ESD and WOL Plan. The plan prepared by the Contractor and finalised under clause 9.2, which must set out in adequate detail all procedures the Contractor will implement to manage the Contractor's Activities and the Works from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must address, at a minimum: all matters in the Smart Infrastructure Handbook and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment); all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the ESD and WOL Manager and the Contractor's key people under clause 3.6(a)) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding ESD and WOL during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan under clause 9.2; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.2; the procedure for ensuring subcontractor compliance with the ESD and WOL Plan; the procedure for regularly auditing or other monitoring of Contractor and subcontractor compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by the: Contract; or Contract Administrator.

Appears in 3 contracts

Samples: Formal Agreement, Formal Agreement, Formal Agreement

AutoNDA by SimpleDocs

ESD and WOL Plan. The plan prepared by the Contractor Subcontractor and finalised under clause 9.28.7, which must set out in adequate detail all procedures the Contractor Subcontractor will implement to manage the ContractorSubcontractor's Activities and the Subcontract Works from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must not be inconsistent with the Contractor’s ESD and WOL Plan and must address, at a minimum: all matters in the Smart Infrastructure Handbook and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the ESD and WOL Manager and the ContractorSubcontractor's key people under clause 3.6(a)2.3) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding ESD and WOL during the ContractorSubcontractor's Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan under clause 9.28.7; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.28.7; the procedure for ensuring subcontractor subsubcontractor compliance with the ESD and WOL Plan; the procedure for regularly auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the ContractorSubcontractor's Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorContractor’s Representative. ESD Principles Means: efficient and effective use of natural resources in a way that maintains the ecological processes on which life depends; increased energy and water conservation and efficiency; sustainable development and use of renewable and alternative energy and water resources; reduction or elimination of toxic and harmful substances in facilities and their surrounding environments; improvements to interior and exterior environments leading to increased productivity and better health; efficiency in resource and materials utilisation, especially water resources; selection of materials and products based on their life-cycle environmental impacts; increased use of materials and products with recycled content; recycling of construction waste and building materials after demolition; reduction in harmful waste products produced during construction; use, operation and maintenance practices that reduce or minimise harmful effects on people and the natural environment; maintaining the cultural, economic, physical and social wellbeing of people and communities; the principles described in the Smart Infrastructure Handbook and the Sustainable Procurement Guide; and the additional principles specified in the Subcontract Particulars.

Appears in 3 contracts

Samples: Formal Agreement, Formal Agreement, Formal Agreement

ESD and WOL Plan. The plan prepared by the Contractor Consultant and finalised under clause 9.27.4, which must set out in adequate detail all procedures the Contractor Consultant will implement to manage the Contractor's Activities and the Works Services from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must not be inconsistent with the Contractor’s ESD and WOL Plan and must address, at a minimum: all matters in the Smart Infrastructure Handbook and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor Consultant personnel (including the ESD and WOL Manager and the Contractor's Consultant’s key people under clause 3.6(a4.4(a)(i)) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding ESD and WOL during the Contractor's Activities and the WorksServices; the training and awareness programmes provided to Contractor and subcontractor Consultant personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan to meet the requirements of the Subcontract under clause 9.27.4; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.27.4; the procedure for ensuring subcontractor compliance with the ESD and WOL Plan; the procedure for regularly regular auditing or other monitoring of Contractor and subcontractor Consultant compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Activities Services and the MCC Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorContractor’s Representative. ESD Principles Means: efficient and effective use of natural resources in a way that maintains the ecological processes on which life depends; increased energy and water conservation and efficiency; sustainable development and use of renewable and alternative energy and water resources; reduction or elimination of toxic and harmful substances in facilities and their surrounding environments; improvements to interior and exterior environments leading to increased productivity and better health; efficiency in resource and materials utilisation, especially water resources; selection of materials and products based on their life-cycle environmental impacts; increased use of materials and products with recycled content; recycling of construction waste and building materials after demolition; reduction in harmful waste products produced during construction; use, operation and maintenance practices that reduce or minimise harmful effects on people and the natural environment; maintaining the cultural, economic, physical and social wellbeing of people and communities; the principles described in the Smart Infrastructure Handbook; and the additional principles specified in the Subcontract Particulars.

