Interface Connector Sample Clauses

Interface Connector. The custom BTO modules shall be designed to interface with the integrated USB 1.1 ports provided by the Intel 830M chipset. These modules shall interface with two (2) custom 10-pin header connectors provided in the BTO area of the tablet. The pinouts of these two (2) connectors shall be identical and shall conform to the requirements of Table 2-12. The custom module interface shall provide up to 300 ma. at 3.3 Vdc and up to 300 ma. at 5.0 Vdc to power the custom modules. The power connections shall be current limited and over voltage protected in accordance with the requirements of section 2.5.1.18.1. Table 2-12 — Custom BTO Connector Pinout No. Signal Description Tolerance Remarks 1 PWR3 +3.3 Vdc Power ±10% 2 PGND Power Ground
AutoNDA by SimpleDocs

Related to Interface Connector

  • Interfaces 1 2 wire i/f (towards PSTN) -------------------------------------------------------------------------------------------------------- 2 2 wire i/f (towards standard handset) -------------------------------------------------------------------------------------------------------- 2.2 FUNCTIONS -------------------------------------------------------------------------------------------------------- 1 Selective Call -------------------------------------------------------------------------------------------------------- 2 Conference Call (up to four participants) ----------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------- 3 MANAGEMENT COMMUNICATION -------------------------------------------------------------------------------------------------------- 3.1 COMMUNICATION INTERFACES see OPTera Product Description SEC. 5.2.3 - Standard Communications Interfaces and SEC.7.3 - Management Communication -------------------------------------------------------------------------------------------------------- 1 F- Interface (RS 232) -------------------------------------------------------------------------------------------------------- 2 Q- interface as gateway to the EMS -------------------------------------------------------------------------------------------------------- 3 Qecc Routing (2 level IS-IS) -------------------------------------------------------------------------------------------------------- 4 Q I/F (Ethernet) -------------------------------------------------------------------------------------------------------- 5 Optical Supervisory Channel ----------------------------------------------------------------------------------------------------------------------------------- 6 OSC - wavelength IR IR IR see OPTera Product - bitrate Description SEC. 5.2.2 - optical span limit - Per Wavelength - transmission protocol Optical Service Channel and SEC.7.3 - Management Communication ----------------------------------------------------------------------------------------------------------------------------------- ----------------------------------------------------------------------------------------------------------------------------------- 3.2 O & M INTERFACES ----------------------------------------------------------------------------------------------------------------------------------- 1 8 x Remote Control Inputs ----------------------------------------------------------------------------------------------------------------------------------- 2 Remote Control Outputs ----------------------------------------------------------------------------------------------------------------------------------- 3 Card LED support ----------------------------------------------------------------------------------------------------------------------------------- 4 Subrack LED support ----------------------------------------------------------------------------------------------------------------------------------- 5 Rack Alarm support ----------------------------------------------------------------------------------------------------------------------------------- -----------------------------------------------------------------------------------------------------------------------------------

  • Interconnection If Manager desires to interconnect a portion of the Service Area Network with another carrier and Sprint PCS can interconnect with that carrier at a lower rate, then to the extent permitted by applicable laws, tariffs and contracts, Sprint PCS may arrange for the interconnection under its agreements with the carrier and if it does so, Sprint PCS will xxxx the interconnection fees to Manager.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Network 2.7.1 DCH will provide to the Contractor up-to-date changes to the State’s list of excluded Providers, as well as any additional information that will affect the Contractor’s Provider network.

  • Programming Seller shall not make any material changes in the broadcast hours or in the percentages of types of programming broadcast by the Station, or make any other material change in the Station's programming policies, except such changes as in the good faith judgment of the Seller are required by the public interest.

  • Metering 1. If the Producer desires to sell electric power to the Company, the Company shall provide, own and maintain at the Producer's expense all necessary meters and associated equipment to be utilized for the measurement of energy and capacity for determining the Company's payment to the Producer pursuant to an applicable agreement.

  • Generator Subject to the provisions of this Section 29.36, Tenant shall be entitled to install, operate and maintain a generator and any other equipment related thereto, including, without limitation, a fuel system, wiring and shaft space (“Generator”) next to the Building at Tenant’s sole cost and expense (without paying any additional fee or rental to Landlord for the use thereof). Prior to the installation of the Generator, Tenant shall inspect the proposed location to determine a suitable location for the Generator, and Tenant shall submit written plans and specifications relative to the type, size and proposed location (including any proposed screening) of the Generator to Landlord for its review and written approval. Tenant shall be solely responsible for the cost of acquisition, installation, operation, and maintenance of the Generator; and Tenant shall install, maintain and operate the Generator in accordance with all federal, state, and local laws, statutes, ordinances, rules and regulations, including without limitation, obtaining and maintaining any and all permits, approvals and licenses required to install and operate the Generator by any governmental authority having jurisdiction. Landlord and Tenant agree that, upon the expiration of earlier termination of the Lease Term, Tenant shall not be required to remove the Generator, any associated cabling, wiring and screening or other improvements. Tenant shall not be entitled to grant or assign to any third party (other than a permitted assignee of Tenant’s rights under the Lease or a permitted subtenant relative to the Premises (or a portion thereof)) the right to use the Generator without Landlord’s prior written consent (which consent may be granted or withheld in Landlord’s discretion). Upon reasonable advance notice to Tenant (and provided Landlord reasonably coordinates with Tenant and provides an alternate source of backup generator capacity during said transition), Landlord shall be entitled to cause the Generator to be moved to another location near the Building, at Landlord’s cost and expense. Tenant shall pay all personal property taxes on the Generator. Tenant shall also pay any increases in the real property taxes of the Building due to the installation of the Generator within thirty (30) days of receipt of notice from Landlord which includes proof of such increase in taxes. Tenant’s indemnity obligations under Section 5.4.1.5 of the Lease, relating to the use of Hazardous Materials, shall apply to the use and operation of the Generator. Finally, Tenant’s insurance obligations under Section 10.3 of the Lease shall apply to the Generator.

  • User 4.9.1 Not to use the Property otherwise than for the Permitted Use;

  • ELECTRICAL SERVICES A. Landlord shall provide electric power for a combined load of 3.0 xxxxx per square foot of useable area for lighting and for office machines through standard receptacles for the typical office space.

  • Hardware “Hardware” means the hardware and other furniture, fixtures and equipment owned or leased and then currently being used by PROVIDER exclusively to perform the Services under any MOA or PSA or to support such performance. To the extent any such items are not used by PROVIDER exclusively to perform the Services, PROVIDER shall assist CUSTOMER or its designee in purchasing, leasing or otherwise obtaining the use of comparable items.

Time is Money Join Law Insider Premium to draft better contracts faster.