GROUNDING AND BONDING. Module ground wiring splices shall be made with irreversible crimp connectors. • All exposed ground wiring must be routed above the lower surface of any structural framing. • For shade structure installations, grounding electrode conductors shall be bonded to structure columns either just below grade or below the top surface of concrete bollards.
Appears in 1 contract
GROUNDING AND BONDING. Module ground wiring splices shall be made with irreversible crimp connectors. • All exposed ground wiring must be routed above the lower surface of any structural framing. • For shade structure installations, grounding electrode conductors shall be bonded to structure columns either just below grade or below the top surface of concrete bollards.
Appears in 1 contract
Samples: Power Purchase Agreement