Appears in 2 contracts

Samples: defence.gov.au, defence.gov.au

ESD and WOL Plan. The plan prepared by the Contractor Subcontractor and finalised under clause 9.2, which must set out in adequate detail all procedures the Contractor Subcontractor will implement to manage the Contractor's Subcontractor’s Activities and the Subcontract Works from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must not be inconsistent with the Contractor’s ESD and WOL Plan and must address, at a minimum: all matters in the Smart Infrastructure Handbook and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the ESD and WOL Manager and the Contractor's Subcontractor’s key people under clause 3.6(a)) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding ESD and WOL during the Contractor's Subcontractor’s Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan under clause 9.2; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.2; the procedure for ensuring subcontractor subsubcontractor compliance with the ESD and WOL Plan; the procedure for regularly auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Subcontractor’s Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorContractor’s Representative. ESD Principles Means: efficient and effective use of natural resources in a way that maintains the ecological processes on which life depends; increased energy and water conservation and efficiency; sustainable development and use of renewable and alternative energy and water resources; reduction or elimination of toxic and harmful substances in facilities and their surrounding environments; improvements to interior and exterior environments leading to increased productivity and better health; efficiency in resource and materials utilisation, especially water resources; selection of materials and products based on their life-cycle environmental impacts; increased use of materials and products with recycled content; recycling of construction waste and building materials after demolition; reduction in harmful waste products produced during construction; use, operation and maintenance practices that reduce or minimise harmful effects on people and the natural environment; maintaining the cultural, economic, physical and social wellbeing of people and communities; the principles described in the Smart Infrastructure Handbook and the Sustainable Procurement Guide; and the additional principles specified in the Subcontract Particulars.

Appears in 2 contracts

Samples: Formal Agreement, Formal Agreement

ESD and WOL Plan. The plan prepared by the Contractor and finalised under clause 9.28.7, which must set out in adequate detail all procedures the Contractor will implement to manage the Contractor's Activities and the Works from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook Handbook, the ESD and WOL Plan Guide and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan (if any) must address, at a minimum: all matters in the Smart Infrastructure Handbook Handbook; all matters in the ESD and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)WOL Plan Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the ESD and WOL Manager and the Contractor's key people under clause 3.6(a)2.3) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Contract AdministratorPDS Contractor, the Commonwealth and Other Contractors regarding ESD and WOL during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan (if any) under clause 9.28.7; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan (if any) under clause 9.28.7; the procedure for ensuring subcontractor compliance with the ESD and WOL PlanPlan (if any); the procedure for regularly auditing or other monitoring of Contractor and subcontractor compliance with the ESD and WOL PlanPlan (if any), including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by theby: the Contract; or Contract Administratorthe PDS Contractor.

Appears in 2 contracts

Samples: Formal Agreement, Formal Agreement

ESD and WOL Plan. The plan prepared by the Contractor and finalised under clause 9.2, which must set out in adequate detail all procedures the Contractor will implement to manage the Contractor's Activities and the Works from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must address, at a minimum: all matters in the Smart Infrastructure Handbook and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the ESD and WOL Manager and the Contractor's key people under clause 3.6(a)) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding ESD and WOL during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan under clause 9.2; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.2; the procedure for ensuring subcontractor compliance with the ESD and WOL Plan; the procedure for regularly auditing or other monitoring of Contractor and subcontractor compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by the: Contract; or Contract Administrator.

Appears in 2 contracts

Samples: Formal Agreement, Formal Agreement

ESD and WOL Plan. The plan prepared by the Contractor and finalised under clause 9.2, which must set out in adequate detail all procedures the Contractor will implement to manage the Contractor's Activities and the Works from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook Handbook, the ESD and WOL Plan Guide and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must address, at a minimum: all matters in the Smart Infrastructure Handbook Handbook; all matters in the ESD and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)WOL Plan Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the ESD and WOL Manager and the Contractor's key people under clause 3.6(a)) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding ESD and WOL during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan under clause 9.2; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.2; the procedure for ensuring subcontractor compliance with the ESD and WOL Plan; the procedure for regularly auditing or other monitoring of Contractor and subcontractor compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by theby: the Contract; or the Contract Administrator.

