Existing Facility. The Interconnection Customer will design and construct the GSU Transformer Station, the Chautauqua Line and the Interconnection Customer Interconnection Facilities, in accordance with the Facilities Study Report dated March 5, 2009, and to the extent not inconsistent with the terms of this Agreement and the NYISO OATT, in accordance with (1) the applicable requirements of the Connecting Transmission Owner, as set out in National Grid Electric System Bulletin 756, and (2) the Connecting Transmission Owner’s project specific electrical requirements, as documented in the project’s Specification for Electrical Installation dated March 5, 2009 and as such specifications may be amended or superseded during final design under this Interconnection Agreement. The Interconnection Customer has elected to design and construct the Chautauqua Line that will run from the receiving structure at the GSU Transformer Station to the POI on the Xxxxxxxxx-South Dow Line #859. Line design must be completed by a Connecting Transmission Owner approved New York State licensed design professional and submitted to the Connecting Transmission Owner for review and approval. Construction of the line must be completed by a Connecting Transmission Owner approved contractor. Design and construction shall be in accordance with the National Grid Electric System Bulletin 756: Requirements for Parallel Generation Connected to National Grid Owned EPS (“ESB 756”), the latest edition of applicable ANSI and IEEE Standards, the “National Electrical Safety Code,” and good engineering practice. The Interconnection Customer is responsible for: (i) obtaining all permits and easements associated with the Chautauqua Line construction, and (ii) completing all clearing required. The Interconnection Customer will transfer ownership of the Chautauqua Line to the Connecting Transmission Owner upon completion and commissioning for $1.00 (one dollar). The Interconnection Customer will complete the line tap at GSU Transformer Station, as part of the line construction. The Interconnection Customer will provide and install the two (2) high-accuracy- extended-range Xxxxxxx (CXM 200) CTs and two (2) Xxxxxxx (POF 200) PTs on the 34.5 kV side and the metering socket.
Appears in 3 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Existing Facility. The Interconnection Customer will design and construct the GSU Transformer Station, the Chautauqua Line and the Interconnection Customer Interconnection Facilities, in accordance with the Facilities Study Report dated March 5, 2009, and to the extent not inconsistent with the terms of this Agreement and the NYISO OATT, in accordance with (1) the applicable requirements of the Connecting Transmission Owner, as set out in National Grid Electric System Bulletin 756, and (2) the Connecting Transmission Owner’s project specific electrical requirements, as documented in the project’s Specification for Electrical Installation dated March 5, 2009 and as such specifications may be amended or superseded during final design under this Interconnection Agreement. The Interconnection Customer has elected to design and construct the Chautauqua Line that will run from the receiving structure at the GSU Transformer Station to the POI on the Xxxxxxxxx-South Dow Line 000 Xxxx #859000. Line design must be completed by a Connecting Transmission Owner approved New York State licensed design professional and submitted to the Connecting Transmission Owner for review and approval. Construction of the line must be completed by a Connecting Transmission Owner approved contractor. Design and construction shall be in accordance with the requirements set forth in the March 5, 2009 Facilities Study Report, including but not limited to,National Grid Electric System Bulletin 756: Requirements for Parallel Generation Connected to National Grid Owned EPS (“ESB 756”), the latest edition of applicable ANSI and IEEE Standards, the “National Electrical Safety Code,” and good engineering practice. The Interconnection Customer is responsible for: (i) obtaining all permits and easements associated with the Chautauqua Line construction, and (ii) completing all clearing required. The Interconnection Customer will transfer ownership of the Chautauqua Line to the Connecting Transmission Owner upon completion and commissioning for $1.00 (one dollar). The Interconnection Customer will complete the line tap at GSU Transformer Station, as part of the line construction. The Interconnection Customer will provide and install the two (2) high-accuracy- extended-range Xxxxxxx (CXM 200) CTs and two (2) Xxxxxxx (POF 200) PTs on the 34.5 kV side and the metering socket. The Interconnection Customer will mount the RTU, and wire AC & DC to it.
Appears in 1 contract
Samples: Interconnection Agreement
Existing Facility. The Interconnection Customer will design and construct the GSU Transformer Station, the Chautauqua Line and the Interconnection Customer Interconnection Facilities, in accordance with the Facilities Study Report dated March 5, 2009, and to the extent not inconsistent with the terms of this Agreement and the NYISO OATT, in accordance with (1) the applicable requirements of the Connecting Transmission Owner, as set out in National Grid Electric System Bulletin 756, and (2) the Connecting Transmission Owner’s project specific electrical requirements, as documented in the project’s Specification for Electrical Installation dated March 5, 2009 and as such specifications may be amended or superseded during final design under this Interconnection Agreement. The Interconnection Customer has elected to design and construct the Chautauqua Line that will run from the receiving structure at the GSU Transformer Station to the POI on the XxxxxxxxxHartfield-South Dow Line #859. Line design must be completed by a Connecting Transmission Owner approved New York State licensed design professional and submitted to the Connecting Transmission Owner for review and approval. Construction of the line must be completed by a Connecting Transmission Owner approved contractor. Design and construction shall be in accordance with the National Grid Electric System Bulletin 756: Requirements for Parallel Generation Connected to National Grid Owned EPS (“ESB 756”), the latest edition of applicable ANSI and IEEE Standards, the “National Electrical Safety Code,” and good engineering practice. The Interconnection Customer is responsible for: (i) obtaining all permits and easements associated with the Chautauqua Line construction, and (ii) completing all clearing required. The Interconnection Customer will transfer ownership of the Chautauqua Line to the Connecting Transmission Owner upon completion and commissioning for $1.00 (one dollar). The Interconnection Customer will complete the line tap at GSU Transformer Station, as part of the line construction. The Interconnection Customer will provide and install the two (2) high-accuracy- extended-range Xxxxxxx (CXM 200) CTs and two (2) Xxxxxxx (POF 200) PTs on the 34.5 kV side and the metering socket.
Appears in 1 contract
Samples: Interconnection Agreement