Mechanical Services Clause Samples

The Mechanical Services clause defines the scope and standards for the installation, maintenance, and operation of mechanical systems within a project, such as heating, ventilation, air conditioning, and plumbing. It typically outlines the responsibilities of the contractor regarding compliance with technical specifications, safety codes, and performance requirements, and may specify the types of equipment to be used or the procedures for testing and commissioning systems. This clause ensures that all mechanical work meets agreed-upon quality and safety standards, thereby reducing the risk of system failures and disputes over performance.
Mechanical Services. Plumbing - Checking availability of water and informing concerned authorities for further action. • Water Pumps & Hydro Pneumatic System – Operations and minor service of pumps like greasing, checking alignment, tightening & replacement of gland packing, cleaning strainers. • All Drainage System – Checking and clearing drains choke ups. • Replacement of washers, taps & other fittings. • Minor repairs to all Plumbing accessories. • Carpentry - Repairing creaky doors, repairs of the floor springs, door closures, minor woodwork and polishing/painting jobs & lamination, fixing of paintings. Repair of the furniture and chairs
Mechanical Services. Equipment and operation 1 year 1 year General mechanical installation 2 years 2 years Heat pump - indoor and outdoor units 5 years 2 years Boiler 5 years 2 years Pumps 5 years 2 years Building management system 2 years 2 years Radiators 20 years 2 years Fans 5 years 2 years Underfloor heating - piped 25 years 25 years Dust extraction unit 2 years 2 years Spray booth unit 2 years 2 years Compressed air system unit 2 years 2 years Aluminium windows and doors 5 years 2 years Steel windows and doors 5 years 2 years Fluoropolymer coating 10 years N/A Polyester coating 10 years N/A Anodising 10 years N/A Fabrication 10 years 2 years Operable Walls 1 year 1 year Exterior painting 5 years 2 years Interior painting 5 years 2 years Protective coatings to steelwork 6 years 3 years Intumescent coatings to steelwork 6 years 2 years Anti-Graffiti 5 years 2 years General plumbing installation 2 years 2 years Hot water cylinders 4 years 1 year Boiling water units 3 years 1 year Solar water heating collectors 3 years 1 year Compact laminate partitions 10 years 2 years Hardware items 2 years 2 years Commercial door unit 1 year 1 year Profiled metal roofing 15 years 5 years Metal roofing coating system 15 years N/A Modified bitumen membrane 15 years 5 years Synthetic plastic sheet membrane 15 years 5 years Translucent plastic roofing 15 years 5 years 7 years 7 years 5 years 1 year Retaining walls - concrete, timber Retaining walls - proprietary Paving Asphalt paving Irrigation systems Synthetic sports surface Fencing 10 years 15 years 5 years 5 years 5 years 7 years 5 years 5 years 5 years 1 year 3 years 3 years 3 years 5 years Grid Acoustic panels 15 years 15 years Tanking membrane Wall and floor tiling Waterproofing membrane Blinds Curtains Roofing underlays 15 years 5 years Cappings and flashings 15 years 5 years Rainwater systems - metal 10 years 3 years Skylights and operating system 10 years 5 years Walkways / platforms / stairs 15 years 2 years Roof hatch 10 years 2 years Exterior Interior 10 years 10 years Signage 3 years 3 years 20 years 5 years 5 years 15 years 2 years 5 years 3 years 3 years N/A N/A
Mechanical Services. Unless otherwise indicated on the drawings, all bends, branches, tees, expansion, contraction, change shape pieces and other fittings shall conform to the BS and other best practice codes. All pipework shall be installed in accordance with the arrangement drawings prepared for tender purposes, which are diagrammatic only. Due allowance shall be made for their diagrammatic nature in the interpretation of their intent when constructing and installing the pipework.
Mechanical Services. 2.3.1 It is assumed that the building has been fitted out with base mechanical services to a shell and core specification as defined in the British Council for Offices Guide 2009. 2.3.2 The mechanical installation is to be fully designed in accordance with current Building Regulations requirements, good practice guidance and other relevant statutory legislation in operation at the time of the works. 2.3.3 All office areas are to have an independently controlled low temperature hot water flat panel steel radiator system. In addition office areas are to have 6 no. ceiling mounted comfort cooling cassette units evenly distributed across the floorplate. Mechanical services are to be inclusive of all connections to existing services and provision of additional components where necessary in connection with the installation over and above that provided by the mechanical and electrical shell and core specification. The installation is to be designed for a normal office loading of 120W/m2, or the relevant equivalent recommended by good practice and appropriate guidelines at the time of the works.
