GRANULAR BASE Sample Clauses

GRANULAR BASE. Supply, place, grade, compact to specified density, 150mm deep, granular base material below proposed asphalt roadway, levelling pads and as-completed surface for sidewalks (as per Design Drawings). Prepare and maintain surface for paving. M3 100 $ $
AutoNDA by SimpleDocs
GRANULAR BASE. Supply, place, grade, compact to 98% Modified Xxxxxxx, 150mm deep granular base material below proposed paverstones. 100mm deep below curbs and concrete sidewalks (as per City of Terrace Standards) M3 70
GRANULAR BASE i) Asphalt Pathway Base Supply, place, grade, compact to specified density, 150mm deep, granular base material below proposed asphalt pathway (as per City of Terrace Standards), including paver boulevard . Prepare and maintain surface for paving. M3 465 $ $ ii) Curb/Concrete Base

Related to GRANULAR BASE

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Measurement method An isolation resistance test instrument is connected between the live parts and the electrical chassis. The isolation resistance is subsequently measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in conductively connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those components disconnected.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Salary Scale The salary scale applicable to Employees shall be set out hereinafter in the Wage Schedule.

  • Substance Abuse Testing The Parties agree that it is in the best interest of all concerned to promote a safe working environment. The Union has no objection to pre-employment substance abuse testing when required by the Employer and further, the Union has no objection to voluntary substance abuse testing to qualify for employment on projects when required by a project owner. The cost and scheduling of such testing shall be paid for and arranged by the Employer. The Union agrees to reimburse the Employer for any failed pre-access Alcohol and Drug test costs.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Salary Scales ‌ 2.5.1 Effective from 1 January 2024, and subject to the Remuneration provisions in the Terms of Settlement, a 4% increase will apply to all paid and printed rates. The following Allied Divisions shall refer to the applicable schedules for their scales: MIT, UCOL and Otago. 2.5.2 Effective from 1 January 2025, kaimahi will be translated into the following salary scale, which includes the 4% salary increase: Band Step (N/A for UCOL and TOPNZ) Scale Scale 2025 (4%) 40 hours Band Step(N/A for UCOL and TOPNZ Scale 2025 (4%) Scale 2025 (4%)

  • Non pre-priced Adjustment Factor To be applied to Work determined not to be included in the CTC but within the general scope of the work: 1.1900.

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!