HccaDoneHead. When a TD is complete (with or without an error) it is unlinked from the queue that it is on and linked to the Done Queue. The Host Controller maintains a physical pointer to the last TD that was placed on the done queue (HcDoneHead.) When a TD is put on the done queue, the value in HcDoneHead is written to NextTD of the just completed TD and HcDoneHead is changed to contain the address of the TD just competed. This causes TDs to be linked at the head of the done queue. Linking at the head of the queue allows the hardware to maintain only one pointer for the Done Queue and also allows the linking to the Done Queue to be done at the same time as the ConditionCode update in a completed TD saving a memory access (i.e., the same write that updates the ConditionCode of a TD can be extended to cause the NextTD value of the TD to point to the TD that was previously at the head of the Done Queue.) Periodically, the Host Controller writes the current value of its HcDoneHead register into a memory location (HccaDoneHead) so that host software can process completed TDs. Nominally, XxXxxxXxxx is written to memory at the beginning of a frame when the deferred interrupt count is zero. After HcDoneHead is written to HccaDoneHead, the Host Controller sets HcDoneHead to 0 and sets the WD bit in the HcInterruptStatus register. The Host Controller can begin to build a new Done Queue immediately after writing to HccaDoneHead but it cannot write the new list to memory until the Host Controller Driver has cleared the WD bit. This protocol provides an interlocked exchange of the Done Queue. The LSb of this value is used to inform the Host Controller Driver that an interrupt condition exists for both the done list and for another event recorded in the HcInterruptStatus register. On an interrupt from the HC, the Host Controller Driver checks the HccaDoneHead Value. If this value is 0, then the interrupt was caused by other than the HccaDoneHead update and the HcInterruptStatus register needs to be accessed to determine that exact interrupt cause. If HccaDoneHead is nonzero, then a done list update interrupt is indicated and if the LSb of the Dword is nonzero, then an additional interrupt event is indicated and HcInterruptStatus should be checked to determine its cause.
AutoNDA by SimpleDocs

Related to HccaDoneHead

  • Cornerstone shall notify the LLC and confirm such advice in writing (i) when the filing of any post-effective amendment to the Registration Statement or supplement to the Prospectus is required, when the same is filed and, in the case of the Registration Statement and any post-effective amendment, when the same becomes effective, (ii) of any request by the Securities and Exchange Commission for any amendment of or supplement to the Registration Statement or the Prospectus or for additional information and (iii) of the entry of any stop order suspending the effectiveness of the Registration Statement or the initiation or threatening of any proceedings for that purpose, and, if such stop order shall be entered, Cornerstone shall use its best efforts promptly to obtain the lifting thereof.

  • Clinical Management for Behavioral Health Services (CMBHS) System 1. request access to CMBHS via the CMBHS Helpline at (000) 000-0000. 2. use the CMBHS time frames specified by System Agency. 3. use System Agency-specified functionality of the CMBHS in its entirety. 4. submit all bills and reports to System Agency through the CMBHS, unless otherwise instructed.

  • Xxxxx, Haldimand, Norfolk An employee shall be granted five working days bereavement leave with pay upon the death of the employee’s spouse, child, stepchild, parent, stepparent, legal guardian, grandchild or step-grandchild.

  • Chiropractic Services This plan covers chiropractic visits up to the benefit limit shown in the Summary of Medical Benefits. The benefit limit applies to any visit for the purposes of chiropractic treatment or diagnosis.

  • Vlastnictví Zdravotnické zařízení si ponechá a bude uchovávat Zdravotní záznamy. Zdravotnické zařízení a Zkoušející převedou na Zadavatele veškerá svá práva, nároky a tituly, včetně práv duševního vlastnictví k Důvěrným informacím (ve smyslu níže uvedeném) a k jakýmkoli jiným Studijním datům a údajům.

  • University Any notice may be served upon the University by delivering it, in writing, to the University at the address set forth on the last page of this Agreement, by depositing it in a United States Postal Service deposit box with the postage fully prepaid and with the notice addressed to the University at the aforementioned address, or by sending a facsimile of it to the University facsimile number set forth on the last page of this Agreement.

  • Electric Storage Resources Developer interconnecting an electric storage resource shall establish an operating range in Appendix C of its LGIA that specifies a minimum state of charge and a maximum state of charge between which the electric storage resource will be required to provide primary frequency response consistent with the conditions set forth in Articles 9.5.5, 9.5.5.1, 9.5.5.2, and 9.5.5.3 of this Agreement. Appendix C shall specify whether the operating range is static or dynamic, and shall consider (1) the expected magnitude of frequency deviations in the interconnection; (2) the expected duration that system frequency will remain outside of the deadband parameter in the interconnection; (3) the expected incidence of frequency deviations outside of the deadband parameter in the interconnection; (4) the physical capabilities of the electric storage resource; (5) operational limitations of the electric storage resources due to manufacturer specification; and (6) any other relevant factors agreed to by the NYISO, Connecting Transmission Owner, and Developer. If the operating range is dynamic, then Appendix C must establish how frequently the operating range will be reevaluated and the factors that may be considered during its reevaluation. Developer’s electric storage resource is required to provide timely and sustained primary frequency response consistent with Article 9.5.5.2 of this Agreement when it is online and dispatched to inject electricity to the New York State Transmission System and/or receive electricity from the New York State Transmission System. This excludes circumstances when the electric storage resource is not dispatched to inject electricity to the New York State Transmission System and/or dispatched to receive electricity from the New York State Transmission System. If Developer’s electric storage resource is charging at the time of a frequency deviation outside of its deadband parameter, it is to increase (for over-frequency deviations) or decrease (for under-frequency deviations) the rate at which it is charging in accordance with its droop parameter. Developer’s electric storage resource is not required to change from charging to discharging, or vice versa, unless the response necessitated by the droop and deadband settings requires it to do so and it is technically capable of making such a transition.

