Fee Calculation and Collection Sample Clauses

The Fee Calculation and Collection clause defines how fees are determined and the process by which they are collected from the relevant parties. Typically, this clause outlines the basis for calculating fees, such as fixed rates, percentages, or milestones, and specifies the timing and method of payment, such as monthly invoicing or automatic deductions. Its core practical function is to ensure both parties have a clear understanding of financial obligations, reducing the risk of disputes over payment amounts or schedules.
Fee Calculation and Collection. The assessment fee will be deducted from the amount due the Contractor on the monthly construction estimate, and thus retained by the Department. The Engineer will determine the time of overlap of lane closure(s) or obstruction(s) for calculating the assessment fee. The assessment fee is based on road user costs and is assessed not as a penalty, but for added expense incurred by the traveling public. Special Provision to Item 8 Prosecution and Progress
Fee Calculation and Collection. The assessment fee will be deducted from the amount due the Contractor on the monthly construction estimate, and thus retained by the Department. The Engineer will determine the time of overlap of lane closure(s) or obstruction(s) for calculating the assessment fee. The assessment fee is based on road user costs and is assessed not as a penalty, but for added expense incurred by the traveling public. Special Provision to Item 506 Temporary Erosion, Sedimentation, and Environmental Controls Article 506.1., “Description,” is voided and replaced by the following: Article 506.3., “Qualifications, Training, and Employee Requirements,” is voided and not replaced. Section 506.4.1., “Contractor Responsibilities,” Section 506.4.2., “Implementation,” and Section 506.4.3., “General,” are voided and replaced by the following:
Fee Calculation and Collection. The assessment fee will be deducted from the amount due the Contractor on the monthly construction estimate, and thus retained by the Department. The Engineer will determine the time of overlap of lane closure(s) or obstruction(s) for calculating the assessment fee. The assessment fee is based on road user costs and is assessed not as a penalty, but for added expense incurred by the traveling public. THE STATE OF TEXAS THE COUNTY OF ▇▇▇▇▇▇ CONTRACT NO. 02161201 CONTROL ▇▇▇▇-▇▇-▇▇▇ PROJECT RMC - 629626001 HIGHWAY SL0008 COUNTY ▇▇▇▇▇▇ HIGHWAY MAINTENANCE IMPROVEMENT CONTRACT
Fee Calculation and Collection. The assessment fee will be deducted from the amount due the Contractor on the monthly construction estimate, and thus retained by the Department. The Engineer will determine the time of overlap of lane closure(s) or obstruction(s) for calculating the assessment fee. The assessment fee is based on road user costs and is assessed not as a penalty, but for added expense incurred by the traveling public. Special Provision to Item 421 Hydraulic Cement Concrete Article 421.4.2, “Mix Design Proportioning,” Table 8 is voided and replaced by the following. Table 8 Concrete Classes 1. Design strength must be attained within 56 days. 2. Do not use Grade 1 coarse aggregate except in massive foundations with 4 in. minimum clear spacing between reinforcing steel bars, unless otherwise permitted. Do not use Grade 1 aggregate in drilled shafts. 3. Use Grade 8 aggregate in extruded curbs unless otherwise approved. 4. Other grades of coarse aggregate maybe used in non-structural concrete classes when allowed by the Engineer.
Fee Calculation and Collection. The assessment fee will be deducted from the amount due the Contractor on the monthly construction estimate, and thus retained by the Department. The Engineer will determine the time of overlap of lane closure(s) or obstruction(s) for calculating the assessment fee. The assessment fee is based on road user costs and is assessed not as a penalty, but for added expense incurred by the traveling public. THE STATE OF TEXAS THE COUNTY OF ▇▇▇▇▇▇ CONTRACT NO. 07161203 CONTROL ▇▇▇▇-▇▇-▇▇▇ PROJECT ▇▇▇ - ▇▇▇▇▇▇▇▇▇ ▇▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇▇▇▇▇▇ HIGHWAY MAINTENANCE IMPROVEMENT CONTRACT