Jointing of Pipe Sample Clauses

Jointing of Pipe. General The pipes will be cleaned in the whole length with special care of the spigot and sockets on the inside/ outside to ensure that they are free from dirt and unwarranted projections. The whole of the pipes shall be placed in position singly and shall be laid true to profile and direction of slope indicated on longitudinal sections. The pipes shall be laid without deflection in a straight alignment between bends and between high and low points. Vertical and horizontal deflections between individual pipes need the approval of the Employer’s Representative . In no case the deflection shall be more than 75% of those recommended by the manufacturer. Laying and Jointing of DI Pipe Pipes should be lowered into the trench with tackle suitable for the weight of pipes. For smaller sizes, up to 250 mm nominal bore, the pipe may be lowered by the use of ropes. All construction debris should be cleared from the inside of the pipe either before or just after a joint is made. This is done by passing a pull-through in the pipe, or by hand, depending on the size of the pipe. All persons should vacate any section of trench into which the pipe is being lowered On gradients of 1:15 or steeper, precautions should be taken to ensure that the spigot of the pipe being laid does not move into or out of the socket of the laid pipe during the jointing operations. As soon as the joint assembly has been completed, the pipe should be held firmly in position while the trench is back filled over the barrel of the pipe. The designed anchorage shall be provided to resist the thrusts developed by internal pressure at bends, tees, etc. The assembly of the pipes shall be made as recommended by the pipe manufacturer and using the suitable tools. The socket and spigot ends of the pipes shall be brushed and cleaned. The chamfered surface and the spigot end of the pipe have to be coated with a suitable lubricant recommended by the manufacturer of the pipes. Oil, petroleum bound oils, grease or other material which may damage the rubber gasket shall not be used as lubricant. The rubber gasket shall be inserted into the cleaned groove of the socket. It has to be checked for correct positioning. The two pipes shall be aligned properly in the pipe trench and the spigot end shall be pushed axially into the socket either manually or with a suitable tool specially designed for the assembly of pipes and as recommended by the manufacturer. The spigot has to be inserted up to the insertion xxxx on th...
AutoNDA by SimpleDocs
Jointing of Pipe. All joint areas on the pipe shall be cleaned and free from irregularities before an attempt is made to make up any joints. Joints, when made, shall be done in the manner prescribed by the manufacturer of the pipe. In the case of rubber gasket joints, these joints shall be made up in accordance with the American Standard specifications for the jointing of cast iron pressure pipe and fittings including torque. ASA #A21.11 (AWWA #C111). Consult the Portland Water District for guidance in the proper selection of pipe gaskets in areas of contaminated soils. The Portland Water District reserves the right to specify the use of specialty gaskets, including nitrile and viton gaskets. In the case of flanged joints, flange faces shall be thoroughly cleaned before making up such joints, so that no paint globs or any other projections or rust or other foreign matter remain on the faces of the flanges and that they are smooth, clean iron. Bolts and nuts shall be tightened evenly, being tightened in pairs on opposite sides of the pipe, until all are equally torqued. When completely tightened, the bolts should be long enough so that all nuts are “full”. Solid long body sleeves per specifications shall be used when connecting new pipe of all sizes. When joining a new section of pipe to an existing section of unknown O.D., a “duo” sleeve shall be used for sizes up to and including 16”. The “duo” sleeve will accommodate the increased O.D. of older cast iron pipe. For connecting to a section of pipe with an unknown O.D. above 16”, an approved steel coupling may be used. The existing pipe O.D. shall be measured prior to ordering the coupling.

Related to Jointing of Pipe

  • Printing of Agreement The Employer and the Union will share equally the cost of printing sufficient copies of this Agreement for distribution by the Union. The content of the cover to this Agreement shall be determined by mutual agreement between the parties.

  • PRINTING OF AGREEMENTS 35.1 The Company will undertake the responsibility for the printing of the collective agreements as may be required from time to time and will absorb the cost of such printing. This will include the cost of printing updated pages.

  • Printing of Contract Each party agrees to assume the responsibility and associated costs of printing of their contract, unless the parties mutually agree to do otherwise.

  • Contract Negotiation Meetings 14.09 When operational requirements permit, the Employer will grant leave without pay to an employee for the purpose of attending contract negotiation meetings on behalf of the Alliance. Preparatory Contract Negotiation Meetings

  • Posting of Agreement 68.1 To ensure that the Parties are aware of the terms of the Agreement, and to assist in any resolution of a disputes or the avoidance thereof a copy of this Agreement shall be retained by the Employer at all times for ready access by any Employee on a project site or via access to the Employer’s intranet, and the Employer will provide a permanent copy for each Union Delegate or Employee representative and Health and Safety Representative on a project site.

  • Scheduling of Meetings Either party may request a meeting of the UFE- Management Committee by sending a written request, including a description of the issue(s) to be addressed, to the other party. When requested, a Committee meeting will be scheduled at a mutually acceptable time and place. The Committee will meet at least once per quarter; but additional meetings may be scheduled by mutual agreement.

  • Contract Negotiations Meetings Where operational requirements permit, the Employer will grant leave without pay to an employee for the purpose of attending contract negotiations meetings on behalf of the Institute.

  • Printing of Collective Agreement The Hospital and Union agree that the cost of printing the collective agreements will be shared equally between the parties. The Union will be responsible for having the collective agreements printed in booklet format within sixty (60) days of its signing by both parties.

  • Lobbying Activities - Standard Form - LLL No response Do not upload this form unless Vendor has reportable lobbying activities. There are Attributes entitled, “2 CFR Part 200 or Federal Provision - Xxxx Anti-Lobbying Amendment – Continued.” Properly respond to those Attributes and only upload this form if applicable/instructed. If upload is required based on your response to those Attributes, the Disclosure of Lobbying Activities – Standard Form - LLL must be downloaded from the “Attachments” section of the IonWave eBid System, reviewed, properly completed, and uploaded to this location.

  • Filing of Agreement Upon execution of this Agreement, it shall be filed with the appropriate state regulatory agency pursuant to the requirements of Section 252 of the Act. If the regulatory agency imposes any filing or public notice fees regarding the filing or approval of the Agreement, Carrier shall be responsible for publishing the required notice and the publication and/or notice costs shall be borne by Carrier.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!