Estimate of the Cost of Construction Sample Clauses

Estimate of the Cost of Construction. Contemporaneously with the submission of the 90% Design for Construction documents, the CONSULTANT shall submit to the CITY in writing its updated Estimate of the Cost of Construction. The CONSULTANT shall submit the final Estimate of the Cost of Construction with the 100% completed Design for construction. Once submitted, said final estimate shall not be increased or decreased by the CONSULTANT unless the Design for Construction is changed upon authorization by the CITY. In such event said final estimate shall be reasonably adjusted to reflect any increase or decrease in cost resulting from the change in Design for Construction. Prior to authorizing the CONSULTANT to proceed with preparation of the Design for Construction, the CITY may establish and communicate to the CONSULTANT a maximum sum for the Cost of Construction of the Project (the "Maximum Cost Limit"). If the CITY has not advertised for bids within ninety (90) days after the CONSULTANT submits the Design for Construction to the CITY, the CONSULTANT shall adjust the Estimate of the Cost of Construction utilizing changes in the Engineering News Record Construction Cost Index between the date of submission of the Design for Construction to the CITY and the date on which bids are sought. In the event the final estimate of the Cost of Construction as provided in this Paragraph exceeds the Maximum Cost Limit, or in the event the lowest bona fide bid from a qualified contractor exceeds the Maximum Cost Limit, the CITY may require the CONSULTANT, without additional cost to the CITY, to consult with the CITY and to revise and modify the Design for Construction and the Contract Documents as required to achieve compliance with the Maximum Cost Limit. Absent clear and convincing negligence on the part of the CONSULTANT in making its final Estimate of the Cost of Construction or in designing the Project without regard to the Maximum Cost Limit, providing such modifications and revisions shall be the limit of the CONSULTANT's responsibility arising from the establishment of the Maximum Cost Limit, and having done so, the CONSULTANT shall be entitled to compensation for all other services performed, in accordance with the Project Agreement;
AutoNDA by SimpleDocs

Related to Estimate of the Cost of Construction

  • Cost of Construction 1. During the Schematic Design, Design Development, and Construction Document Phases, the ARCHITECT’s estimates of Construction Cost shall be reconciled against the Budget approved by the DISTRICT pursuant to Article IV, Section 2.

  • Commencement of Construction Construction of the Project will start within thirty (30) days after notification to the Developer by the Owner, or as soon thereafter as weather and ground conditions permit.

  • DAF Construction The DAF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Developer and Connecting Transmission Owner agree on another mutually acceptable deadline, the Developer shall deliver to the Connecting Transmission Owner and NYISO “as- built” drawings, information and documents for the DAF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the DAF, plan and elevation drawings showing the layout of the DAF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Developer’s step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the DAF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Developer shall provide to, and coordinate with, Connecting Transmission Owner and NYISO with respect to proposed specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • ICIF Construction The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.

  • During Construction Upon request of the Owner the Contractor shall submit written proposals for unit prices to be applied in the event Change Order Work is authorized by the Owner to be performed under Case (b).

  • New Construction If this contract is for a Property that is newly constructed and the new construction option is selected, coverage begins on day one (1) of month thirteen

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure: