Mechanical Plant Operators (Plus Rates Clause Samples

Mechanical Plant Operators (Plus Rates. These operatives shall be paid the basic plain time rate for labourers together with the following rates: - Category of Operatives Hourly Rate 20/07/18 £ p 20/07/19 £ p Power-Driven Tools Operative using Power-driven Tools such as Breakers, Percussive Drills, Picks and Spades, Rammers 0.51 0.53 Category of Operatives Hourly Rate 20/07/18 £ p 20/07/19 £ p Compressors Mobile or portable Air Compressor, Operator of 0.54 0.56 Mobile Cranes Self-propelled Mobile Crane on Road wheels or Caterpillar tracks including Lorry mounted: capacity up to and including 2 tons 0.84 0.87 All other mobile cranes 2.44 2.53 Dumpers Over 0.8 cu metres up to and including 3.85 cu metres struck capacity 0.54 0.56 Demolition Rigged Excavators Category A - Materials processing. 0.84 0.87 Category B – Demolishing < 15 m. 1.34 1.39 Category C – Demolishing < 30 m. 1.71 1.77 Category D – All heights 1.98 2.05 Operative attending Cranes or Excavators (Banksman) 0.51 0.53 Front-End Shovels Up to and including 0.8 cu metres. Over 2.3 cu metres up to and including. 1.72 1.78 Drivers of lorries shall be paid the following hourly rates: From 20/07/18 From 20/07/19 Class 1 £12.78 £13.23 Class 2 £12.02 £12.44 Class 3 £11.27 £11.66

Related to Mechanical Plant Operators (Plus Rates

  • Current Operating Areas Where logging or road construction is in progress but not completed, unless agreed otherwise, Purchaser shall, before opera- tions cease annually, remove all temporary log culverts and construct temporary cross drains, drainage ditches, dips, berms, culverts, or other facilities needed to control erosion.

  • Condition of the Contractor’s Property or Equipment The Contractor shall make the Property and/or equipment available to the Judicial Council, pursuant to the terms and conditions set forth in this Agreement. The Contractor shall immediately remedy any problem with the Property’s physical plant or equipment that impairs or diminishes the quality of the Program. The Contractor shall ensure the appropriate hot water, heating, and ventilation is provided at the Property during the Program, inclusive in the prices set forth herein.

  • Connecting Transmission Owner’s Scope of Work and Responsibilities The Connecting Transmission Owner will design, construct, own, operate and maintain all Connecting Transmission Owner’s Interconnection Facilities, except as otherwise stated above and in the Project Specific Specifications. The Connecting Transmission Owner will complete all engineering reviews, field verifications and witness testing, etc. in accordance with the ESBs and the Project Specific Specifications. Connecting Transmission Owner shall provide the revenue metering CT/PT units and meter socket enclosure. The Connecting Transmission Owner shall: • provide, run, and wire both ends of the color-coded cable for the revenue metering instrument transformer secondary wiring; • perform all terminations; and • supply and install the meter. The revenue meter may require a communications link to the RTU. The Connecting Transmission Owner will specify and run those communications cables. The Connecting Transmission Owner shall complete all wiring, testing and commissioning of the RTU.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to Covista.

  • Contractor’s Equipment The Contractor shall be responsible for all Contractor’s Equipment. The Contractor’s Equipment shall be deemed to be exclusively intended for the execution of the Works.

AI Assistant