Loss of Building Efficiency Due to Take of Expansion Site Sample Clauses

Loss of Building Efficiency Due to Take of Expansion Site. Sound Transit acknowledges that use of the Xxxxx site will restrict the University’s ability to expand Xxxxx Xxxx. Sound Transit agreed to pay for a study to assess the increased cost of the Xxxxx Xxxx expansion project caused by Sound Transit’s project. The parties agree that the increased cost based on current zoning requirements is $1,400,000 damages to building development potential. Sound Transit agrees to pay this amount to the University by the date for possession and use under Article V of this Agreement. The parties acknowledge that any compensation provided herein may not be an eligible Federal project cost. However, Sound Transit’s responsibilities to the University under this section are not diminished or negated if this compensation is deemed by FTA not to be an eligible Federal project cost. Sound Transit has expressed an interest in supporting a height increase at the Xxxxx expansion site to create more development capacity. At this point, a height increase is speculative, because it would require action by the City of Seattle. There is insufficient information to pursue this height increase issue at this time. Further consideration is needed in order to determine the feasibility and desirability of a height increase. The increase under consideration should raise the height limit from 65 feet to 90 feet for the Xxxxx expansion site, and should be a transferable development right that could be used elsewhere within the campus zone containing Xxxxx Xxxx.
AutoNDA by SimpleDocs

Related to Loss of Building Efficiency Due to Take of Expansion Site

  • DAMAGE TO COUNTY FACILITIES, BUILDINGS OR GROUNDS 8.16.1 The Contractor shall repair, or cause to be repaired, at its own cost, any and all damage to County facilities, buildings, or grounds caused by the Contractor or employees or agents of the Contractor. Such repairs shall be made immediately after the Contractor has become aware of such damage, but in no event later than thirty (30) days after the occurrence.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • CONSTRUCTION OF THE BUS TERMINAL 12.1 Obligations prior to commencement of construction Prior to commencement of Construction Works, the Concessionaire shall:

  • Union Activity on Premises and/or Access to Premises The Union agrees that neither it, nor its officers, agents, representatives and members will engage in the solicitation of members, holding of meetings or any other Union activities on Hospital premises or on Hospital time without the prior approval of the Hospital, except as specifically provided for in this Agreement. Such approval will not be unreasonably denied.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Sub-loop that may diminish the capability of the Loop or Sub-loop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, but are not limited to, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the XxxxXxxxx XX 00000.

  • Condition of the Contractor’s Property or Equipment The Contractor shall make the Property and/or equipment available to the Judicial Council, pursuant to the terms and conditions set forth in this Agreement. The Contractor shall immediately remedy any problem with the Property’s physical plant or equipment that impairs or diminishes the quality of the Program. The Contractor shall ensure the appropriate hot water, heating, and ventilation is provided at the Property during the Program, inclusive in the prices set forth herein.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.