Goods. 5.1 The Contractor shall ensure that: 5.1.1 the Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and 5.1.2 the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority. 5.2 The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle. 5.3 Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery. 5.4 Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract for non-delivery. 5.5 The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either: 5.5.1 have the Goods either repaired by the Contractor or replaced by the Contractor; or 5.5.2 treat the Contract as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made. 5.6 The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract or other reference number, appropriate weights and the identity of the contents.
Appears in 36 contracts
Samples: Contract for the Provision of Building Services, Agreement, Commercial Agreement
Goods. 5.1 5.1. The Contractor shall ensure that:
5.1.1 5.1.1. the Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and
5.1.2 5.1.2. the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.
5.2 5.2. The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle.
5.3 5.3. Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery.
5.4 5.4. Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract for non-non- delivery.
5.5 5.5. The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either:
5.5.1 5.5.1. have the Goods either repaired by the Contractor or replaced by the Contractor; or
5.5.2 5.5.2. treat the Contract as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made.
5.6 5.6. The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract or other reference number, appropriate weights and the identity of the contents.
Appears in 17 contracts
Samples: Facilities Management Agreement, Facilities Management Agreement, Professional Services
Goods. 5.1 The Contractor shall ensure that:
5.1.1 the : the Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and
5.1.2 and the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.
5.2 The . The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle.
5.3 . Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery.
5.4 . Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract for non-delivery.
5.5 . The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either:
5.5.1 have : have the Goods either repaired by the Contractor or replaced by the Contractor; or
5.5.2 or treat the Contract as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made.
5.6 The . The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract or other reference number, appropriate weights and the identity of the contents.
Appears in 12 contracts
Samples: Commercial Agreement, Supply of Veterinary Services Agreement, Purchase Agreement
Goods. 5.1 The Contractor shall ensure that:
5.1.1 the The Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and
5.1.2 the The Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.
5.2 The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle.
5.3 Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery.
5.4 Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract for non-delivery.
5.5 The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either:
5.5.1 have Have the Goods either repaired by the Contractor or replaced by the Contractor; or
5.5.2 treat Treat the Contract as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made.
5.6 The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract or other reference number, appropriate weights and the identity of the contents.
Appears in 7 contracts
Samples: Taxi Services Agreement, Taxi Services Agreement, Taxi Services Agreement
Goods. 5.1 5.1. The Contractor shall ensure that:
5.1.1 5.1.1. the Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and
5.1.2 5.1.2. the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.
5.2 5.2. The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle.
5.3 5.3. Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery.
5.4 5.4. Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract for non-delivery.
5.5 5.5. The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either:
5.5.1 5.5.1. have the Goods either repaired by the Contractor or replaced by the Contractor; or
5.5.2 5.5.2. treat the Contract as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made.
5.6 5.6. The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract or other reference number, appropriate weights and the identity of the contents.
Appears in 6 contracts
Samples: Provision of Equipment for Physiotherapy Training and Rehabilitation, Contract, Contract
Goods. 5.1 The Contractor shall ensure that:
5.1.1 the : the Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and
5.1.2 and the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.
5.2 The . The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle.
5.3 . Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery.
5.4 . Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract for non-delivery.
5.5 . The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either:
5.5.1 have : have the Goods either repaired by the Contractor or replaced by the Contractor; or
5.5.2 or treat the Contract as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made.
5.6 The . The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract or other reference number, appropriate weights and the identity of the contents.
Appears in 6 contracts
Samples: General Agreement, Supply and Installation Agreement, Supply and Installation Agreement
Goods. 5.1 The Contractor shall ensure that:
5.1.1 the : the Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and
5.1.2 and the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.
5.2 The . The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle.
5.3 . Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery.
5.4 . Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract for non-delivery.
5.5 . The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either:
5.5.1 have : have the Goods either repaired by the Contractor or replaced by the Contractor; or
5.5.2 or treat the Contract as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made.
5.6 The . The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract or other reference number, appropriate weights and the identity of the contents.
Appears in 2 contracts
Samples: Driver Services Agreement, Supply Agreement
Goods. 5.1 5.1. The Contractor shall ensure that:: Refurbishment of Dental Surgery HMPS Wayland – 1422-1-Clinical/Medical-MID_RFP
5.1.1 5.1.1. the Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and
5.1.2 5.1.2. the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.
5.2 5.2. The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle.
5.3 5.3. Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery.
5.4 5.4. Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract for non-delivery.
5.5 5.5. The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either:
5.5.1 5.5.1. have the Goods either repaired by the Contractor or replaced by the Contractor; or
5.5.2 5.5.2. treat the Contract as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made.
5.6 5.6. The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract or other reference number, appropriate weights and the identity of the contents.. Refurbishment of Dental Surgery HMPS Wayland – 1422-1-Clinical/Medical-MID_RFP
Appears in 1 contract
Samples: Contract
Goods. 5.1 5.1. The Contractor shall ensure that:
5.1.1 5.1.1. the Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and
5.1.2 5.1.2. the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.
5.2 5.2. The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle.
5.3 5.3. Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery.
5.4 5.4. Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract for non-non- delivery.
5.5 5.5. The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time one (1) month after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either:
5.5.1 5.5.1. have the Goods either repaired by the Contractor or replaced by the Contractor; or
5.5.2 5.5.2. treat the Contract as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made.
5.6 5.6. The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract or other reference number, appropriate weights number and the identity of the contents.
Appears in 1 contract
Samples: Provision of Legacy Custodial Locking Parts and Components
Goods. 5.1 The Contractor shall ensure that:
5.1.1 the : the Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and
5.1.2 and the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.
5.2 The . The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle.
5.3 . Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery.
5.4 . Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract Framework Agreement for non-delivery.
5.5 . The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either:
5.5.1 have : have the Goods either repaired by the Contractor or replaced by the Contractor; or
5.5.2 or treat the Contract Framework Agreement as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made.
5.6 The . The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract Framework Agreement or other reference number, appropriate weights and the identity of the contents.
Appears in 1 contract
Samples: Framework Agreement
Goods. 5.1 The Contractor shall ensure that:
5.1.1 : the Goods conform in all respects with the Specification and, where applicable, with any sample approved by the Authority; and
5.1.2 and the Goods are free from defects in design, materials and workmanship and are fit and sufficient for all the purposes for which such Goods are ordinarily used and for any particular purpose made known to the Contractor by the Authority.
5.2 . The Goods shall be delivered when they have been taken to the address specified in the Specification, unloaded and accepted by the Authority. Where the Goods are collected by the Authority, the point of delivery shall be when the Goods are loaded on the Authority’s vehicle.
5.3 . Ownership of and risk in the Goods shall, without prejudice to any other rights or remedies of the Authority pass to the Authority at the time of delivery.
5.4 . Where the Goods are not delivered to the Authority on the due date for delivery, the Authority shall within ten (10) Working Days of the due date, give notice to the Contractor that the Goods have not been delivered and may either: request the Contractor free of charge to deliver substitute Goods within the timescales specified by the Authority or terminate the Contract for non-delivery.
5.5 . The Authority may by written notice to the Contractor reject any of the Goods which fail to conform to the approved sample or fail to meet Schedule B: Specification. Such notice shall be given within a reasonable time after delivery to the Authority of such Goods. If the Authority rejects any of the Goods pursuant to this clause the Authority may (without prejudice to other rights and remedies) either:
5.5.1 have : have the Goods either repaired by the Contractor or replaced by the Contractor; or
5.5.2 or treat the Contract as discharged by the Contractor’s breach and obtain a refund from the Contractor for the Goods in respect of which payment has already been made.
5.6 The . The Goods shall be manufactured, stored, tested and packed in accordance with all relevant British and/or European standards applicable to them from time to time. They shall be marked with the Contract or other reference number, appropriate weights and the identity of the contents.
Appears in 1 contract
Samples: Provision of Youth Worker Services