EVACUATION SYSTEM 4 Sample Clauses

EVACUATION SYSTEM 4. 1.1 FIRE RESISTANT CABLING Allow for adequate cabling for the wiring of emergency evacuation system to specification. 1.0 mm2 in buildings at rack and 2.5 mm2 for building external to evacuation rack m3 10
AutoNDA by SimpleDocs

Related to EVACUATION SYSTEM 4

  • Irrigation Systems The Project Area either has no irrigation system or a low-volume drip irrigation system. If a watering system is used, it is a drip irrigation system equipped with a filter, pressure regulator and emitters rated at twenty (20) gallons per hour (gph) or less. The system is maintained free of leaks and malfunctions. No spray irrigation is applied to the Project Area, including spray from irrigation systems adjacent to the Project Area.

  • Distribution System The Transmission Provider's facilities and equipment used to transmit electricity to ultimate usage points such as homes and industries directly from nearby generators or from interchanges with higher voltage transmission networks which transport bulk power over longer distances. The voltage levels at which Distribution Systems operate differ among areas. Distribution Upgrades – The additions, modifications, and upgrades to the Transmission Provider's Distribution System at or beyond the Point of Interconnection to facilitate interconnection of the Small Generating Facility and render the transmission service necessary to effect the Interconnection Customer's wholesale sale of electricity in interstate commerce. Distribution Upgrades do not include Interconnection Facilities.

  • Management Information System The M&E Plan will describe the information system that will be used to collect data, store, process and deliver information to relevant stakeholders in such a way that the Program information collected and verified pursuant to the M&E Plan is at all times accessible and useful to those who wish to use it. The system development will take into consideration the requirement and data needs of the components of the Program, and will be aligned with existing MCC systems, other service providers, and ministries.

  • Transmission System Operation The NTO shall be responsible for ensuring that all actions related to the operation, maintenance and modification of its facilities that are designated as NTO Transmission Facilities Under ISO Operational Control and NTO Transmission Facilities Requiring ISO Notification are performed in accordance with the terms of this Agreement, all Reliability Rules and all other applicable reliability rules, standards and criteria, all operating instructions, ISO Tariffs, and ISO Procedures.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Information Systems The Official Agency in conjunction with the Authority will meet the relevant requirements of Articles 131 to 136 of Regulation (EU) 2017/625 and Implementing Regulation (EU) 2019/1715 as appropriate to the Official Agency. The Official Agency shall record appropriate data in the Official Agency Premises Inspection database (OAPI), which will be further developed over the life of the contract. Data should be entered into the database on an ongoing basis but shall be entered within one month of the activity taking place, unless otherwise agreed with the Authority.

  • Communication Systems The Parties agree to share the use of communication systems, radios and radio frequencies for the implementation of this Agreement. Sharing of frequencies must be approved only by authorized personnel for each Party and documented in the AOP.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Transmission System The facilities controlled or operated by the Transmission Provider within the PJM Region that are used to provide transmission service under Part II and Part III of the Tariff.

  • Management Information Systems A. The CONTRACTOR shall maintain a process that collects, analyzes, integrates, and reports data. (42 C.F.R. § 438.242(a); Cal. Code Regs., tit. 9, § 1810.376.) This process shall provide information on areas including, but not limited to, utilization, claims, grievances, and appeals. (42 C.F.R. § 438.242(a).)

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!