EXTERNAL WORKS. Amount 1 Demolish and cart away single storey toilet block complete, size on plan 3200mm long x 3000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 Pit toilets 2 Allow for de-sludging of existing "long drop" pit latrines by means of "honey sucker". The pit latrines are to be completely empty before any other work is carried out. No 3 3 Allow for breaking down and removing from site entire pit latrine structure including any structure that may be inside the pit. Demolition is to only commence once the latrine has been completely emptied (elsewhere measured). Backfill existing hole with imported filling in max 150mm layers and compact to 95% MOD AASHTO density. No 3 THE FOLLOWING IN WALKWAYS, RAMPS, ETC. EARTHWORKS Site clearance 4 Clear the areas to be developed of all rubbish, debris, vegetation, shrubs, xxxx and small trees not exceeding 200mm girth and remove from site. m2 120 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 5 Reduced levels under solid floors. m3 24 Carting away of excavated material 6 Load surplus or unsuitable material from spoil heaps and cart away to a dumping site to be located by the Contractor. m3 24 Carried to Collection R BUILDING WORKS

Appears in 3 contracts

Samples: themvulatrust.org.za, themvulatrust.org.za, themvulatrust.org.za

AutoNDA by SimpleDocs

EXTERNAL WORKS. Amount 1 Demolish and cart away single storey toilet block complete, size on plan 32002200mm long x 3000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 Pit toilets 2 Allow for de-sludging of existing "long drop" pit latrines by means of "honey sucker". The pit latrines are to be completely empty before any other work is carried out. No 3 3 Allow for breaking down and removing from site entire pit latrine structure including any structure that may be inside the pit. Demolition is to only commence once the latrine has been completely emptied (elsewhere measured). Backfill existing hole with imported filling in max 150mm layers and compact to 95% MOD AASHTO density. No 3 THE FOLLOWING IN WALKWAYS, RAMPS, ETC. EARTHWORKS Site clearance 4 Clear the areas to be developed of all rubbish, debris, vegetation, shrubs, xxxx and small trees not exceeding 200mm girth and remove from site. m2 120 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 5 Reduced levels under solid floors. m3 24 Carting away of excavated material 6 Load surplus or unsuitable material from spoil heaps and cart away to a dumping site to be located by the Contractor. m3 24 Carried to Collection R BUILDING WORKS

Appears in 2 contracts

Samples: themvulatrust.org.za, 102.37.123.153

EXTERNAL WORKS. Amount 1 Demolish and cart away single storey toilet block complete, size on plan 3200mm long x 3000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block facebrick walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 Pit toilets 2 Allow for de-sludging of existing "long drop" pit latrines by means of "honey sucker". The pit latrines are to be completely empty before any other work is carried out. No 3 3 Allow for breaking down and removing from site entire pit latrine structure including any structure that may be inside the pit. Demolition is to only commence once the latrine has been completely emptied (elsewhere measured). Backfill existing hole with imported filling in max 150mm layers and compact to 95% MOD AASHTO density. No 3 THE FOLLOWING IN WALKWAYS, RAMPS, ETC. EARTHWORKS Site clearance 4 Clear the areas to be developed of all rubbish, debris, vegetation, shrubs, xxxx and small trees not exceeding 200mm girth and remove from site. m2 120 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 5 Reduced levels under solid floors. m3 24 Carting away of excavated material 6 Load surplus or unsuitable material from spoil heaps and cart away to a dumping site to be located by the Contractor. m3 24 Carried to Collection R BUILDING WORKS

Appears in 2 contracts

Samples: themvulatrust.org.za, themvulatrust.org.za

EXTERNAL WORKS. Amount 1 Demolish and cart away single storey toilet block complete, size on plan 32004400mm long x 3000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block facebrick walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 Pit toilets 2 Allow for de-sludging of existing "long drop" pit latrines by means of "honey sucker". The pit latrines are to be completely empty before any other work is carried out. No 3 3 Allow for breaking down and removing from site entire pit latrine structure including any structure that may be inside the pit. Demolition is to only commence once the latrine has been completely emptied (elsewhere measured). Backfill existing hole with imported filling in max 150mm layers and compact to 95% MOD AASHTO density. No 3 THE FOLLOWING IN WALKWAYS, RAMPS, ETC. EARTHWORKS Site clearance 4 Clear the areas to be developed of all rubbish, debris, vegetation, shrubs, xxxx and small trees not exceeding 200mm girth and remove from site. m2 120 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 5 Reduced levels under solid floors. m3 24 Carting away of excavated material 6 Load surplus or unsuitable material from spoil heaps and cart away to a dumping site to be located by the Contractor. m3 24 Carried to Collection R BUILDING WORKS

