Common use of Interconnection Request Clause in Contracts

Interconnection Request. 1.3.1 The Interconnection Customer shall submit its Interconnection Request to the Utility, and the Utility shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- stamped upon receipt of the following: 1.3.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 submitted by a valid legal entity registered with the South Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 The applicable fee or Interconnection Request deposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or fail the Fast Track screens and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit is required in addition to any fee previously paid. The Interconnection Request deposit shall equal $10,000 plus $1 per kWac of capacity specified in the Interconnection Request Application Form. The Interconnection Request deposit is intended to cover the Utility’s reasonably anticipated costs for conducting the System Impact Study and the Facilities Study. Such deposit shall, however, be applicable towards the cost of all studies, Upgrades and Interconnection Facilities. 1.3.1.3 Demonstration of site control as defined in Section 1.5. 1.3.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 The Utility shall notify the Interconnection Customer within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 through 1.

Appears in 5 contracts

Samples: Generator Interconnection Agreement, Generator Interconnection Agreement, Generator Interconnection Procedures

AutoNDA by SimpleDocs

Interconnection Request. 1.3.1 1.5.1 The Interconnection Customer shall submit its Interconnection Request to the Utility, and the Utility shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- stamped upon receipt of the following: 1.3.1.1 1.5.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 2 submitted by a valid legal entity registered with the South North Carolina Secretary of State, State and signed by the Interconnection Customer. 1.3.1.2 1.5.1.2 The applicable fee or Interconnection Request depositDeposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all other Generating Facilities Facilities, including those that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or that fail the Fast Track screens and Supplemental Review Process under Section 3.0 and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit Deposit is required in addition to any fee previously paidrequired. The Interconnection Request deposit Deposit for Interconnection Customers to be evaluated under the Section 4 Study Process shall equal equal: (1) $10,000 20,000 plus one dollar ($1 1.00) per kWac of capacity specified in the Interconnection Request Application FormForm for all Interconnection Requests that are less than 20 MW; (2) $35,000 plus one dollar ($1.00) per kWac for Interconnection Requests that are between 20 MW and 50 MW; and (3) $50,000 plus one dollar ($1.00) per kWac for all Interconnection Requests greater than 50 MW. The Interconnection Request deposit Deposit is intended to cover the Utility’s reasonably anticipated costs including overheads for conducting the System Impact Study and the Facilities Study. Such In addition, such deposit shall, however, shall be applicable towards the Utility’s cost of all studies, administering the generator interconnection process under the Revised Standard as well as any Upgrades and Interconnection Facilities, including overheads, under a future Interconnection Agreement (if applicable). 1.3.1.3 Demonstration of site control as defined in Section 1.51.5.1.3 A Site Control Verification letter (sample included within Attachment 2). 1.3.1.4 1.5.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 1.5.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 1.5.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 1.5.2 The original date- and time--time stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time--time stamp for the purposes of establishing Queue Position and any timetable in these procedures. Where a Utility is administering a Definitive Interconnection Study Process, an Interconnection Customer wishing to join the next Definitive Interconnection System Impact Study (DISIS) Cluster shall submit its Interconnection Request to the Utility within, and no later than the close of the DISIS Request Window established in Section 4.4.1. 1.3.3 1.5.3 The Utility shall notify the Interconnection Customer in writing within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 1.5.1.1 through 11.5.1.6 are complete or incomplete. An Interconnection Request will be deemed complete upon submission of the listed information in Section 1.5.1 to the Utility. 1.5.4 If the Interconnection Request Application Form and/or the initial supporting documentation or any other information requested by the Utility is incomplete, the Utility shall provide, along with notice that the information is incomplete, a written list detailing all information that must be provided. The Interconnection Customer will have ten (10) Business Days after receipt of the notice to submit the listed information. If the Interconnection Customer does not provide the listed information or a written request for an extension of time, not to exceed ten (10) additional Business Days, within the deadline, the Interconnection Request will be deemed withdrawn. 1.5.5 Where a Utility is administering a Definitive Interconnection Study Process, the Utility may request additional technical information from the Interconnection Customer as the Utility may reasonably determine is necessary, consistent with Good Utility Practice, to complete the DISIS. Where the Utility determines that the technical information provided in an Interconnection Request is not adequate to initiate the Definitive Interconnection Study Process, and requests that the Interconnection Customer provide supplemental information prior to the close of the initial Customer Engagement Window provided for in Section 4.4.1, the Utility shall provide a written list detailing the information that must be provided within ten (10) Business Days, where the Interconnection Customer’s failure to provide the information required by the Utility within the deadline will result in the Interconnection Request being deemed withdrawn.

Appears in 2 contracts

Samples: Interconnection Procedures, Interconnection Procedures

Interconnection Request. 1.3.1 The Interconnection Customer shall submit its Interconnection Request to the Utility, and the Utility shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- stamped upon receipt of the following: 1.3.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 submitted by a valid legal entity registered with the South Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 The applicable fee or Interconnection Request deposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or fail the Fast Track screens and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit is required in addition to any fee previously paid. The Where a Utility is administering a Section 4 serial Study Process pursuant to Section 1.6 and Section 4.3, the Interconnection Request deposit shall equal $10,000 plus $1 per kWac of capacity specified in the Interconnection Request Application Form. Where the Commission has authorized a Utility to administer a Cluster Study process pursuant to Section 4.1.1, the Interconnection Request deposit shall be prescribed in the Utility’s Appendix prescribing the terms and conditions for Interconnection Customers participating in the Cluster Study process. The Interconnection Request deposit is intended to cover the Utility’s reasonably anticipated costs for conducting the System Impact Study and the Facilities Study. Such In addition, such deposit shall, however, shall be applicable towards the Utility’s cost of all studiesadministering a Commission-authorized Cluster Study process, as well as any Upgrades and Interconnection FacilitiesFacilities under a future Interconnection Agreement (if applicable). 1.3.1.3 Demonstration of site control as defined in Section 1.5. 1.3.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. Where the Commission has authorized a Utility to administer a Cluster Study process pursuant to Section 4.1.1, the Utility’s Appendix for administering the Cluster Study process shall describe any additional requirements relating to the processing and Clustering of Interconnection Requests and eligibility for the Cluster Study process. 1.3.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 The Utility shall notify the Interconnection Customer within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 through 1.

Appears in 2 contracts

Samples: Generator Interconnection Agreement, Generator Interconnection Procedures

Interconnection Request. 1.3.1 1.4.1 The Interconnection Customer shall submit its Interconnection Request to the Utility, and the Utility shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- stamped upon receipt of the following: 1.3.1.1 1.4.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 2 submitted by a valid legal entity registered with the South North Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 1.4.1.2 The applicable fee or Interconnection Request depositDeposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all other Generating Facilities Facilities, including those that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or that fail the Fast Track screens and Supplemental Review Process under Section 3.0 and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit Deposit is required in addition to any fee previously paidrequired. The Interconnection Request deposit Deposit shall equal $10,000 20,000 plus one dollar ($1 1.00) per kWac of capacity specified in the Interconnection Request Application Form, not to exceed an aggregate Interconnection Request Deposit of $100,000. The Interconnection Request deposit Deposit is intended to cover the Utility’s reasonably anticipated costs including overheads for conducting the System Impact Study and the Facilities Study. Such deposit shall, however, be applicable towards the cost of all studies, Upgrades and Interconnection FacilitiesFacilities including overheads. 1.3.1.3 Demonstration of site control as defined in Section 1.51.4.1.3 A Site Control Verification letter (sample included within Attachment 2). 1.3.1.4 1.4.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 1.4.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 1.4.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 1.4.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 1.4.3 The Utility shall notify the Interconnection Customer in writing within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 1.4.1.1 through 11.4.1.6 are complete or incomplete. An Interconnection Request will be deemed complete upon submission of the listed information in Section 1.4.1 to the Utility. 1.4.4 If the Interconnection Request Application Form and/or the initial supporting documentation or any other information requested by the Utility is incomplete, the Utility shall provide, along with notice that the information is incomplete, a written list detailing all information that must be provided. The Interconnection Customer will have ten (10) Business Days after receipt of the notice to submit the listed information. If the Interconnection Customer does not provide the listed information or a written request for an extension of time, not to exceed ten (10) additional Business Days, within the deadline, the Interconnection Request will be deemed withdrawn.

Appears in 2 contracts

Samples: Interconnection Procedures, Interconnection Procedures

Interconnection Request. 1.3.1 The Interconnection Customer shall submit its Interconnection Request to the Utility, and the Utility shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- time-stamped upon receipt of the following: 1.3.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 submitted by a retail customer of the Utility or valid legal entity registered with the South Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 The applicable fee or Interconnection Request deposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under SC Generator Interconnection Procedures 5 Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities Facilities, including those that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or that fail the Fast Track screens screensand Supplemental Review Process under Section 3.0 and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit is required in addition to any fee previously paid. The Where a Utility is administering a Section 4 serial Study Process pursuant to Section 1.6 and Section 4.3, the Interconnection Request deposit shall equal $10,000 10,00020,000 plus $1 per kWac of capacity specified in the Interconnection Request Application Form. Where the Commission has authorized a Utility to administer a Cluster Study process pursuant to Section 4.1.1, the Interconnection Request deposit shall be prescribed in the Utility’s Appendix prescribing the terms and conditions for Interconnection Customers participating in the Cluster Study process. The Interconnection Request deposit is intended to cover the Utility’s reasonably anticipated costs including overheads for conducting the System Impact Study and the Facilities Study. Such In addition, such deposit shall, however, shall be applicable towards the Utility’s cost of all studiesadministering a Commission-authorized Cluster Study process, as well as any Upgrades and Interconnection FacilitiesFacilities including overheads under a future Interconnection Agreement (if applicable). 1.3.1.3 Demonstration of site control as defined in Section 1.5. 1.3.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 The original date- and time-stamp applied to the . CCEBA: Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp customers have been assigned very significant overhead charges for the purposes of establishing Queue Position and any timetable in these proceduresinterconnection process. Those charges need to be substantiated like other charges to customers. 1.3.3 The Utility shall notify the Interconnection Customer within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 through 1.

Appears in 1 contract

Samples: Generator Interconnection Procedures

Interconnection Request. 1.3.1 The Interconnection Customer shall submit its Interconnection Request to the Utility, and the Utility shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- stamped upon receipt of the following: 1.3.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 submitted by a valid legal entity registered with the South Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 The applicable fee or Interconnection Request deposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or fail the Fast Track screens and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit is required in addition to any fee previously paid. The Where a Utility is administering a Section 4 serial study process pursuant to Section 1.6 and Section 4.3, the Interconnection Request deposit shall equal $10,000 plus $1 per kWac of capacity specified in the Interconnection Request Application Form. Where the Commission has authorized a Utility to administer a Cluster Study process pursuant to Section 4.1.1, the Interconnection Request deposit shall be prescribed in the Utility’s Appendix prescribing the terms and conditions for Interconnection Customers participating in the Cluster Study Process. The Interconnection Request deposit is intended to cover the Utility’s reasonably anticipated costs for conducting the System Impact Study and the Facilities Study. Such In addition, such deposit shall, however, beshall be applicable towards the Utility’s cost of all studiesadministering a Commission- authorized Cluster Study process, as well as any Upgrades and Interconnection FacilitiesFacilities under a future Interconnection Agreement (if applicable). 1.3.1.3 Demonstration of site control as defined in Section 1.5. 1.3.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. Where the Commission has authorized a Utility to administer a Cluster Study Process pursuant to Section 4.1.1, the Utility’s Appendix for administering the Cluster Study Process shall describe any additional requirements relating to the processing and Clustering of Interconnection Requests and eligibility for the Cluster Study process. 1.3.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 The Utility shall notify the Interconnection Customer within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 through 11.3.1.6 are complete or incomplete. An Interconnection Request will be deemed complete upon submission of the listed information in Section 1.3.1 to the Utility, along with any supplemental information required by a Utility’s Appendix, where the Utility is authorized to administer a Cluster Study process. 1.3.4 If the Interconnection Request Application Form and/or the initial supporting documentation is incomplete, the Utility shall provide, along with notice that the information is incomplete, a written list detailing all information that must be provided. The Interconnection Customer will have ten (10) Business Days after receipt of the notice to submit the listed information. If the Interconnection Customer does not provide the listed information or a request for an extension of time, not to exceed ten (10) additional Business Days, within the deadline, the Interconnection Request will be deemed withdrawn.

Appears in 1 contract

Samples: Generator Interconnection Procedures

Interconnection Request. 1.3.1 ‌ 1.4.1 The Interconnection Customer shall will submit its Interconnection Request to the UtilityCooperative, and the Utility shall Cooperative will notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Requestreceipt. The Interconnection Request Application Form shall will be date- and time- stamped considered complete upon receipt of the following: 1.3.1.1 1.4.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 2 submitted by a valid legal entity registered with the South North Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 1.4.1.2 The applicable fee or Interconnection Request depositDeposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all ot h er Generating Facilities Facilities, including those that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or fail the Fast Track screens and Supplemental Review Process under Section 3 and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit Deposit is required in addition to any fee previously paidrequired. The Interconnection Request deposit shall Deposit will equal $10,000 20,000 plus one dollar ($1 1.00) per kWac of capacity specified in the Interconnection Request Application Form, not to exceed an aggregate Interconnection Request Deposit of $100,000. The Interconnection Request deposit Deposit is intended to cover the UtilityCooperative’s reasonably anticipated costs including overheads for conducting the System Impact Study and the Facilities Study. Such deposit shallwill, however, be applicable towards the cost of all studies, Upgrades and Interconnection FacilitiesFacilities including overheads. 1.3.1.3 Demonstration of site control as defined in Section 1.51.4.1.3 A Site Control Verification letter (see sample Attachment 10). 1.3.1.4 1.4.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 1.4.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 1.4.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 1.4.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 1.4.3 An Interconnection Request will be deemed complete upon submission of the listed information in Section 1.4.1 to the Cooperative. 1.4.4 If the Intercon nectio n Request Application Form and/or the initial supporting documentation or any other information requested by the Cooperative is incomplete, the Cooperative will provide , xx xxx with notice that the information is incomplete, a written lis t deta iling all informat ion that must be provided. The Utility shall notify Interconnect ion Customer will have ten ( 10) Days after r eceipt of th e notice to submit the listed information. If the Interconnection Customer within does not provide the listed information or a written request for an extension of time, not to exceed ten (10) Business Days of additional Days, within the receipt of deadline, the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 through 1will be deemed withdrawn.

Appears in 1 contract

Samples: Interconnection Procedures

Interconnection Request. 1.3.1 The Interconnection Customer shall submit its Interconnection Request to the UtilityAuthority, and the Utility Authority shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- stamped upon receipt of the following: 1.3.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 submitted by a valid legal entity registered with the South Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 The applicable fee or Interconnection Request deposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or fail the Fast Track screens and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit is required in addition to any fee previously paid. The Interconnection Request deposit shall equal $10,000 plus $1 per kWac of capacity specified in the Interconnection Request Application Form. The Interconnection Request deposit is intended to cover the UtilityAuthority’s reasonably anticipated costs for conducting the System Impact Study and the Facilities Study. Such deposit shall, however, be applicable towards the cost of all studies, Upgrades and Interconnection Facilities. 1.3.1.3 Demonstration of site control as defined in Section 1.5. 1.3.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 The Utility Authority shall notify the Interconnection Customer within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 through 1.

