Interconnection Customer’s Scope of Work and Responsibilities. The Interconnection Customer shall design, procure, construct, install, own, operate and maintain the Interconnection Customer’s Interconnection Facilities in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, the Connecting Transmission Owner’s System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Fairway Solar Project provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications and the ESB 756A. As per ESB 756A, the Interconnection Customer shall install the RTU indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. The Interconnection Customer shall install conduit for the wiring from the instrument transformers to the meter equipment panel and meter socket in accordance with the ESBs and the Project Specific Specifications. The Interconnection Customer is responsible for ordering the fiber facility required at the Fairway Solar Collector Substation. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of Interconnection Facilities. New right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 6 Tap and must accommodate the 125’ x 125’ work pads required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the tap line, access roads to/from the tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards And Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019). The Interconnection Customer is also responsible for all permitting. The Interconnection Customer’s takeoff structure shall be designed in accordance with the requirements set forth in the Project Specific Specifications.
Appears in 2 contracts
Samples: Standard Small Generator Interconnection Agreement, Standard Small Generator Interconnection Agreement
Interconnection Customer’s Scope of Work and Responsibilities. The Interconnection Customer shall design, procure, construct, install, own, operate operate, and maintain the Interconnection Customer’s Interconnection Facilities. The Interconnection Customer will design, procure, construct, and install the Connecting Transmission Owner’s Interconnection Facilities in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT OATT, or applicable NYISO Proceduresprocedures: NYISO the NYISO’s requirements, ; industry standards and specifications specifications; regulatory requirements, ; the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, ; the Connecting Transmission Owner’s System Protection and Interconnection Customer Developer Attachment Facilities Electric Installation Specification for Fairway the Pattersonville Solar Project (“Project Specific Specifications”) provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), Facility; and Good Utility Practice. The Interconnection Customer shall submit all SERVICE AGREEMENT NO. 2544 engineering design and electrical specifications associated with Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications Specifications, ESB 752 and the ESB 756A. 750. As per ESB 756A752, the Interconnection Customer shall install the RTU indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. The Interconnection Customer shall install conduit for the wiring from the instrument transformers to the meter equipment panel and meter socket in accordance with the ESBs and the Project Specific Specifications. The Interconnection Customer is responsible for ordering the fiber facility required at the Fairway Solar Collector Substation. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of Interconnection Facilities. New right-of-way (“ROW”) A 100’ wide ROW will be required for the construction, operation, and maintenance of the Line 6 10 Tap line and must accommodate the 125’ x 125’ work pads will be required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the tap Line 10 Tap line, access roads to/from the tapLine 10 Tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards And and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (Specifications, dated January 2019). The Interconnection Customer is also responsible for all permitting. The Upon termination of this Agreement, Interconnection Customer’s takeoff structure Customer shall be designed in accordance responsible for all costs associated with the requirements set forth in the Project Specific Specificationsdecommissioning and removal of Connecting Transmission Owner’s Interconnection Facilities.
Appears in 2 contracts
Samples: Service Agreement, Interconnection Agreement
Interconnection Customer’s Scope of Work and Responsibilities. The Interconnection Customer shall design, procure, construct, installoperate, own, operate and maintain the Interconnection Customer’s Interconnection Facilities ICIFs in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT OATT, or applicable NYISO Procedures: NYISO ISO procedures; the NYISO’s requirements, ; industry standards and specifications specifications; regulatory requirements, ; the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, ; and the Connecting Transmission Owner’s System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Fairway Hawthorn Solar Project provided as Appendix C (“Hawthorn Solar Project Specifications”) and Standards and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications, dated January 2019. The Hawthorn Solar Project Specifications may be amended after receipt and review of the Facilities Study Interconnection Customer’s final design and equipment specifications for the Small Generating Facility and notice to proceed with funding under the terms of the Interconnection Agreement. SERVICE AGREEMENT NO. 2756 The Interconnection Customer shall furnish and install: • a billing meter panel in the Hawthorn Solar Collector Substation control building in accordance with ESB 756 and ESB 750 (“Project Specific Specifications”the billing meter panel must be near the RTU); • conduit for the wiring from the instrument transformers to the Connecting Transmission Owner supplied meter socket in accordance with ESB 758, ESB 752, and Good Utility PracticeESB 750. The Interconnection Customer shall submit all engineering design and electrical specifications associated with Interconnection Customer’s Interconnection Facilities to run the Connecting Transmission Owner for its review and acceptance provided color-coded instrument transformer secondary cable from the instrument transformers to the meter socket in accordance with the ESBs and Hawthorn Solar Project Specific Specifications. The Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications and the ESB 756A. As per ESB 756A756 and ESB 752, the Interconnection Customer shall install the RTU indoors and within 15 feet of the meter(s), ) and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. The Interconnection Customer shall install conduit provide: • a dedicated 20A, 120VAC single phase 60 hertz power circuit for the RTU; • conduit and wiring (minimum No. 10 AWG copper) to the RTU cabinet, which shall enter the cabinet from the instrument transformers to the meter equipment panel and meter socket in accordance with the ESBs and the Project Specific Specifications. The Interconnection Customer is responsible for ordering the fiber facility required at the Fairway Solar Collector Substation. Upon termination bottom (a 3 foot length of this Agreement, Interconnection Customer all conductors shall be responsible provided for all costs associated with final connection); and • a dedicated 10A, 48VDC or 125VDC circuit for the decommissioning and removal of Interconnection FacilitiesRTU from the station battery. New right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 6 Tap tap line and must accommodate the 125’ x 125’ work pads (temporary) required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the propertyall real estate/easements needed and environmental permits for Connecting Transmission Owner to construct, operate, and maintain the tap line, transmission infrastructure including all permanent and temporary real estate for construction of the facilities and all access roads to/from the tap, (permanent and work pads, temporary). The Interconnection Customer shall acquire all required real estate in accordance with the standards set forth in the Connecting Transmission Owner’s Standards And and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications Specifications. Permanent access roads are required for access to the new load break disconnect switches. Property rights for the line tap and transmission line facilities and associated access roads must be transferred to Connecting Transmission Owner at least two (January 2019)2) months in advance of construction initiation. The Interconnection Customer is also responsible for all permittingSERVICE AGREEMENT NO. The Interconnection Customer’s takeoff structure shall be designed in accordance with the requirements set forth in the Project Specific Specifications.2756
Appears in 2 contracts
Samples: Interconnection Agreement, Interconnection Agreement
Interconnection Customer’s Scope of Work and Responsibilities. The Interconnection Customer shall design, procure, construct, install, own, operate and maintain the Interconnection Customer’s Interconnection Facilities in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, the Connecting Transmission Owner’s System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Fairway Solar Project provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications and the ESB 756A. As per ESB 756A, the Interconnection Customer shall install the RTU indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. SERVICE AGREEMENT NO. 2647 The Interconnection Customer shall install conduit for the wiring from the instrument transformers to the meter equipment panel and meter socket in accordance with the ESBs and the Project Specific Specifications. The Interconnection Customer is responsible for ordering the fiber facility required at the Fairway Solar Collector Substation. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of Interconnection Facilities. New right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 6 Tap and must accommodate the 125’ x 125’ work pads required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the tap line, access roads to/from the tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards And Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019). The Interconnection Customer is also responsible for all permitting. The Interconnection Customer’s takeoff structure shall be designed in accordance with the requirements set forth in the Project Specific Specifications.
