GPA Standard 2377 Sample Clauses

GPA Standard 2377. Project Co shall determine the presence of Hydrogen Sulfide (H2S) by use of GPA Standard 2377 – Test of Hydrogen Sulfide and Carbon Dioxide in Gas Using Length of Stain Tubes. Total sulfur will be determined as the summation of sulfur compounds (i.e. mercaptans) following ASTM D1988-06 (Standard Test Method for Mercaptans in Natural Gas using Length-of-Stain Detector Tubes). If the presence of Hydrogen Sulfide or sulfur compounds is detected, an additional test shall be performed to confirm the respective concentration(s) following either: (i) ASTM D6228 (Determination of Sulfur Compounds in Natural Gas and Gaseous Fuels by Gas Chromatography and Flame Photometric Detection), (ii) ASTM D5504 (Determination of Sulfur Compounds in Natural Gas and Gaseous Fuels by Gas Chromatography and Chemiluminescence), (iii) ASTM D6667 (Determination of Total Volatile Sulfur in Gaseous Hydrocarbons and Liquefied Petroleum Gases by Ultraviolet Fluorescence), or (iv) any other testing method mutually agreed by the Parties.
AutoNDA by SimpleDocs

Related to GPA Standard 2377

  • Service Level Standards In addition to all other requirements in this Agreement, and in accordance with the Best Claims Practices & Estimating Guidelines, Vendor shall use reasonable and good faith efforts to meet the Service Level Standards set forth below.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • OMB Standards Unless specified otherwise within this agreement, the Subrecipient shall procure all materials, property, or services in accordance with the requirements of 24 CFR 84.40−48.

  • Applicable Standards The requirements and guidelines of NERC, the Applicable Regional Entity, and the Control Area in which the Customer Facility is electrically located; the PJM Manuals; and Applicable Technical Requirements and Standards.

  • REFERENCE STANDARDS A. The latest published edition of a reference shall be applicable to this Project unless identified by a specific edition date. B. All reference amendments adopted prior to the effective date of this Contract shall be applicable to this Project. C. All materials, installation and workmanship shall comply with all applicable requirements and standards. 1. Texas Medical Center Architectural Standards and Texas Medical Center Stormwater Management Design Guidelines are applicable to all Projects located within the Texas Medical Center. 2. Owner’s underwriter requirements are applicable to all Projects.

  • Design Criteria and Standards All Projects/Services shall be performed in accordance with instructions, criteria and standards set forth by the Director.

  • Safety Standards Performance of the Contract for all commodities or contractual services must comply with requirements of the Occupational Safety and Health Act and other applicable State of Florida and federal requirements.

  • Technical Standards The Generation System shall be installed and operated by the Interconnection Customer consistent with the requirements of this Agreement; the Technical Requirements; the applicable requirements located in the National Electrical Code (NEC); the applicable standards published by the American National Standards Institute (ANSI) and the Institute of Electrical and Electronic Engineers (IEEE); and local building and other applicable ordinances in effect at the time of the installation of the Generation System.

  • Accounting System Requirement The Contractor shall maintain an adequate system of accounting and internal controls that meets Generally Accepted Accounting Principles or “GAAP.”

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!