Mechanical Services. ▪ 4892 Computer Aided Drafting - Statement of Attainment (AQF) ▪ 7773 Computer Aided Drafting - Statement of Attainment (AQF) ▪ 9879 Detail Drafting - Diploma (AQF) ▪ 8256 Detail Drafting and Cad - Certificate III (AQF) ▪ 9976 Detail Drafting Concepts - Certificate II (AQF) ▪ 3442 Drafting Trades - Certificate III (AQF) ▪ 9325 Engineering (Non-Destructive Testing) - Diploma (AQF) ▪ 9975 Engineering - Diploma (AQF) ▪ 9324 Engineering - Higher Engineering Trade (N.D.T.) - Certificate IV (AQF) ▪ 2878 Engineering - Mechanical Trade (Locksmithing) - Certificate III (AQF) ▪ 3452 Engineering - Mechanical Trade (Toolmaking) - Certificate III (AQF) ▪ 6888 Engineering - Mechanical Trade (Watchmaking) - Certificate III (AQF) ▪ 3448 Engineering - Mechanical Trade - Certificate III (AQF) ▪ 6898 Engineering - Refresher - Graduate Certificate (AQF) ▪ 300 Engineering - Technician - Certificate III (AQF) ▪ 6899 Engineering - Technician - Certificate III (AQF) ▪ 9236 Engineering Project Management - Statement of Attainment (AQF) ▪ 7750 Fluid Power Control - Statement of Attainment (AQF) - TAFE PLUS ▪ 9235 Maintenance Management - Statement of Attainment (AQF) ▪ 9878 Maintenance Management - Statement of Attainment (AQF) ▪ 9877 Manufacturing and Engineering - Statement of Attainment (AQF) ▪ 9885 Manufacturing Technology - Diploma (AQF) ▪ 6459 Mechanical Design - Statement of Attainment (AQF) ▪ 9895 Mechanical Engineering - Advanced Diploma (AQF) ▪ 9881 Mechanical Engineering - Diploma (AQF) ▪ 9894 Mechanical Technology - Advanced Diploma (AQF) ▪ 9240 Mechatronics - Advanced Diploma (AQF) ▪ 9893 Naval Architecture - Advanced Diploma (AQF) ▪ 9883 Naval Architecture - Diploma (AQF) ▪ 9892 Naval Architecture Technology - Advanced Diploma (AQF) ▪ 9323 Non-Destructive Testing - Statement of Attainment (AQF) ▪ 9322 Non-Destructive Testing - TAFE Statement ▪ 6896 Steam Plant Operation - TAFE Statement
Mechanical Services. A. In addition to the above-detailed equipment, the Contractor shall provide the mechanical services including, but not limited to, the following list of services: • 24/7 HVAC and mechanical repair and support services. • HVAC Sheet Metal services. • HVAC Installation services. • Chiller service and preventative maintenance (possible future equipment).
Mechanical Services. All Central Plant as documented on the above referenced Masterplans are to be installed. Mechanical services (HVAC) primary distribution ductwork and equipment shall be installed. Flexible branch ducts and grilles are deleted.
Mechanical Services. (See ▇▇▇▇▇ ▇▇▇▇▇ spec. attached but adjusted for open plan office accommodation throughout)
Mechanical Services. Services required include, but are not limited to: 5.1.1. General mechanical repairs 5.1.2. Air conditioning systems 5.1.3. Brake systems and components 5.1.4. Front end, chassis & wheel alignment 5.1.5. Cooling system repairs 5.1.6. Electrical repairs 5.1.7. Emission repairs 5.1.8. Exhaust repairs 5.1.9. Transmission repairs 5.1.10. Radiator repairs 5.1.11. Vehicle accessories installation
Mechanical Services. This Job Order Contract (JOC) for Mechanical Services (hereinafter referred to as “Contract”) is made and entered into as of the date fully executed by and between County of Orange, a political subdivision of the State of California, (hereinafter referred to as “County”) and ABM Building Solutions, LLC (hereinafter referred to as “Contractor”), which are sometimes individually referred to as “Party”, or collectively referred to as “Parties”.