FUNDING/CONSIDERATION/INVOICING. A. As consideration for the satisfactory completion of services rendered by the Grantee under the terms of this Agreement, the Department shall pay the Grantee on a cost reimbursement basis up to a maximum of $450,000. It is understood that any additional funds necessary for the completion of this project are the responsibility of the Grantee. The parties hereto understand and agree that this Agreement does not require a match on the part of the Grantee. B. Prior written approval from the Department’s Grant Manager shall be required for changes to this Agreement. i. A Change Order to this Agreement is required when task timelines within the current authorized Agreement period change, and/or when the cumulative transfer of funds between approved budget categories, as defined in Attachment A, are less than ten percent (10%) of the total budget as last approved by the Department. All Change Orders are subject to the mutual agreement of both parties as evidenced in writing. ii. A formal Amendment to this Agreement is required for changes which cause any of the following: an increase or decrease in the Agreement funding amount, a change in the Grantee’s match requirements, a change in the expiration date of the Agreement, and/or changes to the cumulative amount of funding transfers between approved budget categories, as defined in Attachment A, exceeds or is expected to exceed ten percent (10%) of the total budget as last approved by the Department. All Amendments are subject to the mutual agreement of both parties as evidenced in writing. C. The Grantee shall be reimbursed on a cost reimbursement basis for all eligible project costs upon the completion, submittal and approval of each deliverable identified in Attachment A, in accordance with the schedule therein. Reimbursement shall be requested utilizing Attachment B, Payment Request Summary Form. To be eligible for reimbursement, costs must be in compliance with laws, rules and regulations applicable to expenditures of State funds, including, but not limited to, the Reference Guide for State Expenditures, which can be accessed at the following web address: xxxx://xxx.xxxxxxxxxxxx.xxx/aadir/reference_guide/. All invoices for amounts due under this Agreement shall be submitted in detail sufficient for a proper pre-audit and post-audit thereof. A final payment request should be submitted to the Department no later than sixty (60) calendar days following the completion date of the Agreement, to assure the availability of funds for payment. All work performed pursuant to Attachment A must be performed on or before the completion date of the Agreement, and the subsequent sixty-day period merely allows the Grantee to finalize invoices and backup documentation to support the final payment request. D. The State Chief Financial Officer requires detailed supporting documentation of all costs under a cost reimbursement agreement. The Grantee shall comply with the minimum requirements set forth in Attachment C, Contract Payment Requirements. The Payment Request Summary Form shall be accompanied by supporting documentation and other requirements as follows for each deliverable: Reimbursement shall be limited to the following budget categories: i. Contractual (Subcontractors) – Reimbursement requests for payments to subcontractors must be substantiated by copies of invoices with backup documentation identical to that required from the Grantee. Subcontracts which involve payments for direct salaries shall clearly identify the personnel involved, salary rate per hour, and hours spent on the project. All multipliers used (i.e., fringe benefits, overhead, indirect, and/or general and administrative rates) shall be supported by audit. If the Department determines that multipliers charged by any subcontractor exceeded the rates supported by audit, the Grantee shall be required to reimburse such funds to the Department within thirty (30) calendar days of written notification. Interest on the excessive charges shall be calculated based on the prevailing rate used by the State Board of Administration. Subcontracts, which involve equipment purchases as part of an installation/retrofit or that include infrastructure and/or infrastructure improvements, as defined in Florida Chief Financial Officer (CFO) Memorandum No. 5 (2011-2012), must be capitalized in accordance with Chapter 69I-72, Florida Administrative Code (F.A.C.). The Grantee shall be responsible for maintaining appropriate property records for any subcontracts that include the purchase of equipment as part of the delivery of services. The Grantee shall comply with this requirement and ensure its subcontracts issued under this Agreement, if any, impose this requirement, in writing, on its subcontractors. For fixed-price (vendor) subcontracts, the following provisions shall apply: a. The Grantee may award, on a competitive basis, fixed-price subcontracts to consultants/contractors in performing the work described in Attachment A. Invoices submitted to the Department for fixed-price subcontracted activities shall be supported with a copy of the subcontractor’s invoice and a copy of the tabulation form for the competitive procurement process (i.e., Invitation to Bid or Request for Proposals) resulting in the fixed-price subcontract. b. The Grantee may request approval from the Department to award a fixed-price subcontract resulting from procurement methods other than those identified in the paragraph above. In this instance, the Grantee shall request the advance written approval from the Department’s Grant Manager of the fixed price negotiated by the Grantee. The letter of request shall be supported by a detailed budget and Scope of Services to be performed by the subcontractor. Upon receipt of the Department Grant Manager’s approval of the fixed-price amount, the Grantee may proceed in finalizing the fixed-price subcontract. c. All subcontracts are subject to the provisions of paragraph 12 and any other appropriate provisions of this Agreement which affect subcontracting activities. E. In addition to the invoicing requirements contained in paragraphs 3.C. and D. above, the Department will periodically request proof of a transaction (invoice, payroll register, etc.) to evaluate the appropriateness of costs to the Agreement pursuant to State and Federal guidelines (including cost allocation guidelines), as appropriate. This information, when requested, must be provided within thirty (30) calendar days of such request. The Grantee may also be required to submit a cost allocation plan to the Department in support of its multipliers (overhead, indirect, general administrative costs, and fringe benefits). State guidelines for allowable costs can be found in the Department of Financial Services’ Reference Guide for State Expenditures at xxxx://xxx.xxxxxxxxxxxx.xxx/aadir/reference_guide/. i. The accounting systems for all Grantees must ensure that these funds are not commingled with funds from other agencies. Funds from each agency must be accounted for separately. Grantees are prohibited from commingling funds on either a program-by-program or a project-by-project basis. Funds specifically budgeted and/or received for one project may not be used to support another project. Where a Grantee's, or subrecipient's, accounting system cannot comply with this requirement, the Grantee, or subrecipient, shall establish a system to provide adequate fund accountability for each project it has been awarded. ii. If the Department finds that these funds have been commingled, the Department shall have the right to demand a refund, either in whole or in part, of the funds provided to the Grantee under this Agreement for non-compliance with the material terms of this Agreement. The Grantee, upon such written notification from the Department shall refund, and shall forthwith pay to the Department, the amount of money demanded by the Department. Interest on any refund shall be calculated based on the prevailing rate used by the State Board of Administration. Interest shall be calculated from the date(s) the original payment(s) are received from the Department by the Grantee to the date repayment is made by the Grantee to the Department. iii. In the event that the Grantee recovers costs, incurred under this Agreement and reimbursed by the Department, from another source(s), the Grantee shall reimburse the Department for all recovered funds originally provided under this Agreement. Interest on any refund shall be calculated based on the prevailing rate used by the State Board of Administration. Interest shall be calculated from the date(s) the payment(s) are recovered by the Grantee to the date repayment is made to the Department by the Grantee.
Appears in 2 contracts
Samples: Standard Project Agreement, Grant Agreement
FUNDING/CONSIDERATION/INVOICING. A. As consideration for the satisfactory completion of services rendered by the Grantee under the terms of this Agreement, the Department shall pay the Grantee on a cost reimbursement basis up to a maximum of $450,000750,000. It is understood that any additional funds necessary for the completion of this project are the responsibility of the Grantee. The parties hereto understand and agree that this Agreement does not require a match on the part of the Grantee.
B. Prior written approval from the Department’s Grant Manager shall be required for changes to this Agreement.
i. A . Changes to approved budget categories within a single deliverable that are less than 10% of the total approved deliverable budget amount will require a formal Change Order to this Agreement is required when task timelines within the current authorized Agreement period change, and/or when the cumulative transfer of funds between approved budget categories, as defined in Attachment A, Agreement. Changes that are less than ten percent (10%) % or greater of the total approved deliverable budget as last approved by amount, or changes that transfer funds from one deliverable to another deliverable, or changes that increase or decrease the Department. All Change Orders are subject to the mutual agreement of both parties as evidenced in writing.
ii. A project’s total funding amount will require a formal Amendment to this Agreement is required for changes which cause any of the following: an increase or decrease in the Agreement funding amount, a change in the Grantee’s match requirements, a change in the expiration date of the Agreement, and/or changes to the cumulative amount of funding transfers between approved budget categories, as defined in Attachment A, exceeds or is expected to exceed ten percent (10%) of the total budget as last approved by the Department. All Amendments are subject to the mutual agreement of both parties as evidenced in writing.
