Interconnection Customer Operating Requirements. The Interconnection Customer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. The Interconnection Customer must comply with Connecting Transmission Owner’s operating instructions and requirements as set out in the most current version of National Grid’s Electric System Bulletin 756 (as updated from time to time), as referenced in Article 9.3 of this Agreement, which requirements shall include the dedicated data circuits, including protection circuits, to be maintained by the Transmission Customer in accordance with Article 8.1 of this Agreement. With respect to Capacity Resource Interconnection Service (“▇▇▇▇”), the Large Generating Facility has a ▇▇▇▇ value of 954 MW. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Interconnection Customers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. Interconnection Customer commenced Commercial Operation of the Large Generating Facility on November 15, 1994, the Commercial Operation Date. New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ In accordance with Article 10.5 of this Agreement, Interconnection Customer shall be responsible for all reasonable expenses (“O&M Expenses”) associated with the operation, maintenance, repair and replacement of Connecting Transmission Owner’s Attachment Facilities, as defined in Appendix A. Interconnection Customer shall have the option to pay such O&M Expenses either under the procedure described in Option 1 or in Option 2 below.
Appears in 3 contracts
Sources: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Interconnection Customer Operating Requirements. The Interconnection Customer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. The Interconnection Customer must comply with Connecting Transmission Owner’s operating instructions and requirements as set out in the most current version of National Grid’s Electric System Bulletin 756 (as updated from time to time), as referenced in Article 9.3 of this Agreement, which requirements shall include the dedicated data circuits, including protection circuits, to be maintained by the Transmission Customer in accordance with Article 8.1 of this Agreement. With respect to Capacity Resource Interconnection Service (“▇▇▇▇”), the Large Generating Facility has a ▇▇▇▇ value of 954 MW. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Interconnection Customers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. Interconnection Customer commenced Commercial Operation of the Large Generating Facility on November 15, 1994, the Commercial Operation Date. New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇Waltham, ▇▇ ▇▇▇▇▇ MA 02451 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇Oswego, ▇▇ ▇▇▇▇▇ NY 13126 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇Waltham, ▇▇ ▇▇▇▇▇ MA 02451 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇Oswego, ▇▇ ▇▇▇▇▇ NY 13126 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇Waltham, ▇▇ ▇▇▇▇▇ MA 02451 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇Oswego, ▇▇ ▇▇▇▇▇ NY 13126 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ In accordance with Article 10.5 of this Agreement, Interconnection Customer shall be responsible for all reasonable expenses (“O&M Expenses”) associated with the operation, maintenance, repair and replacement of Connecting Transmission Owner’s Attachment Facilities, as defined in Appendix A. Interconnection Customer shall have the option to pay such O&M Expenses either under the procedure described in Option 1 or in Option 2 below.
Appears in 2 contracts
Sources: Interconnection Agreement, Interconnection Agreement
Interconnection Customer Operating Requirements. The Interconnection Customer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. The Interconnection Customer must comply with Connecting Transmission Owner’s operating instructions and requirements as set out in the most current version of National Grid’s Electric System Bulletin 756 (as updated from time to time), as referenced in Article 9.3 of this Agreement, which requirements shall include the dedicated data circuits, including protection circuits, to be maintained by the Transmission Customer in accordance with Article 8.1 of this Agreement. With respect to Capacity Resource Interconnection Service (“▇▇▇▇”), the Large Generating Facility has a ▇▇▇▇ value of 954 MW. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Interconnection Customers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. Interconnection Customer commenced Commercial Operation of the Large Generating Facility on November 15, 1994, the Commercial Operation Date. NYISO: New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Connecting Transmission Owner: ▇▇▇▇▇▇▇ ▇. ▇▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ Connecting Transmission Owner: ▇▇▇▇▇▇▇ ▇. ▇▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Connecting Transmission Owner: ▇▇▇▇▇▇▇ ▇. ▇▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ In accordance with Article 10.5 of this Agreement, Interconnection Customer shall be responsible for all reasonable expenses (“O&M Expenses”) associated with the operation, maintenance, repair and replacement of Connecting Transmission Owner’s Attachment Facilities, as defined in Appendix A. Interconnection Customer shall have the option to pay such O&M Expenses either under the procedure described in Option 1 or in Option 2 below.
Appears in 1 contract
Sources: Interconnection Agreement
Interconnection Customer Operating Requirements. The Interconnection Customer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. The Interconnection Customer must comply with Connecting Transmission Owner’s operating instructions and requirements as set out in the most current version of National Grid’s Electric System Bulletin 756 (as updated from time to time), as referenced in Article 9.3 of this Agreement, which requirements shall include the dedicated data circuits, including protection circuits, to be maintained by the Transmission Customer in accordance with Article 8.1 of this Agreement. With respect to Capacity Resource Interconnection Service (“▇▇▇▇”), the Large Generating Facility has a ▇▇▇▇ value of 954 MW. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Interconnection Customers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. Interconnection Customer commenced Commercial Operation of the Large Generating Facility on November 15, 1994, the Commercial Operation Date. New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇Waltham, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ MA 02451 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇Oswego, ▇▇ ▇▇▇▇▇ NY 13126 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Waltham, MA 02451 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ Oswego, NY 13126 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Waltham, MA 02451 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ Oswego, NY 13126 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ In accordance with Article 10.5 of this Agreement, Interconnection Customer shall be responsible for all reasonable expenses (“O&M Expenses”) associated with the operation, maintenance, repair and replacement of Connecting Transmission Owner’s Attachment Facilities, as defined in Appendix A. Interconnection Customer shall have the option to pay such O&M Expenses either under the procedure described in Option 1 or in Option 2 below.
Appears in 1 contract
Sources: Interconnection Agreement
Interconnection Customer Operating Requirements. The Interconnection Customer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. The Interconnection Customer must comply with Connecting Transmission Owner’s operating instructions and requirements as set out in the most current version of National Grid’s Electric System Bulletin 756 (as updated from time to time), as referenced in Article 9.3 of this Agreement, which requirements shall include the dedicated data circuits, including protection circuits, to be maintained by the Transmission Customer in accordance with Article 8.1 of this Agreement. With respect to Capacity Resource Interconnection Service (“▇▇▇▇”), the Large Generating Facility has a ▇▇▇▇ value of 954 MW. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Interconnection Customers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-cyber- security practices. Interconnection Customer commenced Commercial Operation of the Large Generating Facility on November 15, 1994, the Commercial Operation Date. Notices: NYISO: New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ FaxConnecting Transmission Owner: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇. ▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ FaxAlternative Forms of Delivery of Notices (telephone, facsimile or email): NYISO: New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ 5. Operations and Maintenance Expenses In accordance with Article 10.5 of this Agreement, Interconnection Customer Customerthe Developer shall be responsible for all reasonable expenses (“O&M Expenses”) associated with the operation, maintenance, repair and replacement of the Connecting Transmission Owner’s Attachment Facilities, as defined such facilities are deftainled in this Appendix A. A (“O&M Expenses”). Interconnection Customer CustomerThe Developer shall have the option to pay such O&M Expenses either under the procedure described in Option 1 or in Option 2 below.
Appears in 1 contract
Sources: Interconnection Agreement
Interconnection Customer Operating Requirements. The Interconnection Customer must comply with all applicable NYISO tariffs and procedures, as amended from time to time. The Interconnection Customer must comply with Connecting Transmission Owner’s operating instructions and requirements as set out in the most current version of National Grid’s Electric System Bulletin 756 (as updated from time to time), as referenced in Article 9.3 of this Agreement, which requirements shall include the dedicated data circuits, including protection circuits, to be maintained by the Transmission Customer in accordance with Article 8.1 of this Agreement. With respect to Capacity Resource Interconnection Service (“▇▇▇▇”), the Large Generating Facility has a ▇▇▇▇ value of 954 MW. Infrastructure security of New York State Transmission System equipment and operations and control hardware and software is essential to ensure day-to-day New York State Transmission System reliability and operational security. The Commission will expect the NYISO, all Transmission Owners, all Interconnection Customers and all other Market Participants to comply with the recommendations offered by the President’s Critical Infrastructure Protection Board and, eventually, best practice recommendations from the electric reliability authority. All public utilities will be expected to meet basic standards for system infrastructure and operational security, including physical, operational, and cyber-security practices. Interconnection Customer commenced Commercial Operation of the Large Generating Facility on November 15, 1994, the Commercial Operation Date. NYISO: New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Connecting Transmission Owner: ▇▇▇▇▇▇▇ ▇. ▇▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ Connecting Transmission Owner: ▇▇▇▇▇▇▇ ▇. ▇▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ ▇▇▇▇▇.▇▇▇▇▇▇▇@▇▇▇▇▇▇.▇▇▇ New York Independent System Operator, Inc. Attn: Vice President, Operations ▇▇▇▇ ▇▇▇▇▇▇ ▇▇▇▇ Schenectady, NY 12303 Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Connecting Transmission Owner: ▇▇▇▇▇▇▇ ▇. ▇▇▇▇▇ Director, Transmission Commercial National Grid ▇▇ ▇▇▇▇▇▇ ▇▇▇▇ ▇▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ Email: ▇▇▇▇.▇▇▇▇▇@▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇ Interconnection Customer: Sithe Independence Power Partners, L.P. Attn: ▇▇▇▇▇ ▇▇▇▇▇▇▇ Administrative Manager ▇▇ ▇▇▇▇▇▇▇▇▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇ ▇▇▇▇▇ Phone: (▇▇▇) ▇▇▇-▇▇▇▇ Fax: (▇▇▇) ▇▇▇-▇▇▇▇ In accordance with Article 10.5 of this Agreement, Interconnection Customer shall be responsible for all reasonable expenses (“O&M Expenses”) associated with the operation, maintenance, repair and replacement of Connecting Transmission Owner’s Attachment Facilities, as defined in Appendix A. Interconnection Customer shall have the option to pay such O&M Expenses either under the procedure described in Option 1 or in Option 2 below.
Appears in 1 contract