Appears in 2 contracts
Samples: Service Agreement, Service Agreement
Interconnection Customer’s Scope of Work and Responsibilities. The Interconnection Customer shall design, procure, construct, install, own, operate operate, and maintain the Interconnection Customer’s Interconnection Facilities. The Interconnection Customer will design, procure, construct, and install the Connecting Transmission Owner’s Interconnection Facilities in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT OATT, or applicable NYISO Proceduresprocedures: NYISO the NYISO’s requirements, ; industry standards and specifications specifications; regulatory requirements, ; the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, ; the Connecting Transmission Owner’s System Protection and Interconnection Customer Developer Attachment Facilities Electric Installation Specification for Fairway the Pattersonville Solar Project (“Project Specific Specifications”) provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), Facility; and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications Specifications, ESB 752 and the ESB 756A. 750. As per ESB 756A752, the Interconnection Customer shall install the RTU indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. The Interconnection Customer shall install conduit for the wiring from the instrument transformers to the meter equipment panel and meter socket in accordance with the ESBs and the Project Specific Specifications. The Interconnection Customer is responsible for ordering the fiber facility required at the Fairway Solar Collector Substation. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of Interconnection Facilities. New right-of-way (“ROW”) A 100’ wide ROW will be required for the construction, operation, and maintenance of the Line 6 10 Tap line and must accommodate the 125’ x 125’ work pads will be required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the tap Line 10 Tap line, access roads to/from the tapLine 10 Tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards And and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (Specifications, dated January 2019). The Interconnection Customer is also responsible for all permitting. The Upon termination of this Agreement, Interconnection Customer’s takeoff structure Customer shall be designed in accordance responsible for all costs associated with the requirements set forth in the Project Specific Specificationsdecommissioning and removal of Connecting Transmission Owner’s Interconnection Facilities.
Appears in 1 contract
Interconnection Customer’s Scope of Work and Responsibilities. The Interconnection Customer shall design, procure, construct, install, own, operate operate, and maintain the Interconnection Customer’s Interconnection Facilities. The Interconnection Customer will design, procure, construct, and install the Connecting Transmission Owner’s Interconnection Facilities in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT OATT, or applicable NYISO Proceduresprocedures: NYISO the NYISO’s requirements, ; industry standards and specifications specifications; regulatory requirements, ; the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, ; the Connecting Transmission Owner’s System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Fairway the Skyline Solar Facility (“Project Specific Specifications”) provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), Facility; and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The metering of any redundant or standby station service provisions at the Skyline Solar Collector Substation shall be added in accordance with the Connecting Transmission Owner’s retail tariff, P.S.C. No. 220 and the Connecting Transmission Owner’s ESB 750. The Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications Specifications, ESB 752 and ESB 750. The Interconnection Customer shall mount the ESB 756A. revenue metering CT/PT units (provided by the Connecting Transmission Owner), make grounding connections, and complete all primary wiring. The Interconnection Customer shall install the meter socket enclosure (provided by the Connecting Transmission Owner) near the Connecting Transmission Owner’s RTU in accordance with the Project Specific Specifications. As per ESB 756Athe Project Specific Specifications, the Interconnection Customer shall install the RTU provided by the Connecting Transmission Owner indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. The Interconnection Customer shall install conduit for the wiring from the instrument transformers to the meter equipment panel and meter socket in accordance with the ESBs and the Project Specific Specifications. The Interconnection Customer is responsible for ordering the fiber facility required at the Fairway Solar Collector Substation. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of Interconnection Facilities. New right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 6 12 Tap line and must accommodate the 125’ x 125’ work pads required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the tap Line 12 Tap line, access roads to/from the tapLine 12 Tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards And and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019)) provided as Appendix E to the Facility Study for the Small Generating Facility. The Interconnection Customer is also responsible for all permitting. The Upon termination of this Agreement, Interconnection Customer’s takeoff structure Customer shall be designed in accordance responsible for all costs associated with the requirements set forth in the Project Specific Specificationsdecommissioning and removal of Connecting Transmission Owner’s Interconnection Facilities.