  • Přetrvávající platnost Tento odstavec 1.3 “Zdravotní záznamy a Studijní data a údaje” zůstane závazný i v případě zániku platnosti či vypršení platnosti této Smlouvy.

  • meminta nasihat daripada Pihak Xxxxxx dalam semua perkara berkenaan dengan jualan lelongan, termasuk Syarat-syarat Jualan (iii) membuat carian Hakmilik Xxxxx xxxxxx rasmi di Pejabat Tanah xxx/atau xxxx-xxxx Pihak-pihak Berkuasa yang berkenaan xxx (iv) membuat pertanyaan dengan Pihak Berkuasa yang berkenaan samada jualan ini terbuka kepada semua bangsa atau kaum Bumiputra Warganegara Malaysia sahaja atau melayu sahaja xxx juga mengenai persetujuan untuk jualan ini sebelum jualan lelong.Penawar yang berjaya ("Pembeli") dikehendaki dengan segera memohon xxx mendapatkan kebenaran pindahmilik (jika ada) daripada Pihak Pemaju xxx/atau Pihak Tuanpunya xxx/atau Pihak Berkuasa Negeri atau badan-badan berkenaan (v) memeriksa xxx memastikan samada jualan ini dikenakan cukai. HAKMILIK : Hakmilik strata bagi hartanah ini masih belum dikeluarkan HAKMILIK INDUK / NO. LOT : Pajakan Negeri 35263, Lot No.29096 MUKIM/DAERAH/NEGERI : Setapak / Kuala Lumpur / Wilayah Persekutuan Kuala Lumpur PEGANGAN : Pajakan selama 82-tahun berakhir pada 08/08/2085 KELUASAN LANTAI : 81.104 meter persegi ( 873 kaki persegi ) PEMAJU/PENJUAL : Mega Planner Jaya Sdn Bhd (326287-W)(Dalam Likuidasi) TUANPUNYA : Datuk Bandar Kuala Lumpur PEMBELI : Xxxxxxxx Bin Xxxxx @ Xxxx BEBANAN : Diserahhak kepada RHB Bank Berhad [196501000373 (6171-M)] Hartanah tersebut terletak di tingkat 9 pada bangunan apartment 14-tingkat terletak di Melati Impian Apartment, Setapak Fasa 1, Kuala Lumpur. Hartanah tersebut adalah sebuah unit apartment 3 xxxxx dikenali sebaga Xxxxx Pemaju No. 9, Tingkat No.9, Pembangunan dikenali sebagai Melati Impian Apartment Setapak Fasa 1, Kuala Lumpur xxx mempunyai alamat surat-xxxxxxxx xx Xxxx Xx. 0-0, Xxxxxx Impian Apartment, Xxxxx 0/00X, Xxxxx Xxxxxx, 00000 Xxxxx Xxxxxx, Xxxxxxx Xxxxxxxxxxx Xxxxx Xxxxxx. Harta ini dijual “keadaan seperti mana sediada” dengan harga rizab sebanyak RM 300,000.00 (RINGGIT MALAYSIA: TIGA RATUS RIBU SAHAJA) xxx tertakluk kepada syarat-syarat Jualan xxx melalui penyerahan hakkan dari Pemegang Serahak, tertakluk kepada kelulusan di perolehi oleh pihak Pembeli daripada pihak berkuasa, jika ada, termasuk semua terma, syarat xxx perjanjian yang dikenakan xxx mungkin dikenakan oleh Pihak Berkuasa yang berkenaan. Pembeli bertanggungjawab sepenuhnya untuk memperolehi xxx mematuhi syarat-syarat berkenaan daripada Pihak Berkuasa yang berkenaan, jika ada xxx semua xxx xxx perbelanjaan ditanggung xxx dibayar oleh Xxxxx Xxxxxxx.Pembeli atas talian (online) juga tertakluk kepada terma-terma xxx syarat-syarat terkandung dalam xxx.xxxxxxxxxxxxxxxx.xxx Pembeli yang berminat adalah dikehendaki mendeposit kepada Pelelong 10% daripada harga rizab dalam bentuk Bank Draf atau Cashier’s Order di atas nama RHB Bank Berhad sebelum lelongan awam xxx xxxx xxxx xxxxxx hendaklah dibayar dalam tempoh sembilan puluh (90) hari dari tarikh lelongan kepada RHB Bank Berhad melalui Bank Draf / XXXXXX. Butir-butir pembayaran melalui XXXXXX, xxxx berhubung dengan Tetuan Zahrin Emrad & Sujaihah. Untuk maklumat lanjut, xxxx berhubung dengan TETUAN ZAHRIN EMRAD & SUJIAHAH, yang beralamat di Suite 10.3, 10th Floor, Xxx Xxxx Building, Xx.00, Xxxxx Xxxx Xxxxxx, 00000 Xxxxx Xxxxxx. Tel: 00-0000 0000 / Fax: 00-0000 0000. [ Ruj: ZES/ZHR/RHB-FC/16250-17/0614-pae ], peguamcara bagi pihak pemegang xxxxx xxx atau pelelong yang tersebut dibawah.

  • Přetrvající platnost This Section 3 “

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!