Establish project testing requirements Sample Clauses

Establish project testing requirements. The Consultant shall determine the type and frequency of geotechnical testing required for the project. The testing shall consider such items as pavement type, design methodology, type of wheel loading, and weight of design aircraft. Determine soil boring locations and frequency of testing. Develop a project sketch showing location and coordinates of borings. Determine soil sampling locations and types of soils testing required.
AutoNDA by SimpleDocs
Establish project testing requirements. The CONSULTANT will determine the type and frequency of geotechnical testing required for the project. The testing will consider such items as pavement type, design methodology, type of wheel loading, and weight of design traffic. The CONSULTANT will use this information to perform the following tasks: The estimated boring locations are as follows for basis of preparing the proposal:

Related to Establish project testing requirements

  • Testing Requirements 12.1. Workplaces -

  • Operating Requirements Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards.

  • Developer Operating Requirements (a) Developer must comply with all applicable NYISO tariffs and procedures, as amended from time to time.

  • General Program Requirements Subrecipient shall adhere, but not be limited to, the following requirements for all programs:

  • Staffing Requirements Licensee will be in full compliance with the main studio staff requirements as specified by the FCC.

  • Trunk Forecasting Requirements 14.2.1 Initial Trunk Forecast Reouirement_s. At least ninety (90) days before initiating interconnection in a LATA, HTCC shall provide Verizon a two (2)-year traffic forecast that complies with the Verizon Interconnection Trunking Forecast Guide, as revised from time to time. This initial traffic forecast will provide the amount of traffic to be delivered to and from Verizon over each of the Interconnection Trunk groups in the LATA over the next eight (8) quarters.

  • Program Requirements A. The parties shall comply with the Disadvantaged Business Enterprise Program requirements established in 49 CFR Part 26.

  • Training Requirements Grantee shall:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!