HADS Depression trajectory clusters Sample Clauses

HADS Depression trajectory clusters. ‌ The time course of the mean value of selected scales for each trajectory cluster are presented in Fig. I6. Based on the mean/median scores of most psychological scales, a progressive decrease in emotional wellbeing or Quality of life is evident from low to high trajectories (low- increasing-decreasing-high) at baseline. However the differences are not always statistically significant between the different pairs of trajectory clusters. HADS scales, scales that assess emotional wellbeing (namely, emotional functioning and distress thermometer), PANAS negative affect, CBI coping with cancer, CDRISC resilience, C30 global Qol and self-efficacy are among the variables that significantly differ between the ‘low’ and ‘high’ trajectories from baseline up to M18. All functioning scales of C30/B23 questionnaires, such as social functioning, future perspective and symptom scales, such as fatigue, pain etc., also significantly differ between these trajectories during the 18 months period. At M0 mean values of optimism (LOT), manageability (SOC) and meaningfulness (SOC) are significantly higher for ‘Low’ group. Figure I6: Time course of the mean value of selected scales for each HADS Depression trajectory cluster
AutoNDA by SimpleDocs

Related to HADS Depression trajectory clusters

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where InterGlobe has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to InterGlobe. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for InterGlobe (e.g. hairpinning):

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • CURVE WIDENING The minimum widening placed on the inside of curves is:  6 feet for curves of 50 to 79 feet radius.  4 feet for curves of 80 to 100 feet radius.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • One-Way Interconnection Trunks 2.3.1 Where the Parties have agreed to use One-Way Interconnection Trunks for the delivery of traffic from PCS to Verizon, PCS, at PCS’s own expense, shall:

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!