Appears in 1 contract

Samples: Generator Interconnection Procedures

Interconnection Request. 1.3.1 1.4.1 The Interconnection Customer shall submit its Interconnection Request to the Utility, and the Utility shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- stamped upon receipt of the following: 1.3.1.1 1.4.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 2 submitted by a valid legal entity registered with the South North Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 1.4.1.2 The applicable fee or Interconnection Request depositDeposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or fail the Fast Track screens and Supplemental Review Process under Section 3.0 and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit Deposit is required in addition to any fee previously paidrequired. The Interconnection Request deposit Deposit shall equal $10,000 20,000 plus one dollar ($1 1.00) per kWac of capacity specified in the Interconnection Request Application Form, not to exceed an aggregate Interconnection Request Deposit of $100,000. The Interconnection Request deposit Deposit is intended to cover the Utility’s reasonably anticipated costs for conducting the System Impact Study and the Facilities Study. Such deposit shall, however, be applicable towards the cost of all studies, Upgrades and Interconnection Facilities. 1.3.1.3 Demonstration of site control as defined in Section 1.51.4.1.3 A Site Control Verification letter (sample included within Attachment 2). 1.3.1.4 1.4.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 1.4.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 1.4.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 1.4.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 1.4.3 The Utility shall notify the Interconnection Customer within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 1.4.1.1 through 11.4.1.6 are complete or incomplete. An Interconnection Request will be deemed complete upon submission of the listed information in Section 1.4.1 to the Utility. 1.4.4 If the Interconnection Request Application Form and/or the initial supporting documentation is incomplete, the Utility shall provide, along with notice that the information is incomplete, a written list detailing all information that must be provided. The Interconnection Customer will have ten (10) Business Days after receipt of the notice to submit the listed information. If the Interconnection Customer does not provide the listed information or a request for an extension of time, not to exceed ten (10) additional Business Days, within the deadline, the Interconnection Request will be deemed withdrawn.

Appears in 1 contract

Samples: Interconnection Procedures

AutoNDA by SimpleDocs

Interconnection Request. 1.3.1 The Interconnection Customer shall submit its Interconnection Request to the Utility, and the Utility shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- stamped upon receipt of the following: 1.3.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 submitted by a valid legal entity registered with the South Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 The applicable fee or Interconnection Request deposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section ELECTRONICALLY FILED - 2019 April 22 5:05 PM - SCPSC - Docket # 2019-130-E - Page 9 of 115 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or fail the Fast Track screens and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit is required in addition to any fee previously paid. The Interconnection Request deposit shall equal $10,000 plus $1 per kWac of capacity specified in the Interconnection Request Application Form. The Interconnection Request deposit is intended to cover the Utility’s reasonably anticipated costs for conducting the System Impact Study and the Facilities Study. Such deposit shall, however, be applicable towards the cost of all studies, Upgrades and Interconnection Facilities. 1.3.1.3 Demonstration of site control as defined in Section 1.5. 1.3.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 The Utility shall notify the Interconnection Customer within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 through 1.

Appears in 1 contract

Samples: Generator Interconnection Procedures

Interconnection Request. 1.3.1 The Interconnection Customer shall submit its Interconnection Request to the Utility, and the Utility shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- stamped upon receipt of the following: 1.3.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 submitted by a valid legal entity registered with the South Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 The applicable fee or Interconnection Request deposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or fail the Fast Track screens and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit is required in addition to any fee previously paid. The Where a Utility is administering a Section 4 serial Study Process pursuant to Section 1.6 and Section 4.3, the ELECTRONICALLY FILED - 2020 November 17 4:39 PM - SCPSC - Docket # 2019-326-E - Page 11 of 196 DEC/DEP Application - Attachment 1 Docket No. 2019-326-E Interconnection Request deposit shall equal $10,000 plus $1 per kWac of capacity specified in the Interconnection Request Application Form. Where the Commission has authorized a Utility to administer a Cluster Study process pursuant to Section 4.1.1, the Interconnection Request deposit shall be prescribed in the Utility’s Appendix prescribing the terms and conditions for Interconnection Customers participating in the Cluster Study process. The Interconnection Request deposit is intended to cover the Utility’s reasonably anticipated costs for conducting the System Impact Study and the Facilities Study. Such In addition, such deposit shall, however, beshall be applicable towards the Utility’s cost of all studiesadministering a Commission- authorized Cluster Study process, as well as any Upgrades and Interconnection FacilitiesFacilities under a future Interconnection Agreement (if applicable). 1.3.1.3 Demonstration of site control as defined in Section 1.5. 1.3.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. Where the Commission has authorized a Utility to administer a Cluster Study process pursuant to Section 4.1.1, the Utility’s Appendix for administering the Cluster Study process shall describe any additional requirements relating to the processing and Clustering of Interconnection Requests and eligibility for the Cluster Study process. 1.3.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 The Utility shall notify the Interconnection Customer within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 through 1.

Appears in 1 contract

Samples: Generator Interconnection Procedures

Interconnection Request. 1.3.1 ‌ 1.4.1 The Interconnection Customer shall will submit its Interconnection Request to the UtilityCooperative, and the Utility shall Cooperative will notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Requestreceipt. The Interconnection Request Application Form shall will be date- and time- stamped considered complete upon receipt of the following: 1.3.1.1 1.4.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 2 submitted by a valid legal entity registered with the South North Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 1.4.1.2 The applicable fee or Interconnection Request depositDeposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 3 .1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or fail the Fast Track screens and Supplemental Review Process under Section 3 and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit Deposit is required in addition to any fee previously paidrequired. The Interconnection Request deposit shall Deposit will equal $10,000 20,000 plus one dollar ($1 1.00) per kWac of capacity specified in the Interconnection Request Application Form, not to exceed an aggregate Interconnection Request Deposit of $100,000. The Interconnection Request deposit Deposit is intended to cover the UtilityCooperative’s reasonably anticipated costs for conducting the System Impact Study and the Facilities Study. Such deposit shallwill, however, be applicable towards the cost of all studies, Upgrades and Interconnection Facilities. 1.3.1.3 Demonstration of site control as defined in Section 1.51.4.1.3 A Site Control Verification letter (see sample Attachment 10). 1.3.1.4 1.4.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 1.4.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 1.4.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 1.4.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 1.4.3 An Interconnection Request will be deemed complete upon submission of the listed information in Section 1.4.1 to the Cooperative. 1.4.4 If the Intercon nectio n Request Application Form and/or the initial supporting documentation are incomplete, the Cooperative will provide , xx xxx with notice that the information is incomplete, a written lis t deta iling all inform xxxxx that must be provided. The Utility shall notify Interconnect ion Customer will have ten ( 10) Business Days after receipt of th e notice to submit the listed information. If the Interconnection Customer within Cust omer does not provide the listed information or a request for an extension of time, not to exceed ten (10) additional Business Days of Days, within the receipt of deadline, the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 through 1will be deemed withdrawn.

Appears in 1 contract

Samples: Interconnection Procedures

Interconnection Request. 1.3.1 1.4.1 The Interconnection Customer shall will submit its Interconnection Request to the UtilityCooperative, and the Utility shall Cooperative will notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Requestreceipt. The Interconnection Request Application Form shall will be date- and time- stamped considered complete upon receipt of the following: 1.3.1.1 1.4.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 2 submitted by a valid legal entity registered with the South North Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 1.4.1.2 The applicable fee or Interconnection Request depositDeposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW kw reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 3. 1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities that do not qualify for the 20 kW kw Inverter Process or the Fast Track Process, or fail the Fast Track screens and Supplemental Review Process under Section 3.0 and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit Deposit is required in addition to any fee previously paidrequired. The Interconnection Request deposit shall Deposit will equal $10,000 20,000 plus one dollar ($1 1.00) per kWac of capacity specified in the Interconnection Request Application Form, not to exceed an aggregate Interconnection Request Deposit of $100,000. The Interconnection Request deposit Deposit is intended to cover the UtilityCooperative’s reasonably anticipated costs for conducting the System Impact Study and the Facilities Study. Such deposit shallwill, however, be applicable towards the cost of all studies, Upgrades and Interconnection Facilities. 1.3.1.3 Demonstration of site control as defined in Section 1.51.4.1.3 A Site Control Verification letter (sample included within Attachment 3). 1.3.1.4 1.4.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 1.4.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 1.4.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 1.4.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 1.4.3 An Interconnection Request will be deemed complete upon submission of the listed information in Section 1.4.1 to the Cooperative. 1.4.4 If the Intercon nectio n Request Application Form and/or the initial supporting documentation are incomplete, the Cooperative will provide , xx xxx with notice that the information is incomplete, a written lis t deta iling all information that must be provide d. The Utility shall notify Inte rconnect ion Customer will have ten ( 10 ) Business Days afte r receipt of th e notice to submit the listed information. If the Interconnection Customer within Cust omer does not provide the listed information or a request for an extension of time, not to exceed ten (10) additional Business Days of Days, within the receipt of deadline, the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 through 1will be deemed withdrawn.

Appears in 1 contract

Samples: Interconnection Procedures

Interconnection Request. 1.3.1 1.4.1 The Interconnection Customer shall submit its Interconnection Request to the Utility, and the Utility shall notify the Interconnection Customer confirming receipt of the Interconnection Request within three (3) Business Days of receiving the Interconnection Request. The Interconnection Request Application Form shall be date- and time- stamped upon receipt of the following: 1.3.1.1 1.4.1.1 A substantially complete Interconnection Request Application Form contained in Attachment 3 2 submitted by a valid legal entity registered with the South North Carolina Secretary of State, and signed by the Interconnection Customer. 1.3.1.2 1.4.1.2 The applicable fee or Interconnection Request depositDeposit. The applicable fee is specified in the Interconnection Request Application Form and applies to a certified inverter-based Generating Facility no larger than 20 kW reviewed under Section 2 and to any certified Generating Facility no larger than the capacity specified in Section 3.1 to be evaluated under the Section 3 Fast Track Process. For all Generating Facilities that do not qualify for the 20 kW Inverter Process or the Fast Track Process, or fail the Fast Track screens and Supplemental Review Process under Section 3.0 and are to be evaluated under the Section 4 Study Process, an Interconnection Request deposit Deposit is required in addition to any fee previously paidrequired. The Interconnection of this document. The Utilities Commission will need to provide parties with an opportunity to express their concerns or positions on this proposed revision. Please also refer to the end of Attachment 6 for related comments submitted by Yes Solar Solutions and IREC. which was not discussed by the working group during markup December proposal by Duke Energy, Request deposit Deposit shall equal $10,000 20,000 plus one dollar ($1 1.00) per kWac of capacity specified in the Interconnection Request Application Form, not to exceed an aggregate Interconnection Request Deposit of $100,000. The Interconnection Request deposit Deposit is intended to cover the Utility’s reasonably anticipated costs including overheads for conducting the System Impact Study and the Facilities Study. Such deposit shall, however, be applicable towards the cost of all studies, Upgrades and including overheads Interconnection FacilitiesFacilities . of this document. The Utilities Commission will need to provide parties with an opportunity to express their concerns or positions on this proposed revision. Please also refer to the end of Attachment 6 for related comments submitted by Yes Solar Solutions and IREC. which was not discussed by the working group during markup December proposal by Duke Energy, 1.4.1.3 A Site Control Verification letter (sample included within Attachment 2). 1.3.1.3 Demonstration of site control as defined in Section 1.5. 1.3.1.4 1.4.1.4 A site plan indicating the location of the project, the property lines and the desired Point of Interconnection. 1.3.1.5 1.4.1.5 An electrical one-line diagram for the Generating Facility. 1.3.1.6 1.4.1.6 Inverter specification sheets for the Interconnection Customer’s equipment that will be utilized, if applicable. 1.3.2 1.4.2 The original date- and time-stamp applied to the Interconnection Request Application Form shall be accepted as the qualifying date- and time-stamp for the purposes of establishing Queue Position and any timetable in these procedures. 1.3.3 1.4.3 The Utility shall notify the Interconnection Customer within ten (10) Business Days of the receipt of the Interconnection Request Application Form as to whether the Form and initial supporting documentation specified in Sections 1.3.1.1 1.4.1.1 through 11.4.1.6 are complete or incomplete. An Interconnection Request will be deemed complete upon submission of the listed information in Section 1.4.1 to the Utility. 1.4.4 If the Interconnection Request Application Form and/or the initial supporting documentation is incomplete, the Utility shall provide, along with notice that the information is incomplete, a written list detailing all information that must be provided. The Interconnection Customer will have ten (10) Business Days after receipt of the notice to submit the listed information. If the Interconnection Customer does not provide the listed information or a request for an extension of time, not to exceed ten (10) additional Business Days, within the deadline, the Interconnection Request will be deemed withdrawn.

Appears in 1 contract

Samples: Interconnection Procedures