Intervals for Major Infrastructure Modifications. Where No Forecast is Provided – An unforecasted Collocation Application may require Qwest to complete major infrastructure modifications to accommodate CLEC’s specific requirements. Major infrastructure modifications that may be required include conditioning space, permits, DC Power Plant, Standby Generators, Heating, Venting or Air Conditioning Equipment. The installation intervals in Sections 8.4.2.4.3 through 8.4.2.4.4 may be extended, if required, to accommodate major infrastructure modifications. When major infrastructure modifications as described above are required, and if all of CLEC’s equipment is available at the Qwest Premises no later than sixty (60)) calendar days after receipt of the complete Collocation Application, Qwest shall propose to complete its installation of the Collocation arrangement within an interval of no more than one hundred and fifty (150) calendar days after receipt of the complete Collocation Application. The need for, and the duration of, an extended interval shall be provided to CLEC as a part of the quotation. CLEC may dispute the need for, and the duration of, an extended interval, in which case Qwest must request a waiver from the Commission to obtain an extended interval.
Appears in 3 contracts
Samples: Telecommunications, Telecommunications, Telecommunications
Intervals for Major Infrastructure Modifications. Where No Forecast is Provided – An unforecasted Collocation Application may require Qwest CenturyLink to complete major infrastructure modifications to accommodate CLEC’s specific requirements. Major infrastructure modifications that may be required include conditioning space, permits, DC Power Plantpower plant, Standby Generatorsstandby generators, Heatingheating, Venting venting or Air Conditioning Equipmentair conditioning equipment. The installation intervals in Sections 8.4.2.4.3 through 8.4.2.4.4 may be extended, if required, to accommodate major infrastructure modifications. When major infrastructure modifications as described above are required, and if all of CLEC’s 's equipment is available at the Qwest CenturyLink Premises no later than sixty fifty-three (60)53) calendar days Days after receipt of the complete Collocation Application, Qwest CenturyLink shall propose to complete its installation of the Collocation arrangement within an interval of no more than one hundred and fifty (150) calendar days Days after receipt of the complete Collocation Application. The need for, and the duration of, an extended interval shall be provided to CLEC as a part of the quotation. CLEC may dispute the need for, and the duration of, an extended interval, in which case Qwest CenturyLink must request a waiver from the Commission to obtain an extended interval.
Appears in 3 contracts
Samples: Interconnection Agreement, Interconnection Agreement, Interconnection Agreement
Intervals for Major Infrastructure Modifications. Where No Forecast is Provided – An unforecasted Collocation Application may require Qwest CenturyLink to complete major infrastructure modifications to accommodate CLEC’s specific requirements. Major infrastructure modifications that may be required include conditioning space, permits, DC Power Plantpower plant, Standby Generatorsstandby generators, Heatingheating, Venting venting or Air Conditioning Equipmentair conditioning equipment. The installation intervals in Sections 8.4.2.4.3 through 8.4.2.4.4 may be extended, if required, to accommodate major infrastructure modifications. When major infrastructure modifications as described above are required, and if all of CLEC’s 's equipment is available at the Qwest CenturyLink Premises no later than sixty fifty-three (60)53) calendar days Days after receipt of the complete Collocation Application, Qwest CenturyLink shall propose to complete its installation of the Collocation arrangement within an interval of no more than one hundred and fifty (150) calendar days Days after receipt of the complete Collocation Application. The need for, and the duration of, an extended interval shall be provided to CLEC as a part of the quotation. CLEC may dispute the need for, and the duration of, an extended interval, in which case Qwest must request a waiver from the Commission to obtain an extended interval.CenturyLink
Appears in 1 contract
Samples: Interconnection Agreement