C. The Grantee shall be reimbursed on a cost reimbursement basis for all eligible project costs upon the completion, submittal and approval of each deliverable identified in Attachment A, in accordance with the schedule therein. Reimbursement shall be requested utilizing Attachment B, Payment Request Summary Form. To be eligible for reimbursement, costs must be in compliance with laws, rules and regulations applicable to expenditures of State funds, including, but not limited to, the Reference Guide for State Expenditures, which can be accessed at the following web address: xxxx://xxx.xxxxxxxxxxxx.xxx/aadir/reference_guide/. All invoices for amounts due under this Agreement shall be submitted in detail sufficient for a proper pre-audit and post-audit thereof. A final payment request should be submitted to the Department no later than sixty (60) calendar days following the completion date of the Agreement, to assure the availability of funds for payment. All work performed pursuant to Attachment A must be performed on or before the completion date of the Agreement, and the subsequent sixty-day period merely allows the Grantee to finalize invoices and backup documentation to support the final payment request.
D. The State Chief Financial Officer requires detailed supporting documentation of all costs under a cost reimbursement agreement. The Grantee shall comply with the minimum requirements set forth in Attachment C, Contract Payment Requirements. The Payment Request Summary Form shall be accompanied by supporting documentation and other requirements as follows for each deliverable: Reimbursement shall be limited to the following budget categories:
i. Contractual (Subcontractors) – Reimbursement requests for payments to subcontractors must be substantiated by copies of invoices with backup documentation identical to that required from the Grantee. Subcontracts which involve payments for direct salaries shall clearly identify the personnel involved, salary rate per hour, and hours spent on the project. All multipliers used (i.e., fringe benefits, overhead, indirect, and/or general and administrative rates) shall be supported by audit. If the Department determines that multipliers charged by any subcontractor exceeded the rates supported by audit, the Grantee shall be required to reimburse such funds to the Department within thirty (30) calendar days of written notification. Interest on the excessive charges shall be calculated based on the prevailing rate used by the State Board of Administration. Subcontracts, which involve equipment purchases as part of an installation/retrofit or that include infrastructure and/or infrastructure improvements, as defined in Florida Chief Financial Officer (CFO) Memorandum No. 5 (2011-2012), must be capitalized in accordance with Chapter 69I-72, Florida Administrative Code (F.A.C.). The Grantee shall be responsible for maintaining appropriate property records for any subcontracts that include the purchase of equipment as part of the delivery of services. The Grantee shall comply with this requirement and ensure its subcontracts issued under this Agreement, if any, impose this requirement, in writing, on its subcontractors. For fixed-price (vendor) subcontracts, the following provisions shall apply:
a. The Grantee may award, on a competitive basis, fixed-price subcontracts to consultants/contractors in performing the work described in Attachment A. Invoices submitted to the Department for fixed-price subcontracted activities shall be supported with a copy of the subcontractor’s invoice and a copy of the tabulation form for the competitive procurement process (i.e., Invitation to Bid or Request for Proposals) resulting in the fixed-price subcontract.
b. The Grantee may request approval from the Department to award a fixed-price subcontract resulting from procurement methods other than those identified in the paragraph above. In this instance, the Grantee shall request the advance written approval from the Department’s Grant Manager of the fixed price negotiated by the Grantee. The letter of request shall be supported by a detailed budget and Scope of Services to be performed by the subcontractor. Upon receipt of the Department Grant Manager’s approval of the fixed-price amount, the Grantee may proceed in finalizing the fixed-fixed- price subcontract.
c. All subcontracts are subject to the provisions of paragraph 12 and any other appropriate provisions of this Agreement which affect subcontracting activities.