Appears in 1 contract

Samples: Formal Agreement

ESD and WOL Plan. The plan prepared by the Contractor Consultant and finalised under clause 9.27.4, which must set out in adequate detail all procedures the Contractor Consultant will implement to manage the Contractor's Activities and the Works Services from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must not be inconsistent with the Contractor’s ESD and WOL Plan and must address, at a minimum: all matters in the Smart Infrastructure Handbook and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor Consultant personnel (including the ESD and WOL Manager and the Contractor's Consultant’s key people under clause 3.6(a4.4(a)(i)) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding ESD and WOL during the Contractor's Activities and the WorksServices; the training and awareness programmes provided to Contractor and subcontractor Consultant personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan to meet the requirements of the Subcontract under clause 9.27.4; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.27.4; the procedure for ensuring subcontractor compliance with the ESD and WOL Plan; the procedure for regularly regular auditing or other monitoring of Contractor and subcontractor Consultant compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Activities Services and the MCC Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by the: ContractSubcontract; or Contract AdministratorContractor’s Representative. ESD Principles Means: efficient and effective use of natural resources in a way that maintains the ecological processes on which life depends; increased energy and water conservation and efficiency; sustainable development and use of renewable and alternative energy and water resources; reduction or elimination of toxic and harmful substances in facilities and their surrounding environments; improvements to interior and exterior environments leading to increased productivity and better health; efficiency in resource and materials utilisation, especially water resources; selection of materials and products based on their life-cycle environmental impacts; increased use of materials and products with recycled content; recycling of construction waste and building materials after demolition; reduction in harmful waste products produced during construction; use, operation and maintenance practices that reduce or minimise harmful effects on people and the natural environment; maintaining the cultural, economic, physical and social wellbeing of people and communities; the principles described in the Smart Infrastructure Handbook and the Sustainable Procurement Guide; and the additional principles specified in the Subcontract Particulars.

Appears in 1 contract

Samples: defence.gov.au

AutoNDA by SimpleDocs

ESD and WOL Plan. The plan prepared by the Contractor Consultant and finalised under clause 9.27.4, which must set out in adequate detail all procedures the Contractor Consultant will implement to manage the Contractor's Activities and the Works Services from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must address, at a minimum: all matters in the Smart Infrastructure Handbook and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor Consultant and subcontractor subconsultant personnel (including the ESD and WOL Manager and the ContractorConsultant's key people under clause 3.6(a4.5(a)(i)) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding ESD and WOL during the Contractor's Activities and the WorksServices; the training and awareness programmes provided to Contractor Consultant and subcontractor subconsultant personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan to meet the requirements of the Contract under clause 9.27.4; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.27.4; the procedure for ensuring subcontractor subconsultant compliance with the ESD and WOL Plan; the procedure for regularly regular auditing or other monitoring of Contractor Consultant and subcontractor subconsultant compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Activities Services and the Works; the additional matters specified in the Contract Particulars; and any other matters required by the: Contract; or Contract Administrator.

Appears in 1 contract

Samples: Design Services Contract

ESD and WOL Plan. The plan prepared by the Contractor and finalised under clause 9.28.7, which must set out in adequate detail all procedures the Contractor will implement to manage the Contractor's Activities and the Works from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must address, at a minimum: all matters in the Smart Infrastructure Handbook and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment); all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the ESD and WOL Manager and the Contractor's key people under clause 3.6(a)2.3) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding ESD and WOL during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan under clause 9.28.7; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.28.7; the procedure for ensuring subcontractor compliance with the ESD and WOL Plan; the procedure for regularly auditing or other monitoring of Contractor and subcontractor compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by the: Contract; or Contract Administrator.

Appears in 1 contract

Samples: Formal Agreement

ESD and WOL Plan. The plan prepared by the Contractor Subcontractor and finalised under clause 9.28.7, which must set out in adequate detail all procedures the Contractor Subcontractor will implement to manage the ContractorSubcontractor's Activities and the Subcontract Works from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook Manual, the ESD and WOL Plan Guide and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must not be inconsistent with the Contractor’s ESD and WOL Plan and must address, at a minimum: all matters in the Smart Infrastructure Handbook Manual; all matters in the ESD and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)WOL Plan Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor Subcontractor and subcontractor subsubcontractor personnel (including the ESD and WOL Manager and the ContractorSubcontractor's key people under clause 3.6(a)2.3) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Commonwealth, the MCC Contract Administrator, the Commonwealth Contractor, the Contractor’s Representative and Other Contractors regarding ESD and WOL during the ContractorSubcontractor's Activities and the Subcontract Works; the training and awareness programmes provided to Contractor Subcontractor and subcontractor subsubcontractor personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan under clause 9.28.7; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.28.7; the procedure for ensuring subcontractor subsubcontractor compliance with the ESD and WOL Plan; the procedure for regularly auditing or other monitoring of Contractor Subcontractor and subcontractor subsubcontractor compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the ContractorSubcontractor's Activities and the Subcontract Works; the additional matters specified in the Contract Subcontract Particulars; and any other matters required by theby: Contractthe Subcontract; or Contract Administratorthe Contractor’s Representative. ESD and WOL Plan Guide The ESD and WOL Plan Guide available on DEQMS (or any alternative location notified by the Commonwealth), as amended from time to time by the Commonwealth. ESD Principles Means: efficient and effective use of natural resources in a way that maintains the ecological processes on which life depends; increased energy and water conservation and efficiency; sustainable development and use of renewable and alternative energy and water resources; reduction or elimination of toxic and harmful substances in facilities and their surrounding environments; improvements to interior and exterior environments leading to increased productivity and better health; efficiency in resource and materials utilisation, especially water resources; selection of materials and products based on their life-cycle environmental impacts; increased use of materials and products with recycled content; recycling of construction waste and building materials after demolition; reduction in harmful waste products produced during construction; use, operation and maintenance practices that reduce or minimise harmful effects on people and the natural environment; maintaining the cultural, economic, physical and social wellbeing of people and communities; the principles described in the Smart Infrastructure Manual; and the additional principles specified in the Subcontract Particulars. Estate Data Tool A spreadsheet based tool for recording Defence Estate Data for each element on the Defence Estate in accordance with the ERIM, available on DEQMS. Estate ID The unique identifier for each element on the Defence Estate used in the XXXX. Estate Information The Project Documents described in Annexure 1. Estate Maintenance Forecast Tool A spreadsheet based tool for recording forecast maintenance for each element on the Defence Estate, available on DEQMS. Estate Record Shell An initial, incomplete record used in the XXXX for recording Defence Estate Data for each element on the Defence Estate, comprising minimum populated classifications, attributes and formats. Exclusion Sanction Has the same meaning as in subsection 3(1) of the Building Code 2016.

