Final Drawings. 4.1 Contractor shall provide Record Drawings for the entire Project, consisting of mechanical, electrical, and civil drawings, general arrangements, instrumentation diagrams, one-line, three-line, schematics, wiring, cable tray, routed conduit, and duct banks, and other drawings as mutually agreed upon by Owner and Contractor. Documents shall be re-drafted as necessary to incorporate final information. Xxxx-up sketches, referencing, and other field marking techniques are not acceptable as final Record Drawings. Contractor shall prepare “conformed to construction record” of the original drawings or data sheets. 4.2 During construction, Contractor shall maintain on file in the field reasonably current as-built redline xxxx-ups of all drawings and data sheets to agree with actual work undertaken. 4.3 Record drawings shall be issued by Contractor as the next sequential revision from previous releases. The revision block shall state Record Drawings. All clouds, revision diamonds, and other interim control marking shall be removed. All information listed as “later” or “hold” shall be completed or deleted. The conformed to construction record drawings shall be clear and readable in full size, and where possible, also in 11”x17” size reduction. 4.4 Major Subcontractors' drawings shall be conformed to construction records to reflect actual installed configuration. These Subcontractor drawings shall be in sufficient detail to indicate the kind, size, arrangement, weight of each component, and operation of component materials and devices, the external connections, anchorages, and supports required; the dimensions needed for installation, and correlation with other materials and equipment. Final Subcontractor's drawings shall be bound in the equipment Operation & Maintenance Manuals. One electronic copy, in portable document format (*.pdf), of the vendor drawings shall be provided. 4.5 Contractor shall provide one hard copy set of Record Drawings to Owner, in 12”x18” size.
Appears in 3 contracts
Samples: Engineering, Procurement and Construction Agreement (Sunpower Corp), Engineering, Procurement and Construction Agreement (Sunpower Corp), Engineering, Procurement and Construction Agreement (Sunpower Corp)
Final Drawings. 4.1 Contractor Developer shall provide Record Drawings detailed “as built” drawings for the entire ProjectProject consisting of, consisting of but not limited to, plan and profile sheets, foundation detail drawings, mechanical, electrical, and civil drawings, general arrangements, instrumentation diagramscivil, one-line, three-line, schematics, control logic, wiring, cable trayraceways, routed conduit, conduits and duct banks, and other drawings as mutually agreed upon by Owner and Contractor. Documents shall be re-drafted as necessary to incorporate final information. XxxxMark-up sketchessketch, referencing, and other field marking techniques are not acceptable as final Record Drawingsconformed drawings. Contractor Developer shall prepare “conformed to construction recordFor Record Purposes” of the original drawings or data sheets.
4.2 . During construction, Contractor Developer shall update and maintain on file in the field reasonably current as-built redline xxxxmark-ups of all drawings and data sheets to agree with represent actual work undertaken.
4.3 Record completed. Conformed drawings developed by Developer shall be issued by Contractor as the next sequential revision from previous releases. The revision block shall state “For Record DrawingsPurposes”. All clouds, revision diamonds, and other interim control marking markings shall be removed. All information listed as “later” or “hold” shall be completed or deletedcompleted. The conformed to construction record drawings shall be clear and readable in both full size, size and where possible, also in 11”x17” B size reduction.
4.4 Major . Developer shall provide new versions of Contractor and Subcontractor drawings if PacifiCorp judges originals to be too damaged, deteriorated, or illegible. All Contractor’s and Subcontractors' ’ drawings shall be conformed to construction records to reflect actual installed configuration. These Contractor and Subcontractor drawings shall be in sufficient detail to indicate the kind, size, arrangement, weight of each component, and operation of component materials and devices, the external connections, anchorages, and supports required; the dimensions needed for installation, and correlation with other materials and equipment. Final Subcontractor's Contractor and Subcontractor drawings shall be bound in the equipment Operation & Maintenance Manualsoperation and maintenance manuals. One electronic copy, in portable document format (*.pdf), of the vendor drawings copy for each drawing shall be providedsupplied in AutoCAD format in a version acceptable to PacifiCorp. Drawing Information: All AutoCAD and drawing requirements are per Specification DCAP876. This specification includes, but is not limited to, information on the following: PacifiCorp Title Block Information. Borders are provided and required.
4.5 Contractor shall provide one hard copy set of Record Drawings to Owner, in 12”x18” size.
Appears in 1 contract
Samples: Build Transfer Agreement
Final Drawings. 4.1 Contractor shall provide Record Drawings detailed “as built” drawings for the entire Projectproject consisting of, consisting of but not limited to, plan and profile sheets, foundation detail drawings, mechanical, electrical, and civil drawingscivil, general arrangementsone‑line, instrumentation diagrams, one-line, three-linethree‑line, schematics, control logic, wiring, cable trayraceways, routed conduit, conduits and duct banks, and other drawings as mutually agreed upon by Owner and Contractor. Documents shall be re-drafted re‑drafted as necessary to incorporate final information. Xxxx-up sketchesMark‑up sketch, referencing, and other field marking techniques are not acceptable as final Record Drawingsconformed drawings. Contractor shall prepare “conformed to construction recordFor Record Purposes” of the original drawings or data sheets.
4.2 . During construction, Contractor shall update and maintain on file in the field reasonably current as-built redline xxxx-ups mark‑ups of all drawings and data sheets to agree with represent actual work undertaken.
4.3 Record completed. Conformed drawings developed by the Contractor shall be issued by Contractor as the next sequential revision from previous releases. The revision block shall state “For Record DrawingsPurposes”. All clouds, revision diamonds, and other interim control marking markings shall be removed. All information listed as “later” or “hold” shall be completed or deletedcompleted. The conformed to construction record drawings shall be clear and readable in both full size, size and where possible, also in 11”x17” B size reduction.
4.4 Major . Contractor shall provide new versions of Subcontractor drawings if the Owner judges originals to be too damaged, deteriorated, or illegible. All Subcontractors' ’ drawings shall be conformed to construction records to reflect actual installed configuration. These Subcontractor drawings shall be in sufficient detail to indicate the kind, size, arrangement, weight of each component, and operation of component materials and devices, the external connections, anchorages, and supports required; the dimensions needed for installation, and correlation with other materials and equipment. Final Subcontractor's ’s drawings shall be bound in the equipment Operation & Maintenance Manualsoperation and maintenance manuals. One electronic copy, in portable document format (*.pdf), of the vendor drawings copy for each drawing shall be provided.
4.5 Contractor shall provide one hard copy set of Record Drawings supplied in AutoCAD format in a version acceptable to Owner, in 12”x18” size.El Paso Electric Co.
Appears in 1 contract
Samples: Solar Epc Agreement