LIGHTWEIGHT ROOF SCREEDS Sample Clauses

LIGHTWEIGHT ROOF SCREEDS. Roof screeds will be executed to the approval of the Specialist Roofing Sub-Contractor and will consist of cement, sand and pumice (1:3:7) finished with 6 mm layer of cement and sand (1:4) topping. Screeds shall not be laid in areas exceeding ten square metres during any period of 24 hours. As bays are formed xxxxxx strips must be used to retain the exposed edge of the screed. Screeds shall be finished to falls and currents to receive roofing.
AutoNDA by SimpleDocs

Related to LIGHTWEIGHT ROOF SCREEDS

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Basement Any leaks or evidence of moisture? Yes No Unknown Does Not Apply Comments:

  • Trench Rock Trench rock is defined as any material that must be removed from a trench that cannot be excavated with a hydraulic excavator having a bucket curling force rated at not less than 18,300 pounds (Caterpillar Model 215 or equivalent) and occupies an original volume of at least one-half cubic yard.

  • Porcupine Site Highway 11

  • Geometric visibility The visibility of the illuminating surface, including its visibility in areas which do not appear to be illuminated in the direction of observation considered, shall be ensured within a divergent space defined by generating lines based on the perimeter of the illuminating surface and forming an angle of not less than 5° with the axis of reference of the headlamp. The origin of the angles of geometric visibility is the perimeter of the projection of the illuminating surface on a transverse plane tangent to the foremost part of the lens of the headlamp.

  • Power System Stabilizers The Developer shall procure, install, maintain and operate Power System Stabilizers in accordance with the requirements identified in the Interconnection Studies conducted for Developer’s Large Generating Facility. NYISO and Connecting Transmission Owner reserve the right to reasonably establish minimum acceptable settings for any installed Power System Stabilizers, subject to the design and operating limitations of the Large Generating Facility. If the Large Generating Facility’s Power System Stabilizers are removed from service or not capable of automatic operation, the Developer shall immediately notify the Connecting Transmission Owner and NYISO. The requirements of this paragraph shall not apply to wind generators.

  • Developer and Connecting Transmission Owner agree to report to each other in writing as soon as practical all accidents or occurrences resulting in injuries to any person, including death, and any property damage arising out of this Agreement.

  • Bicycles Bicycles or other vehicles shall not be permitted anywhere inside or on the sidewalks outside of the Building, except in those areas designated by Landlord for bicycle parking.

  • Pavement The combined surface course, base course, and subbase course, if any, considered as a single unit.

Time is Money Join Law Insider Premium to draft better contracts faster.