not required to observe such the interim testing or preclude precluded from requiring the EDC from performing these tests be repeated at the final Witness Test. Regardless of whether the EDC observes the interim testing, the Interconnection Customer shall obtain permission in advance of each occurrence of operating the Small Generator Facility in parallel with the EDC’s systemwitness test. 2.1.3 Upon successful completion of After the Witness Testdistributed generation facility passes the witness test, the EDC shall affix an authorized signature to the Certificate certificate of Completion completion and return it to the Interconnection Customer interconnection customer approving the interconnection and authorizing Parallel Operationparallel operation. Such The authorization shall not be unreasonably withheld, conditioned, conditioned or delayed.

Appears in 1 contract

Samples: Standard Agreement for Interconnection of Distributed Generation Facilities

Equipment Testing and Inspection. The Interconnection Customer shall test and inspect its Small Generator Facility including the Interconnection Equipment prior to interconnection in accordance with IEEE Standard 1547 and IEEE Standard1547.1. The Interconnection Customer shall not operate its Small Generator Facility in Parallel with EDC’s Electric Distribution System without prior written authorization by the EDC as provided for in 2.1.1 – 2.1.4. 2.1.1 The EDC shall have the option of performing a Witness Test after construction of the small generator facility is completed. The Interconnection Customer shall provide the EDC at least 20 days days’ notice of the planned Commissioning Test for the small generator facility. If the EDC elects to perform a Witness Test, it shall contact the Interconnection Customer to schedule the Witness Test at a mutually agreeable time within 5 business days of the scheduled commissioning test. If the EDC does not perform the Witness Test within 5 business days of the commissioning test, the Witness Test is deemed waived unless the parties mutually agree to extend the date for scheduling the Witness Test. If the Witness Test is not acceptable to the EDC, the Interconnection Customer will be granted a period of 30 calendar days to address and resolve any deficiencies. The time period for addressing and resolving any deficiencies may be extended upon the mutual agreement of the EDC and the Interconnection Customer. If the Interconnection Customer fails to address and resolve the deficiencies to the satisfaction of the EDC, the applicable cure provisions of 6.5 shall apply. If a Witness Test is not performed by the EDC or an entity approved by the EDC, the Interconnection Customer must still satisfy the interconnection test specifications and requirements set forth in IEEE Standard 1547 Section 5. The Interconnection Customer shall, if requested by the EDC, provide a copy of all documentation in its possession regarding testing conducted pursuant to IEEE Standard 1547.1. 2.1.2 To the extent that the Interconnection Customer decides to conduct interim testing of the Small Generator Facility prior to the Witness Test, it may request that the EDC observe these tests and that these tests be deleted from the final Witness Test. The EDC may, at its own expense, send qualified personnel to the Small Generator Facility to observe such interim testing. Nothing in this Section 2.1.2 shall require the EDC to observe such interim testing or preclude the EDC from performing these tests at the final Witness Test. Regardless of whether the EDC observes the interim testing, the Interconnection Customer shall obtain permission in advance of each occurrence of operating the Small Generator Facility in parallel with the EDC’s system. 2.1.3 Upon successful completion of the Witness Test, the EDC shall affix an authorized signature to the Certificate of Completion and return it to the Interconnection Customer approving the interconnection and authorizing Parallel Operation. Such authorization shall not be unreasonably withheld, conditioned, or delayed.

