Existing Developer’s Attachment Facilities. The Developer has constructed a 30 MW (nameplate at 0.8 power factor) hydro facility located at the Stewarts Bridge Reservoir, near the Town of Hadley, in Saratoga County, New York (“Existing Facility”). The Existing Facility has a maximum summer output of 37.5 MW at 95ºF at unity power factor, and interconnects to the Connecting Transmission Owner’s 115 xX Xxxxx-Xxxx Line #9 (“Line #9”) as further defined in Appendix C. As depicted in Figure 1 to this Appendix A,the existing Developer Attachment Facilities include: ● One (1) three-phase, two winding, 115 kV (wye-grounded) – 13.2 kV (Delta), 37.5 MVA transformer, with a 11.8% impedance and 6 sets of 600:5 MR bushing CTs (two per primary phase); and ● One (1) 115 kV, 1200 A, 550 kV BIL, 20 kA, S&C Model 2010 Circuit Switcher (988).
Appears in 3 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Large Generator Interconnection Agreement
Existing Developer’s Attachment Facilities. The Developer has constructed a 30 MW (nameplate at 0.8 power factor) hydro facility located at the Stewarts Bridge Reservoir, near the Town of HadleyXxxxxx, in Saratoga County, New York (“Existing Facility”). The Existing Facility has a maximum summer output of 37.5 MW at 95ºF at unity power factor, and interconnects to the Connecting Transmission Owner’s 115 xX Xxxxx-Xxxx Line #9 (“Line #9”) as further defined in Appendix C. As depicted in Figure 1 to this Appendix A,the existing Developer Attachment Facilities include: ● One (1) three-phase, two winding, 115 kV (wye-grounded) – 13.2 kV (Delta), 37.5 MVA transformer, with a 11.8% impedance and 6 sets of 600:5 MR bushing CTs (two per primary phase); and ● One (1) 115 kV, 1200 A, 550 kV BIL, 20 kA, S&C Model 2010 Circuit Switcher (988).
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement