MISSION DESCRIPTION Sample Clauses

MISSION DESCRIPTION. The equivalent still air distance is the actual route distance (range) corrected for the average winds. Head winds are negative. [***] have been used. The maximum take-off weight for each departure airport is based on the conditions specified in paragraph 2.0 and is in compliance with FAR 25 take-off requirements. The missions are flown in ISA conditions throughout. A fixed allowance of fuel dependent on take-off weight is considered for take-off and acceleration to initial climb speed at [***] ft above the airport elevation. Climb is made starting [***] ft above the airport elevation to the initial cruise pressure altitude specified in the table above using a climb speed schedule of [***] KCAS/ [***] M.
AutoNDA by SimpleDocs
MISSION DESCRIPTION. The equivalent still air range (stage length) is the actual route distance corrected for the average winds. Head winds are negative. The maximum take-off weight for each departure airport ("from") is based on the conditions specified in paragraph 2.0 and is in compliance with FAR 25 take-off requirements. The missions are flown in ISA conditions throughout. Climb is made starting at the airport elevation to the initial cruise pressure altitude specified in Table 1 above using a climb speed schedule of [***] KCAS/ [***] M. Cruise is at the pressure altitude specified in Table 1 at an average cruise Mach number of [***] M. Thrust during cruise is not to exceed maximum cruise thrust.
MISSION DESCRIPTION. The equivalent still air range (stage length) is the actual route distance corrected for the average winds. Head winds are negative. The maximum take-off weight for each departure airport ("from") is based on the conditions specified in paragraph 2.0 and is in compliance with FAR 25 take-off requirements. The missions are flown in ISA conditions throughout. Climb is made starting at the airport elevation to the initial cruise pressure altitude specified in Table 1 above using a climb speed schedule of [***] KCAS/ [***] M. Cruise is at the pressure altitude specified in Table 1 at an average cruise Mach number of [***] M. Thrust during cruise is not to exceed maximum cruise thrust. When a second cruise pressure altitude is specified in Table 1, a [***] ft step climb from the first to the second pressure altitude is made using a climb speed schedule of [***] KCAS/ [***] M. It is followed by a cruise at the second pressure altitude at an average cruise Mach number of [***] M.
MISSION DESCRIPTION. The equivalent still air range (stage length) is the actual route distance corrected for the average winds. The missions are flown in *** conditions throughout. Take-off is made with engines at full take-off thrust. Climb is made starting at *** above the airport elevation to the initial cruise pressure altitude specified in the table above using a climb speed schedule of ***. Cruise is at the pressure altitude specified in the table above at cruise Mach number of ***. Thrust during cruise is not to exceed *** thrust. When a second cruise pressure altitude is specified in Table 1, a step climb from the first to the second pressure altitude is made using a climb speed schedule of ***. It is followed by a cruise at the second pressure altitude at cruise Mach number of ***. Descent is made from the final cruise pressure altitude in the table above *** using a descent speed schedule of ***.
MISSION DESCRIPTION. The equivalent still air distance is the actual route distance (range) corrected for the average winds. Head winds are negative. 85% average winter winds (Boeing model) have been used. The maximum take-off weight for each departure airport is based on the conditions specified in paragraph 2.0 and is in compliance with FAR 25 take-off requirements. The missions are flown in ISA conditions throughout. A fixed allowance of fuel dependent on take-off weight is considered for take-off and acceleration to initial climb speed at 1500 ft above the airport elevation. Climb is made starting 1500 ft above the airport elevation to the initial cruise pressure altitude specified in the table above using a climb speed schedule of 250 KCAS/ 0.70 M. Cruise is at the pressure altitude specified in the table at an average cruise Mach number of 0.74 M. Thrust during cruise is not to exceed maximum cruise thrust.

Related to MISSION DESCRIPTION

  • Project Description The Project Description may be changed from time to time by, or with the consent of, the Company provided that any such change shall also be filed with the Issuer and provided further that no change in the Project Description shall materially change the function of the Project Facilities unless the Trustee shall have received (i) an Engineer's certificate that such changes will not impair the significance or character of the Project Facilities as Pollution Control Facilities and (ii) an Opinion of Bond Counsel or ruling of the Internal Revenue Service to the effect that such amendment will not adversely affect the exclusion of interest on the Bonds from gross income for federal income tax purposes.

  • Investment Description Each Fund will invest and reinvest its assets in accordance with the investment objective(s), policies and limitations specified in the prospectus (the “Prospectus”) relating to such Fund filed with the Securities and Exchange Commission (the “SEC”) as part of the Fund’s Registration Statement on Form N-1A, as it may be periodically amended or supplemented and in accordance with exemptive orders and no-action letters issued to the Trust by the SEC and its staff.

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • Aircraft Description The Option Aircraft are described by Boeing Detail Specification D6-38808, Revision E, dated September 15, 1995, as amended and revised pursuant to the Agreement.

  • General Description Employer shall provide Employee with the compensation, incentives, benefits, and business expense reimbursement specified elsewhere in this agreement.

  • Service Description The Transfer Agent updates the System daily to reflect each day's business activity. The Fund relies upon the timely update of information in order to respond to investor's inquiries. The Transfer Agent will provide Dreyfus with a System report indicating the time of day that files were updated and available for Dreyfus. The timeliness of availability of these screens with updated information will determine the Transfer Agent's level of performance.

  • Legal Description 1.1. Lot Name: Guazapares

  • Product Description The Products are described in the Product Unique Attachment(s). Products also include all FRUs, CSPs, Product code, and Product documentation.

  • Job Description 2.1 You will perform the duties and responsibilities set out in Schedule "A" to this Letter Agreement, and such other incidental duties and responsibilities as may be required by the Company and assigned to you from time to time (the "Services").

  • Property Description The Property is described as follows:

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!