Install Ceiling Fan Sample Clauses

Install Ceiling Fan. Verify whether or not it is feasible to install the ceiling fan in the location designated. Procure and install the ceiling fan as instructed by COR. Anchorage shall be determined individually depending on the case. Wherever there is a rod for the fan it shall be securely attached to the chandelier hook. Cost of the ceiling fan will be reimbursed and contractor shall provide all tools. Ensure the ceiling fan complies with local codes and report any malfunctions to the COR.
AutoNDA by SimpleDocs

Related to Install Ceiling Fan

  • Upgrade 5.1 Every version of the Software is treated as a separate product and comes under its own End-User License Agreement. By installing any other version of the Software, which is licensed under the terms of this XXXX, the Licensee terminates this Agreement according to clause 4.1.3 and enters into another End-User License Agreement that comes with the installed version.

  • Built-up Area The built-up area for the Designated Apartment or any other Unit shall mean the Carpet Area of such Unit and Balcony area and 50% (fifty percent) of the area covered by those external walls which are common between such Unit/Balcony and any other Unit/Balcony and the area covered by all other external walls of the such Unit/Balcony.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Configuration The configuration for the Purchase Right Aircraft will be the Detail Specification for Model 767-3S2F aircraft at the revision level in effect at the time of the Supplemental Agreement. Such Detail Specification will be revised to include (i) changes required to obtain required regulatory certificates and (ii) other changes as mutually agreed upon by Boeing and Customer.

  • UNIFORMS & EQUIPMENT Uniforms and equipment required by the Department to be worn/used by employees will be furnished by the Department.

  • Collocation of Switching Equipment CLEC may collocate any equipment that is necessary for Interconnection or access to Unbundled Network Elements.

  • No Installing Generator Not to install or keep or run any generator in the Said Apartment.

  • 000 TOOL ROOMS 24.100 The Company and the Unions agree that it shall be the Owner's prerogative to maintain and operate a general centrally located tool room and warehouse. The Unions agree that the manpower required for the operation of the centrally located tool room and warehouse may at the Owner's option be employed directly by them.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Installation Where installation is required, Contractor shall be responsible for placing and installing the product in the required locations at no additional charge, unless otherwise designated on the Contract or purchase order. Contractor’s authorized product and price list shall clearly and separately identify any additional installation charges. All materials used in the installation shall be of good quality and shall be free of defects that would diminish the appearance of the product or render it structurally or operationally unsound. Installation includes the furnishing of any equipment, rigging, and materials required to install or replace the product in the proper location. Contractor shall protect the site from damage and shall repair damages or injury caused during installation by Contractor or its employees or agents. If any alteration, dismantling, excavation, etc., is required to achieve installation, the Contractor shall promptly restore the structure or site to its original condition. Contractor shall perform installation work so as to cause the least inconvenience and interference with Customers and with proper consideration of others on site. Upon completion of the installation, the location and surrounding area of work shall be left clean and in a neat and unobstructed condition, with everything in satisfactory repair and order.

Time is Money Join Law Insider Premium to draft better contracts faster.