Problem Statement School bus fleets are aging, and our communities have poor air quality. Replacing school buses with zero emission school buses will address both of these issues.
Annual Operating Budget and Financial Projections Within sixty (60) days after the end of each fiscal year of Borrower Representative (and promptly and within five (5) days of any material modification thereto), an annual operating budgets, on a consolidating basis (including income statements, balance sheets and cash flow statements, by month) for the upcoming fiscal year of Borrower Representative, as approved by Borrower Representative’s Board, together with any related business forecasts used in the preparation of such annual financial projections.
Annual Projections As soon as practicable and in any event prior to the beginning of each Fiscal Year, Borrowers shall deliver to Lender projected balance sheets, statements of income and cash flow for Borrowers on a consolidated and consolidating basis, for each of the twelve (12) months during such Fiscal Year, which shall include the assumptions used therein, together with appropriate supporting details as reasonably requested by Lender.
Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-xxxxx-xxxxxxx-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-xxxxx-xxxxxxx-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.
Project Specific Milestones In addition to the milestones stated in Section 212.5 of the Tariff, as applicable, during the term of this ISA, Interconnection Customer shall ensure that it meets each of the following development milestones: 6.1 Substantial Site work completed. On or before December 31, 2020 Interconnection Customer must demonstrate completion of at least 20% of project site construction. At this time, Interconnection Customer must submit to Interconnected Transmission Owner and Transmission Provider initial drawings, certified by a professional engineer, of the Customer Interconnection Facilities. 6.2 Delivery of major electrical equipment. On or before December 31, 2021, Interconnection Customer must demonstrate that all generating units have been delivered to Interconnection Customer’s project site.
Production Report and Lease Operating Statements Within 60 days after the end of each fiscal quarter, a report setting forth, for each calendar month during the then current fiscal year to date, the volume of production and sales attributable to production (and the prices at which such sales were made and the revenues derived from such sales) for each such calendar month from the Oil and Gas Properties, and setting forth the related ad valorem, severance and production taxes and lease operating expenses attributable thereto and incurred for each such calendar month.
Budget Consulting Engineer/Architect shall advise City if, in its opinion, the amount budgeted for construction is not sufficient to adequately design and construct the improvement as requested.
ODUF Packing Specifications 6.3.1 A pack will contain a minimum of one message record or a maximum of 99,999 message records plus a pack header record and a pack trailer record. One transmission can contain a maximum of 99 packs and a minimum of one pack.
LEAD WARNING STATEMENT Housing built before 1978 may contain lead-based paint. Lead from paint, paint chips and dust pose health hazards if not managed properly. Lead exposure is especially harmful to young children and pregnant women. Before renting pre-1978 housing, OWNERS must disclose the presence of known lead-based paint hazards in the dwelling. RESIDENTS must also receive a federally approved pamphlet on lead poisoning prevention.
Business Plan The Lenders shall have received a satisfactory business plan for fiscal years 1999-2006 and a satisfactory written analysis of the business and prospects of the Borrower and its Subsidiaries for the period from the Closing Date through the final maturity of the Term Loans.