Existing Railroad Crossings. 6 The Project interfaces with the railroad corridor owned and operated by Union Pacific Railroad 7 (UPRR). There is an existing railroad at-grade crossing of the UPRR within the Project, which 8 has specific a USDOT number as reflected in Table 436-1. 9 436.2 ADMINISTRATIVE REQUIREMENTS 10 436.2.1 Standards 11 Developer shall perform all design Work impacting the railroad in accordance with the 12 standards, manuals, and guidelines listed in Table 436-2. 1 BNSF/UPRR Guidelines for Railroad Grade Separation Projects 2 AREMA Manual for Railway Engineering 13 Developer shall perform the design Work impacting the railroad in accordance with the 23 CFR 14 646, UPRR Construction and Maintenance Agreements, and Arizona Corporation Commission 15 (ACC) authorization.
Appears in 2 contracts
Samples: Design Build Maintain Agreement, Design Build Maintain Agreement
Existing Railroad Crossings. 6 The Project interfaces with the railroad corridor owned and operated by Union Pacific Railroad 7 (UPRR). There is an 7 existing railroad at-grade crossing of the UPRR within the Project, which has a specific USDOT 8 has specific a USDOT number as reflected in Table 436-1. 9 436.2 ADMINISTRATIVE REQUIREMENTS 10 436.2.1 Standards 11 Developer shall perform all design construction Work impacting the railroad in accordance with the 12 standards, manuals, and guidelines listed in Table 436-2. 1 BNSF/UPRR Guidelines for Railroad Grade Separation Projects 2 AREMA Manual for Railway Engineering 13 Developer shall perform the design construction Work impacting the railroad in accordance with the 23 14 CFR 14 646, UPRR Construction and Maintenance Agreements, and Arizona Corporation 15 Commission 15 (ACC) authorization.
Appears in 2 contracts
Samples: Design Build Maintain Agreement, Design Build Maintain Agreement