E. In addition to the invoicing requirements contained in paragraphs 3.C. and D. above, the Department will periodically request proof of a transaction (invoice, payroll register, etc.) to evaluate the appropriateness of costs to the Agreement pursuant to State and Federal guidelines (including cost allocation guidelines), as appropriate. This information, when requested, must be provided within thirty (30) calendar days of such request. The Grantee may also be required to submit a cost allocation plan to the Department in support of its multipliers (overhead, indirect, general administrative costs, and fringe benefits). State guidelines for allowable costs can be found in the Department of Financial Services’ Reference Guide for State Expenditures at xxxx://xxx.xxxxxxxxxxxx.xxx/aadir/reference_guide/.
i. The accounting systems for all Grantees must ensure that these funds are not commingled with funds from other agencies. Funds from each agency must be accounted for separately. Grantees are prohibited from commingling funds on either a program-by-program or a project-by-project basis. Funds specifically budgeted and/or received for one project may not be used to support another project. Where a Grantee's, or subrecipient's, accounting system cannot comply with this requirement, the Grantee, or subrecipient, shall establish a system to provide adequate fund accountability for each project it has been awarded.
ii. If the Department finds that these funds have been commingled, the Department shall have the right to demand a refund, either in whole or in part, of the funds provided to the Grantee under this Agreement for non-non- compliance with the material terms of this Agreement. The Grantee, upon such written notification from the Department shall refund, and shall forthwith pay to the Department, the amount of money demanded by the Department. Interest on any refund shall be calculated based on the prevailing rate used by the State Board of Administration. Interest shall be calculated from the date(s) the original payment(s) are received from the Department by the Grantee to the date repayment is made by the Grantee to the Department.
iii. In the event that the Grantee recovers costs, incurred under this Agreement and reimbursed by the Department, from another source(s), the Grantee shall reimburse the Department for all recovered funds originally provided under this Agreement. Interest on any refund shall be calculated based on the prevailing rate used by the State Board of Administration. Interest shall be calculated from the date(s) the payment(s) are recovered by the Grantee to the date repayment is made to the Department by the Grantee.
Appears in 1 contract
Samples: Grant Agreement
FUNDING/CONSIDERATION/INVOICING. A. As consideration for the satisfactory completion of services rendered by the Grantee under the terms of this Agreement, the Department shall pay the Grantee on a cost reimbursement basis up to a maximum of $450,000250,000. It is understood that any additional funds necessary for the completion of this project are the responsibility of the Grantee. The parties hereto understand and agree that this Agreement does not require a match on the part of the Grantee.
B. Prior written approval from the Department’s Grant Manager shall be required for changes to this Agreement.
i. A Change Order to this Agreement is required when task timelines within the current authorized Agreement period change, and/or when the cumulative transfer of funds between approved budget categories, as defined in Attachment A, are less than ten percent (10%) of the total budget as last approved by the Department. All Change Orders are subject to the mutual agreement of both parties as evidenced in writing.
ii. A formal Amendment to this Agreement is required for changes which cause any of the following: an increase or decrease in the Agreement funding amount, a change in the Grantee’s match requirements, a change in the expiration date of the Agreement, and/or changes to the cumulative amount of funding transfers between approved budget categories, as defined in Attachment A, exceeds or is expected to exceed ten percent (10%) of the total budget as last approved by the Department. All Amendments are subject to the mutual agreement of both parties as evidenced in writing.
C. The Grantee shall be reimbursed on a cost reimbursement basis for all eligible project costs upon the completion, submittal and approval of each deliverable identified in Attachment A, in accordance with the schedule therein. Reimbursement shall be requested utilizing Attachment B, Payment Request Summary Form. To be eligible for reimbursement, costs must be in compliance with laws, rules and regulations applicable to expenditures of State funds, including, but not limited to, the Reference Guide for State Expenditures, which can be accessed at the following web address: xxxx://xxx.xxxxxxxxxxxx.xxx/aadir/reference_guide/. All invoices for amounts due under this Agreement shall be submitted in detail sufficient for a proper pre-audit and post-audit thereof. A final payment request should be submitted to the Department no later than sixty (60) calendar days following the completion date of the Agreement, to assure the availability of funds for payment. All work performed pursuant to Attachment A must be performed on or before the completion date of the Agreement, and the subsequent sixty-day period merely allows the Grantee to finalize invoices and backup documentation to support the final payment request.
