Idaho Power Electrical System Study. Seller and Transmitting Entity will request, in writing, a specific Point of Delivery where the Facility’s Net Energy and Inadvertent Energy will be delivered to Idaho Power. This request will include the Maximum Capacity Amount (MW) as specified in Appendix B-4. Upon receipt of this request, at Seller’s expense, Idaho Power will complete an electrical system study to determine Idaho Power’s ability to receive the Maximum Capacity Amount at the requested Point of Delivery. This study will include a study of the Idaho Power electrical system at this Point of Delivery and estimation of any additional Seller costs associated with completing this request as specified in Appendix B. 4.1.8.1 If said study shows that Idaho Power will be unable to receive the Maximum Capacity Amount at the requested Point of Delivery, the Seller and Transmitting Entity may request a different Point of Delivery or revise the Maximum Capacity Amount and a similar study, at the Seller’s expense, will be conducted. 4.1.8.2 If the Seller and Transmitting Entity request permission to deliver the Maximum Capacity Amount at a Point of Delivery that Idaho Power has identified as being unable to receive the Maximum Capacity Amount, at Seller’s request and expense, Idaho Power will conduct a study to determine the necessary upgrades and/or modifications required to enable receipt of the Maximum Capacity Amount at the requested Point of Delivery. 4.1.8.3 Seller will be responsible for all customary and reasonable expenses associated with all Idaho Power studies, upgrades and/or modifications required to enable delivery of the Maximum Capacity Amount at the requested Point of Delivery. An initial deposit will be calculated based upon the estimated cost of each individual study, upgrade or modification and will be required to be paid by the Seller prior to Idaho Power conducting any work associated with the Seller’s request. Upon completion of any and all studies, upgrades and/or modifications required to accommodate the Seller’s request, Idaho Power will reconcile the actual expenses with the previously paid deposit and the appropriate refund or additional billing will be processed.
Appears in 2 contracts
Samples: Firm Energy Sales Agreement (Us Geothermal Inc), Firm Energy Sales Agreement (Us Geothermal Inc)
Idaho Power Electrical System Study. Seller and Transmitting Entity will request, in writing, a specific Point of Delivery where the Facility’s Net Energy and Inadvertent Energy will be delivered to Idaho Power. This request will include the Maximum Capacity Amount (MW) as specified in Appendix B-4. Upon receipt of this request, at Seller’s expense, Idaho Power will complete an electrical system study to determine Idaho Power’s ability to receive the Maximum Capacity Amount at the requested Point of Delivery. This study will include a study of the Idaho Power electrical system at this Point of Delivery and an estimation of any additional Seller costs associated with completing this request as specified in Appendix B.
4.1.8.1 If said study shows that Idaho Power will be unable to receive the Maximum Capacity Amount at the requested Point of Delivery, the Seller and Transmitting Entity may request a different Point of Delivery or revise the Maximum Capacity Amount and a similar study, at the Seller’s expense, will be conducted.
4.1.8.2 If the Seller and Transmitting Entity request permission to deliver the Maximum Capacity Amount at a Point of Delivery that Idaho Power has identified as being unable to receive the Maximum Capacity Amount, at Seller’s request and expense, Idaho Power will conduct a study to determine the necessary upgrades and/or modifications required to enable receipt of the Maximum Capacity Amount at the requested Point of Delivery.
4.1.8.3 Seller will be responsible for all customary and reasonable expenses associated with all Idaho Power studies, upgrades and/or modifications required to enable delivery of the Maximum Capacity Amount at the requested Point of Delivery. An initial deposit will be calculated based upon the estimated cost of each individual study, upgrade or modification and will be required to be paid by the Seller prior to Idaho Power conducting any work associated with the Seller’s request. Upon completion of any and all studies, upgrades and/or modifications required to accommodate the Seller’s request, Idaho Power will reconcile the actual expenses with the previously paid deposit and the appropriate refund or additional billing will be processed.
Appears in 2 contracts
Samples: Firm Energy Sales Agreement (Us Geothermal Inc), Firm Energy Sales Agreement (Us Geothermal Inc)