Appears in 2 contracts

Samples: themvulatrust.org.za, themvulatrust.org.za

EXTERNAL WORKS. Amount 1 Demolish and cart away single storey toilet block complete, size on plan 32002200mm long x 3000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block facebrick walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 Pit toilets 2 Allow for de-sludging of existing "long drop" pit latrines by means of "honey sucker". The pit latrines are to be completely empty before any other work is carried out. No 3 3 Allow for breaking down and removing from site entire pit latrine structure including any structure that may be inside the pit. Demolition is to only commence once the latrine has been completely emptied (elsewhere measured). Backfill existing hole with imported filling in max 150mm layers and compact to 95% MOD AASHTO density. No 3 THE FOLLOWING IN WALKWAYS, RAMPS, ETC. EARTHWORKS Site clearance 4 Clear the areas to be developed of all rubbish, debris, vegetation, shrubs, xxxx and small trees not exceeding 200mm girth and remove from site. m2 120 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 5 Reduced levels under solid floors. m3 24 Carting away of excavated material 6 Load surplus or unsuitable material from spoil heaps and cart away to a dumping site to be located by the Contractor. m3 24 Carried to Collection R BUILDING WORKS

Appears in 1 contract

Samples: themvulatrust.org.za

EXTERNAL WORKS. Amount 1 Demolish and cart away single storey toilet block complete, size on plan 3200mm long x 3000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 2 Demolish and cart away single storey toilet block complete, size on plan 3300mm long x 3000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 Pit toilets 2 3 Allow for de-sludging of existing "long drop" pit latrines by means of "honey sucker". The pit latrines are to be completely empty before any other work is carried out. No 3 3 4 4 Allow for breaking down and removing from site entire pit latrine structure including any structure that may be inside the pit. Demolition is to only commence once the latrine has been completely emptied (elsewhere measured). Backfill existing hole with imported filling in max 150mm layers and compact to 95% MOD AASHTO density. No 3 4 THE FOLLOWING IN WALKWAYS, RAMPS, ETC. EARTHWORKS Site clearance 4 5 Clear the areas to be developed of all rubbish, debris, vegetation, shrubs, xxxx and small trees not exceeding 200mm girth and remove from site. m2 120 Carried to Collection R BUILDING WORKS Bill No. 13 EXTERNAL WORKS Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 5 1 Reduced levels under solid floors. m3 24 Carting away of excavated material 6 2 Load surplus or unsuitable material from spoil heaps and cart away to a dumping site to be located by the Contractor. m3 24 Carried to Collection R BUILDING WORKS24

Appears in 1 contract

Samples: themvulatrust.org.za

EXTERNAL WORKS. Amount 1 Demolish and cart away single storey toilet block complete, size on plan 3200mm long x 3000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 Pit toilets 2 Allow for de-sludging of existing "long drop" pit latrines by means of "honey sucker". The pit latrines are to be completely empty before any other work is carried out. No 3 3 Allow for breaking down and removing from site entire pit latrine structure including any structure that may be inside the pit. Demolition is to only commence once the latrine has been completely emptied (elsewhere measured). Backfill existing hole with imported filling in max 150mm layers and compact to 95% MOD AASHTO density. No 3 THE FOLLOWING IN WALKWAYS, RAMPS, ETC. EARTHWORKS Site clearance 4 Clear the areas to be developed of all rubbish, debris, vegetation, shrubs, xxxx and small trees not exceeding 200mm girth and remove from site. m2 120 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 5 Reduced levels under solid floors. m3 24 Carting away of excavated material 6 Load surplus or unsuitable material from spoil heaps and cart away to a dumping site to be located by the Contractor. m3 24 Carried to Collection R BUILDING WORKSmaterial

