High Voltage in the context of tariff classification means a supply voltage exceeding the Medium Voltage.
High Voltage. 15.01 When working on live circuits carrying 750 rated volts or more, at least two workers must be assigned to perform the work, one of whom shall be an experienced journeyman, the other to be an employee who is a competent worker in the opinion of the employee in charge of the work. The Superintendent is not to be considered a journeyman.
15.02 Outdoor work on primary distribution involving rubber gloves shall not be carried out when the ambient temperature exceeds -25 degrees Fahrenheit or -35 degrees Fahrenheit wind chill, except in an emergency.
High Voltage. As defined by the Alberta Electrical Utility Code.
High Voltage. When Iron Workers are employed around high voltage, OSHA requirements will be adhered to.
High Voltage. When Iron Workers are employed around high voltage on crane hot rails the power shall be disconnected to a minimum distance of fifty (50) feet from the nearest Iron Worker. Safety lights to be strung across bay, and safety dogs secured to crane rails until completion of work. Paragraph Y. Floats shall be 3-1/2 feet x 6 feet x ¾ inch marine or exterior plywood reinforced with two by fours with a 1 inch manila line (or hemp) with a 1 inch board on edge to hold material and tools from dropping off said float. (See diagram on page 74)
High Voltage. An employee assigned to and working at the Airport Division will
24 D.2.1 An employee assigned to the Airport shall not be eligible for lead pay.
High Voltage. 4.37.1 The Contractor will maintain the high voltage equipment systems to achieve continuity of operation and maintain essential services. Site based High Voltage Authorised Person is to form part of the contractors team.
4.37.2 High voltage equipment consists of transformers, switchgear, protective devices and cabling.
4.37.3 The Contractor will have day to day responsibility for the management, operation, organisation and compliance with all relevant legislation, standards or codes of practice applicable to each part of the Services including but not limited to those set out in this Specification.
4.37.4 There will be close liaison maintained with the energy supplier.
4.37.5 Appropriate Permit to Work records will be maintained to indicate that control of work, testing and inspections have taken place, with repairs and other remedial action details noted.
4.37.6 Only Approved Persons shall be permitted to work on electrical installations.
4.37.7 High voltage equipment is only to be accessible and operated by the engineers authorised for that purpose.
High Voltage. An employee assigned to and working at the Airport Division will
High Voltage. When Iron Workers are employed around high voltage on crane hot rails, the power shall be disconnected to a minimum distance of fifty (50) feet from the nearest Iron Worker. Safety lights will identify the work area and safety dogs secured to crane rails until completion of work.
High Voltage a. Dead-front termination:
1) Universal bushing xxxxx and bushing well inserts rated 15 kV in accordance with IEEE 386.
2) Bushings externally clamped and front removable.
3) Rated for 200 amperes continuous.
4) Standoff brackets located to bushings.
5) Terminations arranged for loop feed.