Appears in 1 contract

Samples: Interconnection Agreement

AutoNDA by SimpleDocs

Equipment Testing and Inspection. The Interconnection Customer shall test and inspect its Small Generator Facility including the Interconnection Equipment prior to interconnection in accordance with IEEE Standard 1547 and IEEE Standard1547.1Standard 1547.1. The Interconnection Customer shall not operate its Small Generator Facility in Parallel with EDC’s Electric Distribution System without prior written authorization by the EDC as provided for in Article 2.1.1 – 2.1.4. 2.1.1 The EDC shall have the option of performing a Witness Test after construction of the small generator facility Small Generator Facility is completed. The Interconnection Customer shall provide the EDC at least 20 days days’ notice of the planned Commissioning Test for the small generator facilitySmall Generator Facility. If the EDC elects to perform a Witness Test, it shall contact the Interconnection Customer to schedule the Witness Test at a mutually agreeable time within 5 business days of the scheduled commissioning test. If the EDC does not perform the Witness Test within 5 business days of the commissioning test, the Witness Test is deemed waived unless the parties Parties mutually agree to extend the date for scheduling the Witness Test. If the Witness Test is not acceptable to the EDC, the Interconnection Customer will be granted a period of 30 calendar days to address and resolve any deficiencies. The time period for addressing and resolving any deficiencies may be extended upon the mutual agreement of the EDC and the Interconnection Customer. If the Interconnection Customer fails to address and resolve the deficiencies to the satisfaction of the EDC, the applicable cure provisions of Article 6.5 shall apply. If a Witness Test is not performed by the EDC or an entity approved by the EDC, the Interconnection Customer must still satisfy the interconnection test specifications and requirements set forth in IEEE Standard 1547 Section 5. The Interconnection Customer shall, if requested by the EDC, provide a copy of all documentation in its possession regarding testing conducted pursuant to IEEE Standard 1547.1. 2.1.2 To the extent that the Interconnection Customer decides to conduct interim testing of the Small Generator Facility prior to the Witness Test, it may request that the EDC observe these tests and that these tests be deleted from the final Witness Test. The EDC may, at its own expense, send qualified personnel to the Small Generator Facility to observe such interim testing. Nothing in this Section Article 2.1.2 shall require the EDC to observe such interim testing or preclude the EDC from performing these tests at the final Witness Test. Regardless of whether the EDC observes the interim testing, the Interconnection Customer shall obtain permission in advance of each occurrence of operating the Small Generator Facility in parallel with the EDC’s system. 2.1.3 Upon successful completion of the Witness Test, the EDC shall affix an authorized signature to the Certificate of Completion and return it to the Interconnection Customer approving the interconnection and authorizing Parallel Operation. Such authorization shall not be unreasonably withheld, conditioned, or delayed.

Appears in 1 contract

Samples: Interconnection Agreement

Equipment Testing and Inspection. The Interconnection Customer shall test and inspect its Small Generator Facility including the Interconnection Equipment prior to interconnection in accordance with IEEE Standard 1547 1547, IEEE Standard 1547.1, and IEEE Standard1547.1the technical and procedural requirements in the District of Columbia Small Generator Interconnection Rule. The Interconnection Customer shall not operate its Small Generator Facility in Parallel with the EDC’s 's Electric Distribution System without prior written authorization by the EDC as provided for in Articles 2.1.1 – 2.1.4- 2.1.3. 2.1.1 The EDC shall have the option of performing a Witness Test after construction of the small generator facility is completed. The Interconnection Customer shall provide the EDC at least 20 days notice of the planned Commissioning Test for the small generator facility. If the EDC elects to perform a Witness Test, it shall contact the Interconnection Customer to schedule the Witness Test at a mutually agreeable time within 5 10 business days of the scheduled commissioning test. If the EDC does not perform the Witness Test within 5 10 business days of the commissioning test, the Witness Test is deemed waived unless the parties mutually agree to extend the date for scheduling the Witness Test. If the Witness Test is not acceptable to the EDC, the Interconnection Customer will be granted a period of 30 calendar days to address and resolve any deficiencies. The time period for addressing and resolving any deficiencies may be extended upon the mutual agreement of the EDC and the Interconnection Customer. If the Interconnection Customer fails to address and resolve the deficiencies to the satisfaction of the EDC, the applicable cure termination provisions of 6.5 Article 3.3.7 shall apply. If a Witness Test is not performed by the EDC or an entity approved by the EDC, the Interconnection Customer must still satisfy the interconnection test specifications and requirements set forth in IEEE Standard 1547 Section 5. The Interconnection Customer shall, if requested by the EDC, provide a copy of all documentation in its possession regarding testing conducted pursuant to IEEE Standard 1547.1. 2.1.2 To the extent that the Interconnection Customer decides to conduct interim testing of the Small Generator Facility prior to the Witness Test, it may request that the EDC observe these tests and that these tests be deleted from the final Witness Test. The EDC may, at its own expense, send qualified personnel to the Small Generator Facility to observe such interim testing. Nothing in this Section 2.1.2 shall require the EDC to observe such interim testing or preclude the EDC from performing these tests at the final Witness Test. Regardless of whether the EDC observes the interim testing, the Interconnection Customer shall obtain permission in advance of each occurrence of operating the Small Generator Facility in parallel with the EDC’s 's system. 2.1.3 Upon successful completion of the Witness Test, the EDC shall affix an authorized signature to the Certificate of Completion and return it to the Interconnection Customer approving the interconnection and authorizing Parallel Operation. Such authorization shall not be unreasonably withheld, conditioned, or delayed.

Appears in 1 contract

Samples: Community Renewable Energy Facility Application and Agreement