Existing. The CTO IFs for the Existing Facility are as follows: Line tap at pole 17 ½; Approximately 1 mile of overhead 34.5 kV, 336.4 AL, 19 strand cable (“Generator Lead Line”); One (1) 3 pole gang operated load break switch, 34.5 kV, 1200 A (switch 566) at Pole 209-1; Three (3) single phase 29 kV MCOV surge arrestors; Three (3) metering potential transformers (PTs) 20125/115; Three (3) metering current transformers (CTs) 25:5: One (1) revenue meter; and One (1) Remote Transmitting Unit (RTU).
Appears in 5 contracts
Samples: Small Generator Interconnection Agreement, Small Generator Interconnection Agreement, Small Generator Interconnection Agreement
Existing. The CTO IFs for the Existing Facility are as follows: • Line tap at pole 17 ½; • Approximately 1 mile of overhead 34.5 kV, 336.4 AL, 19 strand cable (“Generator Lead Line”); • One (1) 3 pole gang operated load break switch, 34.5 kV, 1200 A (switch 566) at Pole 209-1; • Three (3) single phase 29 kV MCOV surge arrestors; • Three (3) metering potential transformers (PTs) 20125/115; • Three (3) metering current transformers (CTs) 25:5: • One (1) revenue meter; and One (1) Remote Transmitting Unit (RTU).and
Appears in 1 contract
Existing. The CTO IFs for the Existing Facility are as follows: • Line tap at pole 17 ½; • Approximately 1 mile of overhead 34.5 kV, 336.4 AL, 19 strand cable (“Generator Lead Line”); • One (1) 3 pole gang operated load break switch, 34.5 kV, 1200 A (switch 566) at Pole 209-1; • Three (3) single phase 29 kV MCOV surge arrestors; • Three (3) metering potential transformers (PTs) 20125/115; • Three (3) metering current transformers (CTs) 25:5: • One (1) revenue meter; and • One (1) Remote Transmitting Unit (RTU).
Appears in 1 contract