Interconnect Cost. The Member will bear all the cost of interconnection on the Member’s side of the point of interconnection as well as necessary changes or upgrades to the Area EPS to meet all technical and protection requirements to address any power quality, reliability or safety issues caused by the Generator operation or connection to the Area EPS.
Appears in 6 contracts
Interconnect Cost. The Member will bear all the cost of interconnection on the Member’s side of the point of interconnection as well as necessary changes or upgrades to the Area EPS CES to meet all technical and protection requirements to address any power quality, reliability or safety issues caused by the Generator Distributed Resource operation or connection to the Area EPSCES.
Appears in 1 contract
Samples: Agreement