Appears in 1 contract
Samples: Service Agreement
Interconnection Customer’s Scope of Work and Responsibilities. The Interconnection Customer shall will design, procure, construct, install, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specificationsxxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric-Specifications, the Connecting Transmission Owner’s System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Fairway Albany County 1 Solar Project (Queue #570) provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), and Good Utility Practice. The Interconnection Customer All protection scheme design drawings and relay settings shall submit all engineering design and electrical specifications associated with be prepared by the Interconnection Customer’s Interconnection Facilities NYS licensed professional engineer, and the design and equipment specifications shall be provided to the Connecting Transmission Owner for its review review, comment and acceptance acceptance, prior to application and testing in accordance with the ESBs ESBs. The Interconnection Customer will mount the CT/PT units and Project Specific Specificationsinstall the meter socket enclosure provided by Connecting Transmission Owner, make grounding connections, and complete all primary wiring. The Interconnection Customer shall install a meter panel in accordance with provide On/Off switches for the DTT schemes. The Interconnection Customer is responsible for ordering the fiber facility required at the Xxxxxx 0 Xxxxxxxxx Xxxxxxxxxx. The Interconnection Customer shall construct the following portions of the Connecting Transmission Owner’s Interconnection Facilities as stated above and per the Project Specific Specifications and the ESB 756A. As per ESB 756A, the ESBs: • The Interconnection Customer shall will provide 115kV line protection to remove the generation for faults on Long Lane – LaFarge Line 6 and redundant distance relaying. • The Interconnection Customer will install the RTU provided by Connecting Transmission Owner as per Connecting Transmission Owner’s ESB 752, indoors and within 15 feet of the meter(s), and remote from: • o heavy traffic areas, work areas, and loading areas; • o heat producing or high electrostatic or electromagnetic field producing equipment; and • o station batteries. • The Interconnection Customer shall will install conduit for the wiring from the instrument transformers an Ethernet communications link to the meter equipment panel and meter socket in accordance with RTU for transmitting the ESBs and metering data to the Project Specific SpecificationsRTU. The Interconnection Customer is responsible for ordering the fiber facility required at the Fairway Solar Collector Substation. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of Interconnection Facilities. New right-of-way (“ROW”) A 100’ wide ROW will be required for the construction, operation, and maintenance of the Line 6 Tap and must accommodate the 125’ x 125’ work pads will be required for the installation of the each new structuresstructure. The Interconnection Customer is responsible for obtaining the property/easements needed for the tap line, access roads to/from the tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards And Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019). The Interconnection Customer is also responsible for all permitting. The Interconnection Customer’s takeoff structure for the Line 6 Tap shall be designed in accordance with the requirements set forth in the Project Specific Specifications. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of Connecting Transmission Owner’s Interconnection Facilities.
Appears in 1 contract
Samples: Service Agreement
Interconnection Customer’s Scope of Work and Responsibilities. The Interconnection Customer shall will design, procure, construct, install, own, operate and maintain the Interconnection Customer’s Interconnection Facilities and Collection Feeder Lines in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT or applicable NYISO Procedures: NYISO requirements, industry standards and specifications specifications, regulatory requirements, the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specificationsxxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric-Specifications, the Connecting Transmission Owner’s System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Fairway Albany County 1 Solar Project (Queue #570) provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), and Good Utility Practice. The Interconnection Customer All protection scheme design drawings and relay settings shall submit all engineering design and electrical specifications associated with be prepared by the Interconnection Customer’s Interconnection Facilities NYS licensed professional engineer, and the design and equipment specifications shall be provided to the Connecting Transmission Owner for its review review, comment and acceptance acceptance, prior to application and testing in accordance with the ESBs ESBs. The Interconnection Customer will mount the CT/PT units and Project Specific Specificationsinstall the meter socket enclosure provided by Connecting Transmission Owner, make grounding connections, and complete all primary wiring. The Interconnection Customer shall install a meter panel in accordance with provide On/Off switches for the DTT schemes. The Interconnection Customer is responsible for ordering the fiber facility required at the Albany 1 Collector Substation. The Interconnection Customer shall construct the following portions of the Connecting Transmission Owner’s Interconnection Facilities as stated above and per the Project Specific Specifications and the ESB 756A. As per ESB 756A, the ESBs: • The Interconnection Customer shall will provide 115kV line protection to remove the generation for faults on Long Lane – LaFarge Line 6 and redundant distance relaying. • The Interconnection Customer will install the RTU provided by Connecting Transmission Owner as per Connecting Transmission Owner’s ESB 752, indoors and within 15 feet of the meter(s), and remote from: • o heavy traffic areas, work areas, and loading areas; • o heat producing or high electrostatic or electromagnetic field producing equipment; and • o station batteries. • The Interconnection Customer shall will install conduit for the wiring from the instrument transformers an Ethernet communications link to the meter equipment panel and meter socket in accordance with RTU for transmitting the ESBs and metering data to the Project Specific SpecificationsRTU. The Interconnection Customer is responsible for ordering the fiber facility required at the Fairway Solar Collector Substation. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of Interconnection Facilities. New right-of-way (“ROW”) A 100’ wide ROW will be required for the construction, operation, and maintenance of the Line 6 Tap and must accommodate the 125’ x 125’ work pads will be required for the installation of the each new structuresstructure. The Interconnection Customer is responsible for obtaining the property/easements needed for the tap line, access roads to/from the tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards And Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (January 2019). The Interconnection Customer is also responsible for all permitting. The Interconnection Customer’s takeoff structure for the Line 6 Tap shall be designed in accordance with the requirements set forth in the Project Specific Specifications. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of Connecting Transmission Owner’s Interconnection Facilities.
Appears in 1 contract
Interconnection Customer’s Scope of Work and Responsibilities. The Interconnection Customer shall design, procure, construct, install, own, operate operate, and maintain the Interconnection Customer’s Interconnection Facilities in accordance with the following requirements, to the extent not inconsistent with the terms of this Agreement, the ISO OATT OATT, or applicable NYISO Proceduresprocedures: NYISO the NYISO’s requirements, ; industry standards and specifications specifications; regulatory requirements, ; the Connecting Transmission Owner’s applicable Connecting Transmission Owner’s Electric System Bulletins (“ESBs”), provided at the following website: xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric- Specifications, xxxxx://xxx.xxxxxxxxxxxxxx.xxx/ProNet/Technical-Resources/Electric-Specifications; the Connecting Transmission Owner’s System Protection and Interconnection Customer Attachment Facilities Electric Installation Specification for Fairway the Hilltop Solar Project (“Project Specific Specifications”) provided as Appendix C to the Facilities Study for the Small Generating Facility (“Project Specific Specifications”), Facility; and Good Utility Practice. The Interconnection Customer shall submit all engineering design and electrical specifications associated with Interconnection Customer’s Interconnection Facilities to the Connecting Transmission Owner for its review and acceptance in accordance with the ESBs and Project Specific Specifications. The Interconnection Customer shall install a meter panel in accordance with the Project Specific Specifications and the ESB 756A. As per ESB 756A756A and the Project Specific Specifications, the Interconnection Customer shall install mount the RTU cabinet indoors and within 15 feet of the meter(s), and remote from: • heavy traffic areas, work areas, and loading areas; • heat producing or high electrostatic or electromagnetic field producing equipment; and • station batteries. The Interconnection Customer shall install conduit for the wiring from the instrument transformers to the meter equipment panel and meter socket in accordance with the ESBs and the Project Specific Specifications. The Interconnection Customer is responsible for ordering the fiber facility required at the Fairway Solar Collector Substation. Upon termination of this Agreement, Interconnection Customer shall be responsible for all costs associated with the decommissioning and removal of Interconnection Facilities. New right-of-way (“ROW”) will be required for the construction, operation, and maintenance of the Line 6 Tap tap line and must accommodate the 125’ x 125’ work pads (temporary) required for the installation of the new structures. The Interconnection Customer is responsible for obtaining the property/easements needed for the tap line, access roads to/from the tap, and work pads, in accordance with the standards set forth in the Connecting Transmission Owner’s Standards And and Requirements Relating to Third Party Acquisition and Transfer of Real Property Interests to Niagara Mohawk Power Corporation for Electric Facilities and Survey Specifications (Specifications, dated January 2019). The Interconnection Customer is also responsible for all permitting. The Upon termination of the Agreement, Interconnection Customer’s takeoff structure Customer shall be designed in accordance responsible for all costs associated with the requirements set forth in decommissioning and removal of the Project Specific SpecificationsConnecting Transmission Owner’s Interconnection Facilities.
Appears in 1 contract