Common use of Gas Measurement for Fuel Gas Clause in Contracts

Gas Measurement for Fuel Gas. The onboard gas measurement system of the FSRU shall be used to measure the Internal Use for the FSRU. Each consumer has volume flow or mass-flow measurement installed. The energy content for the flow will be estimated and corresponding mass flow will be calculated based on the assumptions in Table 1 of Schedule 9 (Internal Use Limit). Flow accuracy of gas flow meters to the consumers are within plus or minus three percent (+/-3%). The Gas flow meters are calibrated from newbuilding shipyard and will be validated and verified by a third party company within two (2) months after the date on which the certificate of acceptance of the FSRU has been signed by Operator and the FSRU Owner. SCHEDULE 4 GAS NOMINATION PROCEDURES Time required to cool down a spare booster pump/train, including preparation time is twelve plus two (12+2) hours. In case a standby train is maintained in cold condition, time required to bring a cold train to service is one (1) hour.

Appears in 5 contracts

Samples: Terminal User Agreement, Terminal User Agreement, Terminal Use Agreement

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.