Job Control. 1. The Engineer shall perform all sampling and testing of components and materials in accordance with the standard specifications, and all other standard and special specifications and special provisions applicable in this agreement. Meet the minimum sampling frequencies set out in the TxDOT 2016 Guide Schedule for Sampling and Testing for materials. The testing shall include the following materials and all the components of the materials listed: Asphalt, Concrete, Soils and Aggregates. The estimated number of samples and tests are based on quantities in the executed construction contract. a. The Engineer shall ensure the testing is completed and input into Site Manager. NOTE: The contractor is responsible for testing Item 360 Concrete Paving. In DocuSign Envelope ID: 359C6DDF-7AC5-4FB7-BF5A-CE9480013821 accordance with 2016 Guide Schedule, the Engineer shall mold and test two (2) cylinders for every 10 contractor job control tests. b. The Engineer shall provide certified personnel, outlined in their Quality Assurance and Quality Control (QA/QC) plan that are knowledgeable of all materials testing procedures. All personnel performing acceptance tests must provide certifications and must maintain the certifications throughout the project. The State reserves the right to require replacement of any technician during this contract if performance is determined to be unsatisfactory or the technician fails to maintain appropriate certifications. c. The Engineer shall provide technicians certified in accordance with TxDOT Quality Assurance Programs for Construction (QAP) or other State approved programs, such as the Texas Asphalt Pavement Association (TxAPA) for Hot Mix Asphalt, and the Soils and Base Certification Program, as listed below. d. The Engineer shall provide certified technicians to perform the following tests:
Appears in 1 contract
Samples: Contract for Engineering Services
Job Control. 1. The Engineer shall perform all sampling and testing of components and materials in accordance with the standard specifications, and all other standard and special specifications and special provisions applicable in this agreement. Meet the minimum sampling frequencies set out in the TxDOT 2016 2015 Guide Schedule for Sampling and Testing for materials. The testing shall include the following materials and all the components of the materials listed: Asphalt, Concrete, Soils and Aggregates. The estimated number of samples and tests are based on quantities in the executed construction contract.
a. i. The Engineer shall ensure the testing is completed and input or import results directly into Site Manager. NOTE: The contractor is responsible for testing Item 360 Concrete Paving. In DocuSign Envelope ID: 359C6DDF-7AC5-4FB7-BF5A-CE9480013821 accordance with 2016 Guide Schedule, the Engineer shall mold and test two (2) cylinders for every 10 contractor job control tests.
b. ii. The Engineer shall provide certified personnel, outlined in their Quality Assurance and Quality Control (QA/QC) plan that are knowledgeable of all materials testing procedures. All personnel performing acceptance tests must provide certifications and must maintain the certifications throughout the project. The State reserves the right to require replacement of any technician during this contract if performance is determined to be unsatisfactory or the technician fails to maintain appropriate certifications.
c. iii. The Engineer shall provide technicians certified in accordance with TxDOT Quality Assurance Programs for Construction (QAP) or other State approved programs, such as the Texas Asphalt Pavement Association (TxAPA) for Hot Mix Asphalt, and the Soils and Base Certification Program, as listed below.
d. iv. The Engineer shall provide certified technicians to perform the following tests:
Appears in 1 contract
Samples: Contract for Engineering Services
Job Control. 1. The Engineer shall perform all sampling and testing of components and materials in accordance with the standard specifications, and all other standard and special specifications and special provisions applicable in this agreement. Meet The Engineer shall meet the minimum sampling frequencies set out in the TxDOT 2016 Guide Schedule for Sampling and Testing for materials. The testing shall include the following materials and all the components of the materials listed: Asphalt, Concrete, Soils and Aggregates. The estimated number of samples and tests are based on quantities in the executed construction contract.
a. The Engineer shall ensure the testing is completed and input or import results directly into Site Manager. NOTENote: The contractor is responsible for testing Item 360 Concrete Paving. In DocuSign Envelope ID: 359C6DDF-7AC5-4FB7-BF5A-CE9480013821 accordance with 2016 Guide Schedule, the Engineer shall mold and test two (2) cylinders for every 10 contractor job control tests.
b. The Engineer shall provide certified personnel, outlined in their Quality Assurance and Quality Control (QA/QC) plan that are knowledgeable of all materials testing procedures. All personnel performing acceptance tests must provide certifications and must maintain the certifications throughout the project. The State reserves the right to require replacement of any technician during this contract if performance is determined to be unsatisfactory or the technician fails to maintain appropriate certifications.
c. The Engineer shall provide technicians certified in accordance with TxDOT Quality Assurance Programs for Construction (QAP) or other State approved programs, such as the American Concrete Association (ACI), Texas Asphalt Pavement Association (TxAPA) for Hot Mix Asphalt, and the Soils and Base Certification Program, as listed below.
d. The Engineer shall provide certified technicians to perform the following tests:
Appears in 1 contract
Samples: Contract for Engineering Services
Job Control. 1. The Engineer shall perform all sampling and testing of components and materials in accordance with the standard specifications, and all other standard and special specifications and special provisions applicable in this agreement. Meet the minimum sampling frequencies set out in the TxDOT 2016 2015 Guide Schedule for Sampling and Testing for materials. The testing shall include the following materials and all the components of the materials listed: Asphalt, Concrete, Soils and Aggregates. The estimated number of samples and tests are based on quantities in the executed construction contract.
a. The Engineer shall ensure the testing is completed and input or import results directly into Site Manager. NOTE: The contractor is responsible for testing Item 360 Concrete Paving. In DocuSign Envelope ID: 359C6DDF-7AC5-4FB7-BF5A-CE9480013821 accordance with 2016 Guide Schedule, the Engineer shall mold and test two (2) cylinders for every 10 contractor job control tests.
b. The Engineer shall provide certified personnel, outlined in their Quality Assurance and Quality Control (QA/QC) plan that are knowledgeable of all materials testing procedures. All personnel performing acceptance tests must provide certifications and must maintain the certifications throughout the project. The State reserves the right to require replacement of any technician during this contract if performance is DocuSign Envelope ID: DFD2CB09-ACAD-43E1-AA0B-1B396F9006CC determined to be unsatisfactory or the technician fails to maintain appropriate certifications.
c. The Engineer shall provide technicians certified in accordance with TxDOT Quality Assurance Programs for Construction (QAP) or other State approved programs, such as the Texas Asphalt Pavement Association (TxAPA) for Hot Mix Asphalt, and the Soils and Base Certification Program, as listed below.
d. The Engineer shall provide certified technicians to perform the following tests: