Erection and High Strength Bolting Sample Clauses

Erection and High Strength Bolting. (a) Primary Inspector or Inspection Supervisor; (i) PE – Civil/Structural and ICC Certification as a Structural Steel Bolting Inspector and 1 year relevant experience; (b) Supplemental Inspector (under the direct supervision of Inspection Supervisor); (i) Technician with ICC certification as a Structural Steel and Bolting Inspector and 3 years’ relevant experience
AutoNDA by SimpleDocs

Related to Erection and High Strength Bolting

  • Staffing There shall be a clinician employed by the outside contractor for EAP Services who will be on-site a minimum of 20 hours a week. The clinician shall report directly to the outside contractor, Peer Assistance Oversight Committee and the MIF liaison. There shall be three full-time Peer Assistants reporting to the outside contractor.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Irrigation An irrigation reduced pressure zone (hereinafter referred to as “RPZ”) is required for any irrigation systems and must be installed by the Developer and/or eventual lot owner and tested in accordance with the Minnesota Department of Health Guidelines for Designing Backflow Prevention Assembly Installations (hereinafter referred to as “Guidelines”). The initial test results and certification shall be submitted to the City of Maple Grove Public Works Department. Subsequently, the RPZ must be tested, per the Guidelines, at least annually by a certified tester with the results reported to the City of Maple Grove Building Department and the RPZ must be rebuilt as needed in accordance with the Guidelines. Test/rebuilt reports shall be mailed or faxed to the City of Maple Grove Building Department at (000) 000-0000. The irrigation system shall be designed, and the Plans shall be modified accordingly, prior to the issuance of any permits for the development of the Property, to accommodate a 1-inch water meter and a maximum flow of 50 gallons per minute.

  • Infrastructure Infrastructure serves as the foundation and building blocks of an integrated IT solution. It is the hardware which supports Application Services (C.3.2) and IT Management Services (C.3.3); the software and services which enable that hardware to function; and the hardware, software, and services which allow for secure communication and interoperability between all business and application service components. Infrastructure services facilitate the development and maintenance of critical IT infrastructures required to support Federal government business operations. This section includes the technical framework components that make up integrated IT solutions. One or any combination of these components may be used to deliver IT solutions intended to perform a wide array of functions which allow agencies to deliver services to their customers (or users), whether internal or external, in an efficient and effective manner. Infrastructure includes hardware, software, licensing, technical support, and warranty services from third party sources, as well as technological refreshment and enhancements for that hardware and software. This section is aligned with the FEA/DoDEA Technical Reference Model (TRM) which describes these components using a vocabulary that is common throughout the entire Federal government. A detailed review of the TRM is provided in Section J, Attachment 5. Infrastructure includes complete life cycle support for all hardware, software, and services represented above, including planning, analysis, research and development, design, development, integration and testing, implementation, operations and maintenance, information assurance, and final disposition of these components. The services also include administration and help desk functions necessary to support the IT infrastructure (e.g., desktop support, network administration). Infrastructure components of an integrated IT solution can be categorized as follows:

  • Procurement of the Site (i) The Authority Representative, the Contractor and Authority’s Engineer shall, within 10 (ten) days of the date of this Agreement, inspect the Site and prepare a detailed memorandum containing an inventory of the Site including the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site (hereinafter referred to as the “Handover Memorandum”). Subject to the provisions of Clause 8.2 (iii), the Handover Memorandum shall have appended thereto an appendix (the “Appendix”) specifying in reasonable detail those parts of the Site to which vacant access and Right of Way has not been given to the Contractor along with details of hindrances in the Construction Zone. For sake of clarity the Handover Memorandum shall clearly specify the parts of Site where work can be executed. Signing of the Handover Memorandum, in three counterparts (each of which shall constitute an original), by the authorized representatives of the Authority, Contractor and Authority’s Engineer shall be deemed to constitute a valid evidence of giving the Right of Way to the Contractor for discharging its obligations under and in accordance with the provisions of this Agreement and for no other purpose whatsoever. (ii) Whenever the Authority is ready to hand over any part or parts of the Site included in the Appendix, it shall inform the Contractor, by notice, of the proposed date and time such of hand over. The Authority Representative and the Contractor shall, on the date so notified, inspect the specified parts of the Site, and prepare a memorandum containing an inventory of the vacant and unencumbered land, buildings, structures, road works, trees and any other immovable property on or attached to the Site so handed over. The signing of the memorandum, in three (3) counterparts (each of which shall constitute an original), by the authorised representatives of the Parties shall be deemed to constitute a valid evidence of giving the relevant Right of Way to the Contractor. If the contractor fails to join for site inspection or disputes the parts of the site available for work, the Authority’s Engineer shall decide the parts of the site where work can be executed and notify to both the parties within 3 days of the proposed date of inspection. The parties agree that such notification of the Authority’s Engineer as mentioned hereinabove shall be final and binding on the parties. (iii) The Authority shall provide the Right of Way to the Contractor in respect of all land included in the Appendix by the date specified in Schedule-A for those parts of the Site referred to therein, and in the event of delay for any reason other than Force Majeure or breach of this Agreement by the Contractor, it shall pay to the Contractor, Damages in a sum calculated in accordance with Clause 8.3. The Contractor agrees that it shall not be entitled to claim any other damages on account of any such delay by the Authority. (iv) Notwithstanding anything to the contrary contained in this Clause 8.2, the Authority shall specify the parts of the Site, if any, for which Right of Way shall be provided to the Contractor on the dates specified in Schedule-A. Such parts shall also be included in the Appendix prepared in pursuance of Clause 8.2 (i). (v) The Authority further acknowledges and agrees that prior to the Appointed Date, it shall have procured issuance of the statutory notification under Applicable Laws for vesting of all the land comprising the Project in the Authority and has taken possession of area for Construction Zone for at least 90% (ninety per cent) of the total length of the Project Highway. The Parties also acknowledge and agree that the conditions specified in this Clause 8.2 (iii) shall not be modified or waived by either Party. (vi) For the avoidance of doubt, the Parties expressly agree that the Appendix shall in no event contain sections of the Project Highway the cumulative length of which exceeds 10% (ten percent) of the total length of the Project Highway. (vii) Pursuant to signing of Handover Memorandum under clause 8.2 (i), Contractor shall submit to the Authority’s Engineer, a monthly land possession report till expiry of 180 (one hundred and eighty) days from Appointed Date, in respect of those parts of the site to which vacant access and right of way was not given to the contractor and included in Appendix to the memorandum signed under clause 8.2 (i), duly specifying the part of the site, if any, for which the right of way is yet to be handed over.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Durable Medical Equipment (DME), Medical Supplies, Prosthetic Devices, Enteral Formula or Food, and Hair Prosthesis (Wigs) This plan covers durable medical equipment and supplies, prosthetic devices and enteral formula or food as described in this section. DME is equipment which: • can withstand repeated use; • is primarily and customarily used to serve a medical purpose; • is not useful to a person in the absence of an illness or injury; and • is for use in the home. DME includes supplies necessary for the effective use of the equipment. This plan covers the following DME: • wheelchairs, hospital beds, and other DME items used only for medical treatment; and • replacement of purchased equipment which is needed due to a change in your medical condition or if the device is not functional, no longer under warranty, or cannot be repaired. DME may be classified as a rental item or a purchased item. In most cases, this plan only pays for a rental DME up to our allowance for a purchased DME. Repairs and supplies for rental DME are included in the rental allowance. Medical supplies are consumable supplies that are disposable and not intended for re- use. Medical supplies require an order by a physician and must be essential for the care or treatment of an illness, injury, or congenital defect. Covered medical supplies include: • essential accessories such as hoses, tubes and mouthpieces for use with medically necessary DME (these accessories are included as part of the rental allowance for rented DME); • catheters, colostomy and ileostomy supplies, irrigation trays and surgical dressings; and • respiratory therapy equipment. This plan covers diabetic equipment and supplies for the treatment of diabetes in accordance with R.I. General Law §27-20-30. Covered diabetic equipment and supplies include: • therapeutic or molded shoes and inserts for custom-molded shoes for the prevention of amputation; • blood glucose monitors including those with special features for the legally blind, external insulin infusion pumps and accessories, insulin infusion devices and injection aids; and • lancets and test strips for glucose monitors including those with special features for the legally blind, and infusion sets for external insulin pumps. The amount you pay differs based on whether the equipment and supplies are bought from a durable medical equipment provider or from a pharmacy. See the Summary of Pharmacy Benefits and the Summary of Medical Benefits for details. Coverage for some diabetic equipment and supplies may only be available from either a DME provider or from a pharmacy. Visit our website to determine if this is applicable or call our Customer Service Department. Prosthetic devices replace or substitute all or part of an internal body part, including contiguous tissue, or replace all or part of the function of a permanently inoperative or malfunctioning body part and alleviate functional loss or impairment due to an illness, injury or congenital defect. Prosthetic devices do not include dental prosthetics. This plan covers the following prosthetic devices as required under R.I. General Law § 27-20-52: • prosthetic appliances such as artificial limbs, breasts, larynxes and eyes; • replacement or adjustment of prosthetic appliances if there is a change in your medical condition or if the device is not functional, no longer under warranty and cannot be repaired; • devices, accessories, batteries and supplies necessary for prosthetic devices; • orthopedic braces except corrective shoes and orthotic devices used in connection with footwear; and • breast prosthesis following a mastectomy, in accordance with the Women’s Health and Cancer Rights Act of 1998 and R.I. General Law 27-20-29. The prosthetic device must be ordered or provided by a physician, or by a provider under the direction of a physician. When you are prescribed a prosthetic device as an inpatient and it is billed by a provider other than the hospital where you are an inpatient, the outpatient benefit limit will apply. Enteral formula or food is nutrition that is absorbed through the intestinal tract, whether delivered through a feeding tube or taken orally. Enteral nutrition is covered when it is the sole source of nutrition and prescribed by the physician for home use. In accordance with R.I. General Law §27-20-56, this plan covers enteral formula taken orally for the treatment of: • malabsorption caused by Crohn’s Disease; • ulcerative colitis; • gastroesophageal reflux; • chronic intestinal pseudo obstruction; and • inherited diseases of amino acids and organic acids. Food products modified to be low protein are covered for the treatment of inherited diseases of amino acids and organic acids. Preauthorization may be required. The amount that you pay may differ depending on whether the nutrition is delivered through a feeding tube or taken orally. When enteral formula is delivered through a feeding tube, associated supplies are also covered. This plan covers hair prosthetics (wigs) worn for hair loss suffered as a result of cancer treatment in accordance with R.I. General Law § 27-20-54 and subject to the benefit limit and copayment listed in the Summary of Medical Benefits. This plan will reimburse the lesser of the provider’s charge or the benefit limit shown in the Summary of Medical Benefits. If the provider’s charge is more than the benefit limit, you are responsible for paying any difference. This plan covers Early Intervention Services in accordance with R.I. General Law §27- 20-50. Early Intervention Services are educational, developmental, health, and social services provided to children from birth to thirty-six (36) months. The child must be certified by the Rhode Island Department of Human Services (DHS) to enroll in an approved Early Intervention Services program. Services must be provided by a licensed Early Intervention provider and rendered to a Rhode Island resident. Members not living in Rhode Island may seek services from the state in which they reside; however, those services are not covered under this plan. Early Intervention Services as defined by DHS include but are not limited to the following: • speech and language therapy; • physical and occupational therapy; • evaluation; • case management; • nutrition; • service plan development and review; • nursing services; and • assistive technology services and devices.

  • Foundations nor shall the Contractor be responsible for correction of leaks resulting from said failure.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Points of Interconnection and Trunk Types 2.1 Point(s) of Interconnection. 2.1.1 Each Party, at its own expense, shall provide transport facilities to the technically feasible Point(s) of Interconnection on Verizon’s network in a LATA selected by PNG.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!