Appears in 1 contract

Samples: Formal Agreement

ESD and WOL Plan. The plan prepared by the Contractor and finalised under clause 9.28.7, which must set out in adequate detail all procedures the Contractor will implement to manage the Contractor's Activities and the Works from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook Handbook, the ESD and WOL Plan Guide and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan (if any) must address, at a minimum: all matters in the Smart Infrastructure Handbook Handbook; all matters in the ESD and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)WOL Plan Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the ESD and WOL Manager and the Contractor's key people under clause 3.6(a)2.3) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Contract AdministratorPDS Contractor, the Commonwealth and Other Contractors regarding ESD and WOL during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan (if any) under clause 9.28.7; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan (if any) under clause 9.28.7; the procedure for ensuring subcontractor compliance with the ESD and WOL PlanPlan (if any); the procedure for regularly auditing or other monitoring of Contractor and subcontractor compliance with the ESD and WOL PlanPlan (if any), including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by theby: the Contract; or Contract Administratorthe PDS Contractor. ESD and WOL Plan Guide The ESD and WOL Plan Guide available on DEQMS (or any alternative location notified by the Commonwealth), as amended from time to time by the Commonwealth.

Appears in 1 contract

Samples: Formal Agreement

ESD and WOL Plan. The plan prepared by the Contractor and finalised under clause 9.28.7, which must set out in adequate detail all procedures the Contractor will implement to manage the Contractor's Activities and the Works from an ESD and WOL perspective to: ensure compliance with the Smart Infrastructure Handbook and Statutory Requirements; and xxxxxxxx the achievement of the ESD Principles and the WOL Objectives. The ESD and WOL Plan must address, at a minimum: all matters in the Smart Infrastructure Handbook and the Sustainable Procurement Guide (published by the Department of Agriculture, Water and the Environment)Guide; all Statutory Requirements; all ESD Principles and WOL Objectives; the roles and responsibilities of all Contractor and subcontractor personnel (including the ESD and WOL Manager and the Contractor's key people under clause 3.6(a)2.3) regarding ESD and WOL; the procedure for consultation, cooperation and coordination of activities with the Contract Administrator, the Commonwealth and Other Contractors regarding ESD and WOL during the Contractor's Activities and the Works; the training and awareness programmes provided to Contractor and subcontractor personnel regarding ESD and WOL; the procedure for preparing (including tailoring) and finalising the ESD and WOL Plan under clause 9.28.7; the procedure for regularly reviewing, updating and amending the ESD and WOL Plan under clause 9.28.7; the procedure for ensuring subcontractor compliance with the ESD and WOL Plan; the procedure for regularly auditing or other monitoring of Contractor and subcontractor compliance with the ESD and WOL Plan, including the procedures for recording, reporting, responding to and finalising: matters arising out of or in connection with such audits or other monitoring; and complaints regarding ESD and WOL during the Contractor's Activities and the Works; the additional matters specified in the Contract Particulars; and any other matters required by the: Contract; or Contract Administrator.

Appears in 1 contract

Samples: Medium Works Contract