Construction Methods 3.1 The Contractor shall provide all tools, equipment, materials, labor and work for the excavation and removal of the unsuitable subgrade soils and their subsequent replacement with the specified backfill soils as directed by the Owner’s representative. All work under this item shall be performed in a safe and workmanlike manner. 3.2 All work shall be performed in accordance with DelDOT Standard Specifications Section 821. 3.3 Following the removal of existing pavements, the Owner’s representative will review the exposed subgrade and provide recommendations for the undercutting of unsuitable subgrade materials as required. The depth and extent of undercut excavation, if required, will be determined by the Owner’s representative at the time of excavation. 3.4 All excavated materials shall become the property of the Contractor and be removed from the site at the completion of the project at no additional expense to the Owner. 3.5 Undercut excavations should be backfilled with graded aggregate. Backfill shall be placed in loose lifts not exceeding 8 inches thick. Each lift should be compacted with at least 3 passes of a minimum 5-ton, walk-behind or self-propelled vibratory roller when the size of the area permits, or with a vibrating plate mechanical compactor for smaller areas. Lift thickness shall be reduced to 6 inch loose lift when using a vibratory plate compactor. 3.6 The Contractor shall take precautions as necessary to minimize the potential for disturbance or softening of the pavement subgrade materials from inclement weather or construction traffic. As a minimum, this shall include the placement of backfill on the same day as the excavation. Any soft areas which develop shall be undercut and replaced with graded aggregate at no additional cost to the Owner. 3.7 Where undercutting is performed, the geotextile fabric shall be installed. The fabric should be pulled tight and lapped a minimum of 12 inches.
Hot Weather Guidelines For the purposes of site based discussions regarding the need to plan and perform work during expected periods of hot weather, the following issues shall be considered in conjunction with proper consideration of Occupational Health and Safety issues.
Alternative Resolution Methods Any time during the grievance process, by mutual consent, the parties may use alternative methods to resolve the dispute. If the parties agree to use alternative methods, the time frames in this Article are suspended. If the selected alternative method does not result in a resolution, the Union may return to the grievance process and the time frames resume. Any expenses and fees of alternative methods will be shared equally by the parties.
NETWORK INTERCONNECTION METHODS 3.1 The Interconnection provided herein may not be used solely for the purpose of originating a Party’s own interexchange traffic.
Service Providing Methodology 1.3.1 Party A and Party B agree that during the term of this Agreement, where necessary, Party B may enter into further service agreements with Party A or any other party designated by Party A, which shall provide the specific contents, manner, personnel, and fees for the specific services. 1.3.2 To fulfill this Agreement, Party A and Party B agree that during the term of this Agreement, where necessary, Party B may enter into equipment or property leases with Party A or any other party designated by Party A which shall permit Party B to use Party A’s relevant equipment or property based on the needs of the business of Party B. 1.3.3 Party B hereby grants to Party A an irrevocable and exclusive option to purchase from Party B, at Party A’s sole discretion, any or all of the assets and business of Party B, to the extent permitted under PRC law, at the lowest purchase price permitted by PRC law. The Parties shall then enter into a separate assets or business transfer agreement, specifying the terms and conditions of the transfer of the assets.
Claims Review Methodology a. C laims Review Population. A description of the Population subject to the Quarterly Claims Review.
Allocation Method (Choose one of a. or b.): a. [ ] All the same. Using the same allocation method as applies to the Signatory Employer under this Election 28. b. [ ] At least one different. Under the following allocation method(s): .
GSA Benchmarked Pricing Additionally, where the NYS Net Price is based upon an approved GSA Supply Schedule:
Sentencing Guidelines Calculations Defendant understands that in imposing sentence the Court will be guided by the United States Sentencing Guidelines. Defendant understands that the Sentencing Guidelines are advisory, not mandatory, but that the Court must consider the Guidelines in determining a reasonable sentence.
Attachment A, Scope of Services The scope of services is amended as follows: