Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria
FREQUENCY AND CAPACITY LEVELS 7 frequencies per week, with no restrictions to capacity and aircraft type
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
System for Award Management (XXX) Requirement Alongside a signed copy of this Agreement, Grantee will provide Florida Housing with a XXX.xxx proof of registration and Commercial and Government Entity (CAGE) number. Grantee will continue to maintain an active XXX registration with current information at all times during which it has an active award under this Agreement.
Switching System Hierarchy and Trunking Requirements For purposes of routing PNG traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to PNG, the subtending arrangements between PNG Tandem Switches and PNG End Office Switches shall be the same as the Tandem/End Office subtending arrangements that PNG maintains for the routing of its own or other carriers’ traffic.
Switching and Tagging Rules The Developer and Connecting Transmission Owner shall each provide the other Party a copy of its switching and tagging rules that are applicable to the other Party’s activities. Such switching and tagging rules shall be developed on a nondiscriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.
Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.
Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.
Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.
WORKPLACE FLEXIBILITY The employer must ensure that any Individual Flexibility Agreement (IFA) is genuinely agreed to by the employer and the employee and result in the employee being better off overall at the time the IFA is made than the employee would have been if no IFA had been agreed to. 8.1 Notwithstanding any other provision of the Agreement, the employer and an individual employee may agree to vary the application of certain terms of the Agreement to meet the genuine individual needs of the employer and the individual employee. The terms the employer and the individual employee may agree to vary are the application of those permitted under Section 172 of the FW Act, and relates only to:- 8.1.1 arrangements for when work is performed; 8.1.2 salary sacrifice arrangements; 8.1.3 reduction in ordinary hours; and 8.1.4 are not unlawful terms under Section 194 of the FW Act. 8.2 The employer and the individual employee must have genuinely made the IFA without coercion or duress. An IFA can only be entered into after the individual employee has commenced employment with the employer. 8.3 The IFA between the employer and the individual employee must: 8.3.1 be confined to a variation in the application of one or more of the terms listed in Clause 8.1; and 8.4 The IFA between the employer and the individual employee must also: 8.4.1 be in writing, name the parties to the IFA and be signed by the employer and the individual employee and, if the employee is under eighteen (18) years of age, the employee’s parent or guardian; 8.4.2 state each term of the Agreement that the employer and the individual employee have agreed to vary; 8.4.3 detail how the application of each term has been varied by agreement between the employer and the individual employee;