Initial Engineering Assessment Sample Clauses

Initial Engineering Assessment. The Contractor shall review existing documentation to identify and determine the adequacy of the pressure system components with respect to the NASA requirements and current codes and standards. This includes review of maximum allowable working pressure and temperature, remaining life evaluation, etc. In most cases, simple code calculations or evaluations using commercial codes are adequate. However, in some cases a finite element analysis, and/or fatigue and fracture life assessment may be required. The Contractor shall have demonstrated capabilities to perform all type of engineering assessment; and in addition to the above calculations, shall provide relief valve sizing calculations and piping system flexibility analyses of piping systems, as required.
AutoNDA by SimpleDocs

Related to Initial Engineering Assessment

  • Geotechnical Engineer « »« » « » « » « » « »

  • Engineering Report Lender shall have received a current Engineering Report with respect to the Property, which report shall be in form and substance reasonably satisfactory to Lender.

  • Joint Assessment If the Premises are not separately assessed, Lessee's liability shall be an equitable proportion of the Real Property Taxes for all of the land and improvements included within the tax parcel assessed, such proportion to be conclusively determined by Lessor from the respective valuations assigned in the assessor's work sheets or such other information as may be reasonably available.

  • Value Engineering The Supplier may prepare, at its own cost, a value engineering proposal at any time during the performance of the contract. The value engineering proposal shall, at a minimum, include the following; a) the proposed change(s), and a description of the difference to the existing contract requirements; b) a full cost/benefit analysis of the proposed change(s) including a description and estimate of costs (including life cycle costs) the Procuring Entity may incur in implementing the value engineering proposal; and c) a description of any effect(s) of the change on performance/functionality.

  • Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and Xxxxxxxxx. A detailed definition of the specific scope for Transmission Owner and Clinton and Xxxxxxxxx including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to Xxxxx and Xxxxxxx Substations on MWP-1 and the Xxxx Substation on MWP-2. Clinton and Xxxxxxxxx will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and Xxxxxxxxx will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and Xxxxxxxxx will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and Xxxxxxxxx. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and Xxxxxxxxx. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.

  • Feasibility Study A feasibility study will identify the potential costs, service quality and other benefits which would result from contracting out the work in question. The cost analysis for the feasibility study shall not include the Employer’s indirect overhead costs for existing salaries or wages and benefits for administrative staff or for rent, equipment, utilities, and materials, except to the extent that such costs are attributable solely to performing the services to be contracted out. Upon completion of the feasibility study, the Employer agrees to furnish the Union with a copy if the feasibility study, the bid from the Apparent Successful Bidder and all pertinent information upon which the Employer based its decision to contract out the work including, but not limited to, the total cost savings the Employer anticipates. The Employer shall not go forward with contracting out the work in question if more than sixty percent (60%) of any projected savings resulting from the contracting out are attributable to lower employee wage and benefit costs.

  • No Joint Assessment Borrower shall not suffer, permit or initiate the joint assessment of the Property (a) with any other real property constituting a tax lot separate from the Property, and (b) which constitutes real property with any portion of the Property which may be deemed to constitute personal property, or any other procedure whereby the lien of any taxes which may be levied against such personal property shall be assessed or levied or charged to such real property portion of the Property.