Appears in 1 contract

Samples: themvulatrust.org.za

AutoNDA by SimpleDocs

EXTERNAL WORKS. Amount 1 Demolish and cart away single storey toilet block complete, size on plan 32006000mm long x 30002000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 Pit toilets 2 Allow for de-sludging of existing "long drop" pit latrines by means of "honey sucker". The pit latrines are to be completely empty before any other work is carried out. No 3 3 Allow for breaking down and removing from site entire pit latrine structure including any structure that may be inside the pit. Demolition is to only commence once the latrine has been completely emptied (elsewhere measured). Backfill existing hole with imported filling in max 150mm layers and compact to 95% MOD AASHTO density. No 3 THE FOLLOWING IN WALKWAYS, RAMPS, ETC. EARTHWORKS Site clearance 4 Clear the areas to be developed of all rubbish, debris, vegetation, shrubs, xxxx and small trees not exceeding 200mm girth and remove from site. m2 120 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 5 Reduced levels under solid floors. m3 24 Carting away of excavated material 6 Load surplus or unsuitable material from spoil heaps and cart away to a dumping site to be located by the Contractor. m3 24 Carried to Collection R BUILDING WORKS

Appears in 1 contract

Samples: themvulatrust.org.za

EXTERNAL WORKS. Amount 1 Demolish and cart away single storey toilet block complete, size on plan 32002000mm long x 30002000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 Pit toilets 2 Allow for de-sludging of existing "long drop" pit latrines by means of "honey sucker". The pit latrines are to be completely empty before any other work is carried out. No 3 3 Allow for breaking down and removing from site entire pit latrine structure including any structure that may be inside the pit. Demolition is to only commence once the latrine has been completely emptied (elsewhere measured). Backfill existing hole with imported filling in max 150mm layers and compact to 95% MOD AASHTO density. No 3 THE FOLLOWING IN WALKWAYS, RAMPS, ETC. EARTHWORKS Site clearance 4 Clear the areas to be developed of all rubbish, debris, vegetation, shrubs, xxxx and small trees not exceeding 200mm girth and remove from site. m2 120 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 5 Reduced levels under solid floors. m3 24 Carting away of excavated material 6 Load surplus or unsuitable material from spoil heaps and cart away to a dumping site to be located by the Contractor. m3 24 Carried to Collection R BUILDING WORKS

Appears in 1 contract

Samples: themvulatrust.org.za

EXTERNAL WORKS. Amount 1 Demolish and cart away single storey toilet block complete, size on plan 320012000mm long x 3000mm wide x approximately 3000mm high, comprised of corrugated iron roof covering on mono-pitch timber rafters, with concrete block walls including timber doors, ground floor concrete surface bed with granolithic floor covering, sanitary fittings, etc. including grubbing up foundations and backfilling holes with material from the stockpiles on site. No 1 Pit toilets 2 Allow for de-sludging of existing "long drop" pit latrines by means of "honey sucker". The pit latrines are to be completely empty before any other work is carried out. No 3 3 Allow for breaking down and removing from site entire pit latrine structure including any structure that may be inside the pit. Demolition is to only commence once the latrine has been completely emptied (elsewhere measured). Backfill existing hole with imported filling in max 150mm layers and compact to 95% MOD AASHTO density. No 3 THE FOLLOWING IN WALKWAYS, RAMPS, ETC. EARTHWORKS Site clearance 4 Clear the areas to be developed of all rubbish, debris, vegetation, shrubs, xxxx and small trees not exceeding 200mm girth and remove from site. m2 120 Excavate in earth not exceeding 2m deep including trimming sides, levelling and ramming bottoms and deposit in spoil heaps for later re-use or cart away 5 Reduced levels under solid floors. m3 24 Carting away of excavated material 6 Load surplus or unsuitable material from spoil heaps and cart away to a dumping site to be located by the Contractor. m3 24 Carried to Collection R BUILDING WORKS

Appears in 1 contract

Samples: themvulatrust.org.za

Time is Money Join Law Insider Premium to draft better contracts faster.