Common use of Final Invoice Clause in Contracts

Final Invoice. As soon as reasonably practicable, but within twelve months after completion of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO shall provide an invoice of the final cost of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with the Participating TO’s Interconnection Facilities and Distribution Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; or, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the Participating TO shall recover such difference through its transmission service rates.

Appears in 36 contracts

Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement

AutoNDA by SimpleDocs

Final Invoice. As soon as reasonably practicable, but within twelve months after completion of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO shall provide an invoice of the final cost of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with the Participating TO’s Interconnection Facilities and Distribution Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; or, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the Participating TO shall recover such difference through its transmission service rates.thirty

Appears in 36 contracts

Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement, Large Generator Interconnection Agreement

Final Invoice. As soon as reasonably practicable, but within twelve months after completion of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO shall provide an invoice of the final cost of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with the Participating TO’s Interconnection Facilities and Distribution Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; or, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the Participating TO shall recover such difference through its transmission service rates.to

Appears in 4 contracts

Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement (Lgia), Large Generator Interconnection Agreement (Lgia)

Final Invoice. As soon as reasonably practicable, but within twelve months after completion of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO shall provide an invoice of the final cost of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with the Participating TO’s Interconnection Facilities and Distribution Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; or, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the Participating TO shall recover such difference through its transmission service rates.the

Appears in 2 contracts

Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement

Final Invoice. As soon as reasonably practicable, but within twelve months after completion of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO shall provide an invoice of the final cost of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with the Participating TO’s Interconnection Facilities and Distribution Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; or, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the Participating TO shall recover such difference through its transmission service rates.rates.‌

Appears in 2 contracts

Samples: Large Generator Interconnection Agreement, Large Generator Interconnection Agreement

Final Invoice. As soon as reasonably practicable, but within twelve months after completion of the construction of the a Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the that Participating TO shall provide an invoice of the final cost of the construction of the that Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with the that Participating TO’s Interconnection Facilities and Distribution Upgrades, the that Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; or, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the that Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the that Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costscosts for that Participating TO’s Network Upgrades, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the that Participating TO shall recover such difference through its transmission service rates.

Appears in 1 contract

Samples: Large Generator Interconnection Agreement

Final Invoice. As soon as reasonably practicable, but within twelve Within six months after completion of the construction of the Participating TO’s Transmission Provider's Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO Transmission Provider shall provide an invoice of the final cost of the construction of the Participating TO’s Transmission Provider's Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with In the Participating TOevent that the final, actual cost of Transmission Provider’s Interconnection Facilities Facilities, Network Upgrades, and Distribution UpgradesUpgrades is less than the estimated cost paid by Interconnection Customer, the Participating TO then Transmission Provider shall refund to the Interconnection Customer any amount by which the actual payment made by the Interconnection Customer for the estimated costs exceeds the actual costs cost of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; orTransmission Provider’s Interconnection Facilities, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs and Distribution Upgrades exceeds the final, actual costs cost of construction multiplied by the Transmission Provider’s Interconnection Customer’s percentage share of those costsFacilities, as set forth in Appendix G to this LGIA Network Upgrades, and Distribution Upgrades within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event that the final, actual costs cost of construction multiplied Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades is more than the estimated cost paid by Interconnection Customer for the Transmission Provider’s Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costsFacilities, Network Upgrades, and Distribution Upgrades, then Interconnection Customer shall pay to Transmission Provider any amount by which the Participating TO shall recover such difference through its transmission service rates.final, actual cost of Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades exceeds the payment made by Interconnection Customer for the estimated cost of Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades within

Appears in 1 contract

Samples: Generator Interconnection Agreement

Final Invoice. As soon as reasonably practicable, but within twelve Within six months after completion of the construction of the Participating TO’s Transmission Provider's Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO Transmission Provider shall provide an invoice of the final cost Interconnection Customer’s share of the construction of final, actual costs incurred during the Participating TO’s Procurement and Construction Phase costs for Transmission Provider's Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to In the event that Interconnection Customer’s share of the final, actual costs associated with incurred during the Participating TOProcurement and Construction Phase costs for Transmission Provider’s Interconnection Facilities Facilities, Network Upgrades, and Distribution UpgradesUpgrades is less than the estimated costs paid by Interconnection Customer, the Participating TO then Transmission Provider shall refund to the Interconnection Customer any amount by which the actual payment made by the Interconnection Customer for the estimated Procurement and Construction Phase costs of procuring and constructing Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades exceeds Interconnection Customer’s share of the final, actual costs of construction incurred during the Procurement and Construction Phase costs offor Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades within thirty (30) Calendar Days of the issuance of such final construction invoice; orprovided, however, that if, at the time such final invoice is delivered to Interconnection Customer by Transmission Provider, Interconnection Customer has already received transmission rate credits from Transmission Provider in the event the actual costs excess of construction exceed the Interconnection Customer’s share of the final, actual payment for estimated Procurement and Construction Phase costs, Transmission Provider shall not be required to provide an additional monetary refund of the excess amount for which Transmission Provider has already Interconnection Customer’s share provided transmission rate credits Procurement and Construction Phase costs incurred during the Procurement and Construction Phase for Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades is more than the estimated Procurement and Construction Phase costs paid by Interconnection Customer for the procurement and construction of Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, then the Interconnection Customer shall pay to the Participating TO Transmission Provider any amount by which the final, actual Procurement and Construction Phase costs of construction exceed incurred during the actual Procurement and Construction Phase for Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades exceeds the payment made by the Interconnection Customer for the estimated Procurement and Construction Phase costs of procuring and constructing Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the Participating TO shall recover such difference through its transmission service rates.

Appears in 1 contract

Samples: Transitional Cluster Generator Interconnection Agreement

AutoNDA by SimpleDocs

Final Invoice. As soon as reasonably practicable, but within withinWithin twelve (12) months after completion of the construction of the Participating TO’s TO’sDistribution Provider's Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and the Participating TO TONetwork Upgrades, Distribution Provider shall provide an invoice of the final cost of the construction of the Participating TO’s TO’sDistribution Provider's Interconnection Facilities, Distribution Upgrades, and the Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with the Participating TO’s Interconnection Facilities and Distribution Upgrades, the Participating TO TODistribution Provider shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; or, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the Participating TO shall recover such difference through its transmission service rates. .

Appears in 1 contract

Samples: Generator Interconnection Agreement (Gia)

Final Invoice. As soon as reasonably practicable, but within twelve Within six months after completion of the construction of the Participating TO’s Transmission Provider's Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO Transmission Provider shall provide an invoice of the final cost of the construction of the Participating TO’s Transmission Provider's Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with In the Participating TOevent that the final, actual cost of Transmission Provider’s Interconnection Facilities Facilities, Network Upgrades, and Distribution UpgradesUpgrades is less than the estimated cost paid by Interconnection Customer, the Participating TO then Transmission Provider shall refund to the Interconnection Customer any amount by which the actual payment made by the Interconnection Customer for the estimated costs exceeds the actual costs cost of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; orTransmission Provider’s Interconnection Facilities, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs and Distribution Upgrades exceeds the final, actual costs cost of construction multiplied by the Transmission Provider’s Interconnection Customer’s percentage share of those costsFacilities, as set forth in Appendix G to this LGIA Network Upgrades, and Distribution Upgrades within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event that the final, actual costs cost of construction multiplied Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades is more than the estimated cost paid by Interconnection Customer for the Transmission Provider’s Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costsFacilities, Network Upgrades, and Distribution Upgrades, then Interconnection Customer shall pay to Transmission Provider any amount by which the Participating TO shall recover final, actual cost of Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades exceeds the payment made by Interconnection Customer for the estimated cost of Transmission Provider’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades within thirty (30) Calendar Days of the issuance of such difference through its transmission service ratesfinal construction invoice.

Appears in 1 contract

Samples: Generator Interconnection Agreement

Final Invoice. As soon as reasonably practicable, but within twelve months after completion of the construction of the Participating TO’s TO s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO shall provide an invoice of the final cost of the construction of the Participating TO’s TO s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with the Participating TO’s TO s Interconnection Facilities and Distribution Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; or, in the event the actual costs of construction exceed the Interconnection Customer’s Customer s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s Customer s percentage share of those costs, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the Participating TO shall recover such difference through its transmission service rates.thirty

Appears in 1 contract

Samples: Large Generator Interconnection Agreement

Final Invoice. As soon as reasonably practicable, but within twelve months after completion of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO shall provide an invoice of the final cost of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with the Participating TO’s Interconnection Facilities and Distribution Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; or, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the Participating TO shall recover such difference through its transmission service rates.. LARGE GENERATOR INTERCONNECTION AGREEMENT

Appears in 1 contract

Samples: Large Generator Interconnection Agreement

Final Invoice. As soon as reasonably practicable, but within twelve months after completion of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, the Participating TO shall provide an invoice of the final cost of the construction of the Participating TO’s Interconnection Facilities, Network Upgrades, and Distribution Upgrades, and shall set forth such costs in sufficient detail to enable the Interconnection Customer to compare the actual costs with the estimates and to ascertain deviations, if any, from the cost estimates. With respect to costs associated with the Participating TO’s Interconnection Facilities and Distribution Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction within thirty (30) Calendar Days of the issuance of such final construction invoice; or, in the event the actual costs of construction exceed the Interconnection Customer’s actual payment for estimated costs, then the Interconnection Customer shall pay to the Participating TO any amount by which the actual costs of construction exceed the actual payment by the Interconnection Customer for estimated costs within thirty (30) Calendar Days of the issuance of such final construction invoice. With respect to costs associated with Network Upgrades, the Participating TO shall refund to the Interconnection Customer any amount by which the actual payment by the Interconnection Customer for estimated costs exceeds the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs, as set forth in Appendix G to this LGIA within thirty (30) Calendar Days of the issuance of such final construction invoice. In the event the actual costs of construction multiplied by the Interconnection Customer’s percentage share of those costs exceed the Interconnection Customer’s actual payment for estimated costs, then the Participating TO shall recover such difference through its transmission service rates.those

Appears in 1 contract

Samples: Large Generator Interconnection Agreement

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!