D. The State Chief Financial Officer requires detailed supporting documentation of all costs under a cost reimbursement agreement. The Grantee shall comply with the minimum requirements set forth in Attachment C, Contract Payment Requirements. The Payment Request Summary Form shall be accompanied by supporting documentation and other requirements as follows for each deliverable: Reimbursement shall be limited to the following budget categories:
i. Contractual (Subcontractors) – Reimbursement requests for payments to subcontractors must be substantiated by copies of invoices with backup documentation identical to that required from the Grantee. Subcontracts which involve payments for direct salaries shall clearly identify the personnel involved, salary rate per hour, and hours spent on the project. All multipliers used (i.e., fringe benefits, overhead, indirect, and/or general and administrative rates) shall be supported by audit. If the Department determines that multipliers charged by any subcontractor exceeded the rates supported by audit, the Grantee shall be required to reimburse such funds to the Department within thirty (30) calendar days of written notification. Interest on the excessive charges shall be calculated based on the prevailing rate used by the State Board of Administration. Subcontracts, which involve equipment purchases as part of an installation/retrofit or that include infrastructure and/or infrastructure improvements, as defined in Florida Chief Financial Officer (CFO) Memorandum No. 5 (2011-2012), must be capitalized in accordance with Chapter 69I-72, Florida Administrative Code (F.A.C.). The Grantee shall be responsible for maintaining appropriate property records for any subcontracts that include the purchase of equipment as part of the delivery of services. The Grantee shall comply with this requirement and ensure its subcontracts issued under this Agreement, if any, impose this requirement, in writing, on its subcontractors. For fixed-price (vendor) subcontracts, the following provisions shall apply:
a. The Grantee may award, on a competitive basis, fixed-price subcontracts to consultants/contractors in performing the work described in Attachment A. Invoices submitted to the Department for fixed-price subcontracted activities shall be supported with a copy of the subcontractor’s invoice and a copy of the tabulation form for the competitive procurement process (i.e., Invitation to Bid or Request for Proposals) resulting in the fixed-price subcontract.
b. The Grantee may request approval from the Department to award a fixed-price subcontract resulting from procurement methods other than those identified in the paragraph above. In this instance, the Grantee shall request the advance written approval from the Department’s Grant Manager of the fixed price negotiated by the Grantee. The letter of request shall be supported by a detailed budget and Scope of Services to be performed by the subcontractor. Upon receipt of the Department Grant Manager’s approval of the fixed-price amount, the Grantee may proceed in finalizing the fixed-price subcontract.
c. All subcontracts are subject to the provisions of paragraph 12 and any other appropriate provisions of this Agreement which affect subcontracting activities.
E. In addition to the invoicing requirements contained in paragraphs 3.C. and D. above, the Department will periodically request proof of a transaction (invoice, payroll register, etc.) to evaluate the appropriateness of costs to the Agreement pursuant to State and Federal guidelines (including cost allocation guidelines), as appropriate. This information, when requested, must be provided within thirty (30) calendar days of such request. The Grantee may also be required to submit a cost allocation plan to the Department in support of its multipliers (overhead, indirect, general administrative costs, and fringe benefits). State guidelines for allowable costs can be found in the Department of Financial Services’ Reference Guide for State Expenditures at xxxx://xxx.xxxxxxxxxxxx.xxx/aadir/reference_guide/.
i. The accounting systems for all Grantees must ensure that these funds are not commingled with funds from other agencies. Funds from each agency must be accounted for separately. Grantees are prohibited from commingling funds on either a program-by-program or a project-by-project basis. Funds specifically budgeted and/or received for one project may not be used to support another project. Where a Grantee's, or subrecipient's, accounting system cannot comply with this requirement, the Grantee, or subrecipient, shall establish a system to provide adequate fund accountability for each project it has been awarded.
ii. If the Department finds that these funds have been commingled, the Department shall have the right to demand a refund, either in whole or in part, of the funds provided to the Grantee under this Agreement for non-compliance with the material terms of this Agreement. The Grantee, upon such written notification from the Department shall refund, and shall forthwith pay to the Department, the amount of money demanded by the Department. Interest on any refund shall be calculated based on the prevailing rate used by the State Board of Administration. Interest shall be calculated from the date(s) the original payment(s) are received from the Department by the Grantee to the date repayment is made by the Grantee to the Department.
iii. In the event that the Grantee recovers costs, incurred under this Agreement and reimbursed by the Department, from another source(s), the Grantee shall reimburse the Department for all recovered funds originally provided under this Agreement. Interest on any refund shall be calculated based on the prevailing rate used by the State Board of Administration. Interest shall be calculated from the date(s) the payment(s) are recovered by the Grantee to the date repayment is made to the Department by the Grantee.
Appears in 1 contract