INSTALLATION AND SET-UP. a) Contractor shall separately itemize all installation and physical requirements for materials as listed below: • Ventilation or Air conditioning • Electrical requirement • Special grounding • Cabling requirement • Weight (floor loading) • Space requirements • Humidity and temperature limits • Noise level
Appears in 5 contracts
Samples: It Cabling, Master Contract, www.alturacs.com