  • Engineering Reports (a) Not less than 30 days prior to each Scheduled Borrowing Base Redetermination Date, commencing with the Scheduled Borrowing Base Redetermination to occur on or around March 15, 2007, the Borrower shall furnish to the Administrative Agent and the Lenders a Reserve Report. The Reserve Reports delivered in connection with each March 15 Scheduled Borrowing Base Redetermination, commencing March 15, 2007, shall be prepared by certified independent petroleum engineers or other independent petroleum consultant(s) acceptable to the Administrative Agent. The Reserve Reports delivered in connection with each September 15 Scheduled Borrowing Base Redetermination, commencing September 15, 2007, shall be prepared by or under the supervision of the chief engineer of the Borrower and a Responsible Officer shall certify such Reserve Report to be true and accurate and to have been prepared in accordance with the procedures used in the immediately preceding Scheduled Borrowing Base Redetermination Reserve Report. (b) In the event of an unscheduled redetermination, the Borrower shall furnish to the Administrative Agent and the Lenders a Reserve Report prepared by or under the supervision of the chief engineer of the Obligors together with the certificate of a Responsible Officer who shall certify such Reserve Report to be true and accurate and to have been prepared in accordance with the procedures used in the immediately preceding Reserve Report. For any unscheduled redetermination requested by the Lenders or the Borrower pursuant to Section 2.08(d), the Borrower shall provide such Reserve Report with an “as of” date as required by the Lenders as soon as possible, but in any event no later than 30 days following the receipt of the request by the Administrative Agent. (c) With the delivery of each Reserve Report, the Borrower shall provide, or cause to be provided, to the Administrative Agent and the Lenders, a certificate from a Responsible Officer certifying that, to the best of his knowledge and in all material respects: (i) the information contained in the Reserve Report and any other information delivered in connection therewith is true and correct, (ii) the Obligors and the Partnerships own good and marketable title to the Oil and Gas Properties evaluated in such Reserve Report and such Properties are free of all Liens except for Liens permitted by Section 9.03, (iii) except as set forth on an exhibit to the certificate, on a net basis there are no gas imbalances, take or pay or other prepayments with respect to its Oil and Gas Properties evaluated in such Reserve Report which would require any Obligor to deliver Hydrocarbons produced from such Oil and Gas Properties at some future time without then or thereafter receiving full payment therefor, (iv) none of Obligor’s or and the Partnerships’ Oil and Gas Properties have been sold since the date of the last Borrowing Base determination except as set forth on an exhibit to the certificate, which certificate shall list all of its Oil and Gas Properties sold and in such detail as reasonably required by the Administrative Agent, (v) attached to the certificate is a list of its Oil and Gas Properties added to and deleted from the immediately prior Reserve Report and a list showing any change in working interest or net revenue interest in its Oil and Gas Properties occurring and the reason for such change, (vi) attached to the certificate is a list of all Persons disbursing proceeds to the Obligors from their Oil and Gas Properties, and (vii) all of the Oil and Gas Properties evaluated by such Reserve Report are Mortgaged Property except as set forth on a schedule attached to the certificate.

  • Environmental Assessment Buyer shall have the right for a period commencing upon execution of this Agreement by both parties and ending on November 28, 2012, to conduct an environmental assessment of the Assets, at Buyer’s sole risk, liability and expense. Seller shall make available to Buyer, during the environmental assessment period described above, Seller’s historical files regarding prior operations on the Assets, and provide Buyer and its representatives with reasonable access to the Assets to conduct the environmental assessment. Buyer shall provide Seller three (3) days prior written notice of a desired date(s) for such assessment and Seller shall have the right to be present during any assessment and, if any testing is conducted pursuant to Seller’s express prior written consent, Seller may require splitting of all samples. Notwithstanding any other provision of this Agreement to the contrary, Buyer shall not have the right to drill any test, monitor or other xxxxx or to extract samples of any air, soil, water or other substance from the Assets without Seller’s express prior written consent. If Buyer proposes a reasonable request to drill a test well or extract a sample pursuant to a systematic and customary procedure for the assessment of the environmental condition of the Assets and Seller refuses to grant its consent to such a well or sampling, then Buyer shall have the right, for a period of seventy-two (72) hours following notification of Seller’s refusal to consent, to deliver written notice to Seller of Buyer’s election to exclude from this transaction the portion of the Assets affected by such proposed test well or sample, and the Purchase Price shall be adjusted accordingly by the Allocated Value of such portion of the Assets so excluded. Under no circumstances whatsoever shall Seller ever be obligated to grant its consent to any such test xxxxx or sampling proposed by Buyer, and Buyer’s sole and exclusive remedy for any refusal by Seller to grant its consent shall be the limited right contained in the preceding sentence to exclude the affected Assets from the transactions contemplated by this Agreement. If Buyer fails to exercise the right to exclude such Assets by written notice to Seller delivered prior to the expiration of the seventy-two hour period described above, then Buyer shall be conclusively deemed to have waived such right and shall be obligated to purchase the affected Assets without conducting such testing or sampling or any adjustment of the Purchase Price unless otherwise provided in this Agreement.

  • Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.